A modeling framework for engineered complex adaptive systems M Haghnevis, RG Askin IEEE Systems Journal 6 (3), 520-530, 2012 | 56 | 2012 |
An agent-based modeling optimization approach for understanding behavior of engineered complex adaptive systems M Haghnevis, RG Askin, D Armbruster Socio-Economic Planning Sciences 56, 67-87, 2016 | 26 | 2016 |
Batch production scheduling for semiconductor back-end operations M Fu, R Askin, J Fowler, M Haghnevis, N Keng, JS Pettinato, M Zhang IEEE Transactions on semiconductor manufacturing 24 (2), 249-260, 2011 | 26 | 2011 |
Machine qualification management for a semiconductor back-end facility M Fu, M Haghnevis, R Askin, J Fowler, M Zhang Proceedings of the 2010 Winter Simulation Conference, 2486-2492, 2010 | 17 | 2010 |
Design of the integrated information system, business, and production process by simulation A Azadeh, M Haghnevis, Y Khodadadegan Journal of the American society for information science and technology 59 (2 …, 2008 | 17 | 2008 |
An improved model for production systems with mixed queuing priorities: an integrated simulation, AHP and value engineering approach A Azadeh, M Haghnevis, Y Khodadadegan International Journal of Industrial and Systems Engineering 4 (5), 536-553, 2009 | 15 | 2009 |
A mathematical model of a multi-criteria parallel machine scheduling problem: a genetic algorithm R Tavakkoli-Moghaddam, F Jolai, Y Khodadadeghan, M Haghnevis International Journal of Engineering 19 (1), 79-86, 2006 | 15 | 2006 |
A model for assessment of project management risk models M Haghnevis, H Sajedi Proceedings of the 4th International Management Conference, Tehran, Iran, 20-21, 2006 | 8 | 2006 |
Scenario analysis of technology products with an agent-based simulation and data mining framework A Shinde, M Haghnevis, MA Janssen, GC Runger, M Janakiram International Journal of Innovation and Technology Management 10 (05), 1340019, 2013 | 7 | 2013 |
An agent-based optimization framework for engineered complex adaptive systems with application to demand response in electricity markets M Haghnevis Arizona State University, 2013 | 7 | 2013 |
An agent based simulation for building energy system modeling M Hu, J Wen, F Li, M Haghnevis, Y Khodadadegan, LM Sanchez, S Wang, ... Dynamic Systems and Control Conference 44182, 247-254, 2010 | 7 | 2010 |
An agent based simulation and data mining framework for scenario analysis of technology products A Shinde, M Haghnevis 2011, Retrievedfrom Open ABM.. http://www. openabm. org/model/2290/version/1, 2010 | 5 | 2010 |
Assessment of a complex machine mix problem by integrated simulation and AHP modeling A Azadeh, M Haghnevis, Y Khodadadegan Proceedings of 5th International Conference on Analysis of Manufacturing …, 2005 | 5 | 2005 |
A unique fuzzy simulation approach for concurrent improvement of customer satisfaction in integrated information and production processes with ambiguity A Azadeh, Z Raoofi, M Haghnevis, M Madadi Concurrent Engineering 20 (4), 287-299, 2012 | 4 | 2012 |
Modelling priority queues with dependent service discipline by computer simulation A Azadeh, M Haghnevis, Y Khodadadegan International Journal of Industrial and Systems Engineering 6 (1), 79-91, 2010 | 4 | 2010 |
Modeling and improvement of the integrated business and production processes by fuzzy simulation A Azadeh, M Haghnevis, Y Khodadadegan, M Madadi Proceedings of the 2009 Spring Simulation Multiconference, 1-8, 2009 | 4 | 2009 |
Design and assessment of the integrated information, business process and production system by simulation A Azadeh, M Haghnevis, Y Khodadadegan Proceedings of 5th International Conference on Analysis of Manufacturing …, 2005 | 4 | 2005 |
An integrated optimization and agent-based framework for the US power system M Haghnevis, A Shinde, RG Askin Procedia Computer Science 6, 451-456, 2011 | 3 | 2011 |
Maximizing value of perishable products by implementing RFID technology RG Askin, Y Khodadadegan, M Haghnevis IISE Annual Conference. Proceedings, 1, 2010 | 3 | 2010 |
Efficient algorithm for a multi-criteria parallel machine scheduling problem with sequence-dependent setup times [C] R Tavakkoli-Moghaddam, Y Khodadadeghan, M Haghnevis Proceedings of 5th International Symposium on Intelligent Manufacturing …, 2006 | 3 | 2006 |