Cause of construction delay-Theoretical framework N Hamzah, MA Khoiry, I Arshad, NM Tawil, AIC Ani Procedia engineering 20, 490-495, 2011 | 289 | 2011 |
Human emotion detection via brain waves study by using electroencephalogram (EEG) WW Ismail, M Hanif, SB Mohamed, N Hamzah, ZI Rizman International Journal on Advanced Science, Engineering and Information …, 2016 | 145 | 2016 |
Housing affordability: A conceptual overview for house price index MS Suhaida, NM Tawil, N Hamzah, AI Che-Ani, H Basri, MY Yuzainee Procedia Engineering 20, 346-353, 2011 | 121 | 2011 |
Using relative importance index method for developing risk map in oil and gas construction projects MA Kassem, MA Khoiry, N Hamzah Jurnal Kejuruteraan 32 (3), 441-453, 2020 | 79 | 2020 |
Assessment of the effect of external risk factors on the success of an oil and gas construction project M A Kassem, MA Khoiry, N Hamzah Engineering, Construction and Architectural Management 27 (9), 2767-2793, 2020 | 78 | 2020 |
Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen M A. Kassem, MA Khoiry, N Hamzah International Journal of Energy Sector Management 14 (3), 527-546, 2020 | 66 | 2020 |
Risk factors in oil and gas construction projects in developing countries: A case study M A. Kassem, MA Khoiry, N Hamzah International Journal of Energy Sector Management 13 (4), 846-861, 2019 | 65 | 2019 |
Identification of the causes of construction delay in Malaysia N Hamzah, MA Khoiry, I Arshad, WHW Badaruzzaman, NM Tawil International Journal of Civil and Environmental Engineering 6 (12), 1063-1068, 2012 | 62 | 2012 |
Factors contribute to delay project construction in higher learning education case study UKM NM Tawil, MA Khoiry, I Arshad, N Hamzah, MF Jasri, ... Research Journal of Applied Sciences, Engineering and Technology 5 (11 …, 2013 | 61 | 2013 |
Theoretical review on critical risk factors in oil and gas construction projects in Yemen M A Kassem, MA Khoiry, N Hamzah Engineering, Construction and Architectural Management 28 (4), 934-968, 2021 | 60 | 2021 |
Assessment of psychomotor domain in a problem-based concrete laboratory S Baharom, MA Khoiry, R Hamid, AA Mutalib, N Hamzah Journal of Engineering Science and Technology 10 (1), 1-10, 2015 | 51 | 2015 |
Structural modelling of internal risk factors for oil and gas construction projects M A. Kassem, MA Khoiry, N Hamzah International Journal of Energy Sector Management 14 (5), 975-1000, 2020 | 37 | 2020 |
Assessment of psychomotor domain in materials technology laboratory work R Hamid, S Baharom, N Hamzah, WHW Badaruzzaman, RAOK Rahmat, ... Procedia-Social and Behavioral Sciences 56, 718-723, 2012 | 34 | 2012 |
A conceptual overview of housing affordability in Selangor, Malaysia MS Suhaida, NM Tawil, N Hamzah, AI Che-Ani, MM Tahir World Academy of Science, Engineering and Technology 72, 45-47, 2010 | 32 | 2010 |
Evaluation of risk factors affecting on oil and gas construction projects in Yemen MA Kassem, MA Khoiry, N Hamzah Int. J. Eng. Technol 8 (1), 6-14, 2019 | 31 | 2019 |
Development of a non-domestic building refurbishment scheme for Malaysia: A Delphi approach SN Kamaruzzaman, ECW Lou, PF Wong, R Edwards, N Hamzah, ... Energy 167, 804-818, 2019 | 29 | 2019 |
A case study of maintenance management systems in Malaysian complex and high-rise industrialized building system buildings ZA Ismail, AA Mutalib, N Hamzah International Journal of economics and financial issues 6 (3), 28-35, 2016 | 29 | 2016 |
Pembelajaran berasaskan hasil: Prinsip dan cabaran MJM Nor, N Hamzah, H Basri, WHW Badaruzzaman Pascasidang Seminar Pengajaran dan Pembelajaran 2005, 54-62, 2006 | 27 | 2006 |
Building information modeling (BIM)-based building condition assessment: A survey of water ponding defect on a flat roof AIC Ani, S Johar, NM Tawil, MZ Abd Razak, N Hamzah Jurnal Teknologi 75 (9), 2015 | 26 | 2015 |
The importance of design process in housing quality N Hamzah, A Ramly, H Salleh, NM Tawil, MA Khoiry, AIC Ani Procedia Engineering 20, 483-489, 2011 | 26 | 2011 |