Integrated scheduling of m-truck, m-drone, and m-depot constrained by time-window, drop-pickup, and m-visit using constraint programming AM Ham Transportation Research Part C: Emerging Technologies 91, 1-14, 2018 | 343 | 2018 |
Flexible job shop scheduling problem with parallel batch processing machines: MIP and CP approaches AM Ham, E Cakici Computers & Industrial Engineering 102, 160-165, 2016 | 85 | 2016 |
Transfer-robot task scheduling in job shop A Ham International Journal of Production Research, 1-11, 2020 | 69 | 2020 |
Transfer-robot task scheduling in flexible job shop A Ham Journal of Intelligent Manufacturing 31, 1783–1793, 2020 | 56 | 2020 |
Flexible job shop scheduling problem for parallel batch processing machine with compatible job families A Ham Applied Mathematical Modelling 45, 551-562, 2017 | 56 | 2017 |
An effective problem decomposition method for scheduling of diffusion processes based on mixed integer linear programming C Jung, D Pabst, M Ham, M Stehli, M Rothe IEEE Transactions on Semiconductor Manufacturing 27 (3), 357-363, 2014 | 52 | 2014 |
Energy-aware flexible job shop scheduling under time-of-use pricing MJ Park, A Ham International Journal of Production Economics 248, 108507, 2022 | 41 | 2022 |
Constraint programming approach for scheduling jobs with release times, non-identical sizes, and incompatible families on parallel batching machines A Ham, JW Fowler, E Cakici IEEE Transactions on Semiconductor Manufacturing 30 (4), 500-507, 2017 | 40 | 2017 |
Real-time scheduling of multi-stage flexible job shop floor M Ham, YH Lee, SH Kim International Journal of Production Research 49 (12), 3715-3730, 2011 | 36 | 2011 |
Drone-based material transfer system in a robotic mobile fulfillment center A Ham IEEE Transactions on Automation Science and Engineering 17 (2), 957-965, 2019 | 33 | 2019 |
Human–robot task allocation and scheduling: Boeing 777 case study A Ham, MJ Park IEEE Robotics and Automation Letters 6 (2), 1256-1263, 2021 | 30 | 2021 |
Scheduling of dual resource constrained lithography production: Using CP and MIP/CP A Ham IEEE Transactions on Semiconductor Manufacturing 31 (1), 52-61, 2017 | 30 | 2017 |
Energy‐Aware Flexible Job Shop Scheduling Using Mixed Integer Programming and Constraint Programming A Ham, MJ Park, KM Kim Mathematical Problems in Engineering 2021 (1), 8035806, 2021 | 29 | 2021 |
A practical two-phase approach to scheduling of photolithography production AM Ham, M Cho IEEE Transactions on Semiconductor Manufacturing 28 (3), 367-373, 2015 | 29 | 2015 |
Scheduling of wet etch and furnace operations with next arrival control heuristic M Ham, JW Fowler The International Journal of Advanced Manufacturing Technology 38 (9), 1006-1017, 2008 | 25 | 2008 |
Electric vehicle route optimization under time-of-use electricity pricing A Ham, MJ Park Ieee Access 9, 37220-37228, 2021 | 18 | 2021 |
IP-based real-time dispatching for two-machine batching problem with time window constraints M Ham, YH Lee, J An IEEE transactions on automation science and engineering 8 (3), 589-597, 2011 | 15 | 2011 |
Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility YH Lee, M Ham, B Yoo, JS Lee The International Journal of Advanced Manufacturing Technology 41, 568-579, 2009 | 14 | 2009 |
Dynamic wet-furnace dispatching/scheduling in wafer fab M Ham, M Raiford, F Dillard, W Risner, M Knisely, J Harrington, T Murtha, ... The 17th Annual SEMI/IEEE ASMC 2006 Conference, 144-147, 2006 | 14 | 2006 |
Integer programming-based real-time dispatching (i-RTD) heuristic for wet-etch station at wafer fabrication M Ham International journal of production research 50 (10), 2809-2822, 2012 | 13 | 2012 |