متابعة
Annisa Kesy Garside
Annisa Kesy Garside
Industrial Engineering, University of Muhammadiyah Malang
بريد إلكتروني تم التحقق منه على umm.ac.id
عنوان
عدد مرات الاقتباسات
عدد مرات الاقتباسات
السنة
Manajemen Logistik
AK Garside, D Rahmasari
Universitas Muhammadiyah Malang, 2017
912017
Perancangan Website Sebagai Media Promosi Dan Penjualan Pada Home Industry Abon
SK Dewi, AK Garside
Jurnal Teknik Industri 15 (2), 170-181, 2014
702014
Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
H Rachman, AK Garside, HM Kholik
Jurnal Teknik Industri 18 (1), 86-93, 2017
652017
The measurement of physical workload and mental workload level of medical personnel
DP Restuputri, AK Pangesti, AK Garside
Jurnal Teknik Industri 20 (1), 34-44, 2019
472019
Artificial bee colony algorithm for solving green vehicle routing problems with time windows
DM Utama, TA Fitria, AK Garside
Journal of Physics: Conference Series 1933 (1), 012043, 2021
312021
Simulasi ketersediaan beras di Jawa Timur
AK Garside, HY Asjari
Jurnal Ilmiah Teknik Industri 14 (1), 47-58, 2015
262015
penjadwalan produksi menggunakan algoritma jadwal non delay untuk meminimalkan makespan studi kasus di cv. Bima mebel
S Harto, AK Garside, DM Utama
spektrum industri 14 (1), 79, 2016
252016
Penerapan Lean Manufacturing untuk Meminimasi Waste Percetakan Box
ED Krisnanti, AK Garside
Jurnal INTECH Teknik Industri Universitas Serang Raya 8 (2), 99-108, 2022
212022
Penjadwalan job shop dengan pendekatan algoritma artificial immune system
R Nasution, AK Garside, DM Utama
Jurnal Teknik Industri 18 (1), 29-42, 2017
202017
Penjadwalan Flow Shop untuk Meminimasi Total Tardiness Menggunakan Algoritma Cross Entropy–Algoritma Genetika
DM Utama, LR Ardiansyah, AK Garside
Jurnal Optimasi Sistem Industri 18 (2), 133–141-133–141, 2019
182019
Perancangan Sistem Informasi Laboratorium Teknik Industri Universitas Muhammadiyah Malang
AK Garside, DM Utama
Research Report 1 (1), 2017
152017
A recent review of solution approaches for green vehicle routing problem and its variants
AK Garside, R Ahmad, MNB Muhtazaruddin
Operations Research Perspectives, 100303, 2024
142024
Pengembangan algoritma hybrid flowshop three-stage dengan mempertimbangkan waktu setup
DM Utama, AK Garside, W Wicaksono
Jurnal Ilmiah Teknik Industri 18 (1), 72-78, 2019
142019
Penguatan Aspek Produksi dan Pemasaran pada Usaha Keripik Singkong Mix Sayur
AK Garside, T Baroto, ORG Waibo
JPPM (Jurnal Pengabdian dan Pemberdayaan Masyarakat) 4 (1), 61-68, 2020
132020
A Cluster-First Route-Second Heuristic Approach to Solve The Multi-Trip Periodic Vehicle Routing Problem
AK Garside, NR Laili
Jurnal Teknik Industri 20 (2), 172-181, 2019
132019
Particle swarm optimization algorithm to solve vehicle routing problem with fuel consumption minimization
BNIF Ramadhani, AK Garside
Jurnal Optimasi Sistem Industri 20 (1), 1–10-1–10, 2021
122021
A modified camel algorithm for optimizing green vehicle routing problem with time windows
DM Utama, WON Safitri, AK Garside
Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri 24 (1 …, 2022
112022
Pengurangan Bullwhip Effect dengan Metode Vendor Managed Inventory
FR Dewi, AK Garside
Jurnal Optimasi Sistem Industri 14 (2), 292–298-292–298, 2015
112015
Pengaruh Penambahan Campuran Serbuk Kayu Terhadap Kuat Tekan Beton
A Purwoto, AK Garside
Jurnal Profesi Insinyur Indonesia UMM 1 (1), 2021
102021
Model program dinamis untuk lot size multi item dengan kendala kapasitas gudang
DM Utama, AK Garside, H Pamungkas
J@ ti Undip: Jurnal Teknik Industri 14 (1), 21-26, 2019
102019
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20