Automatic collision detection for assembly sequence planning using a three-dimensional solid model Alfadhlani, TMAA Samadhi, A Ma'ruf, IS Toha Journal of Advanced Manufacturing Systems 10 (02), 277-291, 2011 | 52 | 2011 |
Flexible job-shop scheduling with dual-resource constraints to minimize tardiness using genetic algorithm ABN Paksi, A Ma'ruf IOP conference series: materials science and engineering 114 (1), 012060, 2016 | 30 | 2016 |
Mixed model assembly line balancing for human-robot shared tasks S Yaphiar, C Nugraha, A Ma’ruf IMEC-APCOMS 2019: Proceedings of the 4th International Manufacturing …, 2020 | 27 | 2020 |
Automatic Precedence Constraint Generation for Assembly Sequence Planning using a Three-Dimensional Solid Model Alfadhlani, A Ma'ruf, IS Toha, TMAA Samadhi International Journal of Technology 10 (2), 2019 | 19 | 2019 |
Setup-Less Fabrication Technology Incorporated with Machining Feature-Based CAD/CAM System for Low Volume and High Product-Mix Machining Centre Workshop L Wang, W Zhao, A Ma'ruf, T Hoshi Proceedings of the 1996 International Manufacturing Engineering Conference …, 1996 | 15 | 1996 |
A mixed-integer linear programming formulation for assembly line balancing problem with human-robot shared tasks RC Nugraha, A Ma’ruf, A Cakravastia, AH Halim Journal of Physics: Conference Series 1858 (1), 012021, 2021 | 12 | 2021 |
Scheduling Method for MTS/MTO Production System Tadeuz, A Maruf IOP Conference Series: Materials Science and Engineering 114 (1), 012061, 2016 | 8 | 2016 |
Development of robust and redesigning cellular manufacturing system model considering routing flexibility, setup cost, and demand changes MSA Khannan, A Maruf | 8 | 2012 |
Cost and availability functions using imperfect maintenance policy for a serial system E Nursanti, A Ma'ruf, T Simatupang, BP Iskandar 2012 IEEE Symposium on Business, Engineering and Industrial Applications …, 2012 | 7 | 2012 |
Development of an assessment model for sustainable supply chain management in Batik industry GF Mubiena, A Ma’Ruf IOP Conference Series: Materials Science and Engineering 319 (1), 012073, 2018 | 6 | 2018 |
Predictive approach on flexible job shop scheduling problem considering controllable processing times A Yulianty, A Ma'ruf International Journal of Innovation, Management and Technology 4 (6), 565, 2013 | 6 | 2013 |
The Development of Human-Robot Collaborative Assembly Line Model by Considering Availability of Robots, Tools, and Setup Time A Ma'ruf, C Nugraha, AS Tarigan Jurnal Ilmiah Teknik Industri 21 (2), 319-327, 2022 | 5 | 2022 |
Improving quality of shoe soles product using six sigma AJ Wijaya, W Trusaji, M Akbar, A Ma’ruf, D Irianto IOP Conference Series: Materials Science and Engineering 319 (1), 012049, 2018 | 5 | 2018 |
Freezing issue on stability master production scheduling for supplier network: Decision making view A Aisyati, TMAA Samadhi, A Ma’ruf, A Cakravastia MATEC Web of Conferences 124, 08002, 2017 | 5 | 2017 |
Cellular manufacturing system with dynamic lot size material handling MSA Khannan, A Maruf, R Wangsaputra, S Sutrisno, T Wibawa IOP conference series: materials science and engineering 114 (1), 012144, 2016 | 5 | 2016 |
Real-time monitoring design for make-to-order industry SC Adisasmito, PD Pamungkas, A Ma’ruf AIP Conference Proceedings 2470 (1), 2022 | 4 | 2022 |
A framework for the development of automatic DFA method to minimize the number of components and assembly reorientations Alfadhlani, TMAA Samadhi, A Ma’ruf, IS Toha IOP Conference Series: Materials Science and Engineering 319 (1), 012083, 2018 | 3 | 2018 |
Hybrid minimal repair for a serial system E Nursanti, A Ma'ruf, T Simatupang, BP Iskandar International Journal of Industrial and Manufacturing Engineering 5 (12 …, 2011 | 3* | 2011 |
Implementation of a CAD/CAM software for job shop machining center work with external setup capability A Ma'ruf Flexible Automation and Integrated Manufacturing 1999, 1999 | 3 | 1999 |
Machine Learning Approach for Early Assembly Design Cost Estimation: A Case from Make-to-Order Manufacturing Industry A Ma’ruf, AAR Nasution, RAC Leuveano Machine Learning 15 (4), 2024 | 2 | 2024 |