متابعة
Jennifer Cross
Jennifer Cross
Associate Professor of Industrial, Manufacturing, & Systems Engineering; Texas Tech University
بريد إلكتروني تم التحقق منه على ttu.edu - الصفحة الرئيسية
عنوان
عدد مرات الاقتباسات
عدد مرات الاقتباسات
السنة
Integrating the warehousing and transportation functions of the supply chain
SJ Mason, PM Ribera, JA Farris, RG Kirk
Transportation Research Part E: Logistics and Transportation Review 39 (2 …, 2003
3722003
Critical success factors for human resource outcomes in Kaizen events: An empirical study
JA Farris, EM Van Aken, TL Doolen, J Worley
International journal of production economics 117 (1), 42-65, 2009
3592009
Critical success factors for the sustainability of Kaizen event human resource outcomes: An empirical study
WJ Glover, JA Farris, EM Van Aken, TL Doolen
International journal of production economics 132 (2), 197-213, 2011
2942011
Lean product development research: Current state and future directions
HCM León, JA Farris
Engineering Management Journal 23 (1), 29-51, 2011
2372011
Learning from less successful Kaizen events: a case study
JA Farris, EM Van Aken, TL Doolen, J Worley
Engineering management journal 20 (3), 10-20, 2008
2122008
Kaizen events and organizational performance: a field study
TL Doolen, EM Van Aken, JA Farris, JM Worley, J Huwe
International journal of productivity and performance management 57 (8), 637-658, 2008
1812008
A framework for designing, managing, and improving Kaizen event programs
EM Van Aken, JA Farris, WJ Glover, G Letens
International Journal of Productivity and Performance Management 59 (7), 641-667, 2010
1422010
Systematic mechanism for identifying the relative impact of supply chain performance areas on the overall supply chain performance using SCOR model and SEM
CK Dissanayake, JA Cross
International Journal of Production Economics 201, 102-115, 2018
1342018
Towards a theoretical foundation for performance measurement and management
US Bititci, M Bourne, JAF Cross, SS Nudurupati, K Sang
Wiley, 2018
1302018
Evaluating the relative performance of engineering design projects: A case study using data envelopment analysis
JA Farris, RL Groesbeck, EM Van Aken, G Letens
IEEE Transactions on Engineering Management 53 (3), 471-482, 2006
1282006
Assessing maturity and effectiveness of enterprise performance measurement systems
EM Van Aken, G Letens, GD Coleman, J Farris, D Van Goubergen
International Journal of Productivity and Performance Management 54 (5/6 …, 2005
1242005
Lean supply chain management in healthcare: a systematic review and meta-study
ST Khorasani, J Cross, O Maghazei
International Journal of Lean Six Sigma 11 (1), 1-34, 2020
1232020
A comprehensive model of project team technical performance
WH Liu, JA Cross
International Journal of Project Management 34 (7), 1150-1166, 2016
1212016
A multilevel framework for lean product development system design
G Letens, JA Farris, EM Van Aken
Engineering Management Journal 23 (1), 69-85, 2011
1182011
Green Lean Six Sigma for improving manufacturing sustainability: Framework development and validation
R Rathi, MS Kaswan, JA Garza-Reyes, J Antony, J Cross
Journal of Cleaner Production 345, 131130, 2022
1132022
Relationship between leadership and characteristics of learning organizations in deployed military units: An exploratory study
R Di Schiena, G Letens, E Van Aken, J Farris
Administrative Sciences 3 (3), 143-165, 2013
1012013
Critical elements for multigenerational teams: a systematic review
CM Burton, C Mayhall, J Cross, P Patterson
Team Performance Management: An International Journal 25 (7/8), 369-401, 2019
922019
The relationship between continuous improvement and rapid improvement sustainability
WJ Glover, JA Farris, EM Van Aken
International Journal of Production Research 53 (13), 4068-4086, 2015
902015
Kaizen events: Assessing the existing literature and convergence of practices
WJ Glover, JA Farris, EM Van Aken
Engineering Management Journal 26 (1), 39-61, 2014
852014
Continuous improvement project within Kaizen: critical success factors in hospitals
F Gonzalez-Aleu, EM Van Aken, J Cross, WJ Glover
The TQM Journal 30 (4), 335-355, 2018
842018
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20