Segueix
Anas Ma'ruf
Anas Ma'ruf
Correu electrònic verificat a itb.ac.id
Títol
Citada per
Citada per
Any
Automatic collision detection for assembly sequence planning using a three-dimensional solid model
Alfadhlani, TMAA Samadhi, A Ma'ruf, IS Toha
Journal of Advanced Manufacturing Systems 10 (02), 277-291, 2011
522011
Flexible job-shop scheduling with dual-resource constraints to minimize tardiness using genetic algorithm
ABN Paksi, A Ma'ruf
IOP conference series: materials science and engineering 114 (1), 012060, 2016
302016
Mixed model assembly line balancing for human-robot shared tasks
S Yaphiar, C Nugraha, A Ma’ruf
IMEC-APCOMS 2019: Proceedings of the 4th International Manufacturing …, 2020
272020
Automatic Precedence Constraint Generation for Assembly Sequence Planning using a Three-Dimensional Solid Model
Alfadhlani, A Ma'ruf, IS Toha, TMAA Samadhi
International Journal of Technology 10 (2), 2019
192019
Setup-Less Fabrication Technology Incorporated with Machining Feature-Based CAD/CAM System for Low Volume and High Product-Mix Machining Centre Workshop
L Wang, W Zhao, A Ma'ruf, T Hoshi
Proceedings of the 1996 International Manufacturing Engineering Conference …, 1996
151996
A mixed-integer linear programming formulation for assembly line balancing problem with human-robot shared tasks
RC Nugraha, A Ma’ruf, A Cakravastia, AH Halim
Journal of Physics: Conference Series 1858 (1), 012021, 2021
122021
Scheduling Method for MTS/MTO Production System
Tadeuz, A Maruf
IOP Conference Series: Materials Science and Engineering 114 (1), 012061, 2016
82016
Development of robust and redesigning cellular manufacturing system model considering routing flexibility, setup cost, and demand changes
MSA Khannan, A Maruf
82012
Cost and availability functions using imperfect maintenance policy for a serial system
E Nursanti, A Ma'ruf, T Simatupang, BP Iskandar
2012 IEEE Symposium on Business, Engineering and Industrial Applications …, 2012
72012
Development of an assessment model for sustainable supply chain management in Batik industry
GF Mubiena, A Ma’Ruf
IOP Conference Series: Materials Science and Engineering 319 (1), 012073, 2018
62018
Predictive approach on flexible job shop scheduling problem considering controllable processing times
A Yulianty, A Ma'ruf
International Journal of Innovation, Management and Technology 4 (6), 565, 2013
62013
The Development of Human-Robot Collaborative Assembly Line Model by Considering Availability of Robots, Tools, and Setup Time
A Ma'ruf, C Nugraha, AS Tarigan
Jurnal Ilmiah Teknik Industri 21 (2), 319-327, 2022
52022
Improving quality of shoe soles product using six sigma
AJ Wijaya, W Trusaji, M Akbar, A Ma’ruf, D Irianto
IOP Conference Series: Materials Science and Engineering 319 (1), 012049, 2018
52018
Freezing issue on stability master production scheduling for supplier network: Decision making view
A Aisyati, TMAA Samadhi, A Ma’ruf, A Cakravastia
MATEC Web of Conferences 124, 08002, 2017
52017
Cellular manufacturing system with dynamic lot size material handling
MSA Khannan, A Maruf, R Wangsaputra, S Sutrisno, T Wibawa
IOP conference series: materials science and engineering 114 (1), 012144, 2016
52016
Real-time monitoring design for make-to-order industry
SC Adisasmito, PD Pamungkas, A Ma’ruf
AIP Conference Proceedings 2470 (1), 2022
42022
A framework for the development of automatic DFA method to minimize the number of components and assembly reorientations
Alfadhlani, TMAA Samadhi, A Ma’ruf, IS Toha
IOP Conference Series: Materials Science and Engineering 319 (1), 012083, 2018
32018
Hybrid minimal repair for a serial system
E Nursanti, A Ma'ruf, T Simatupang, BP Iskandar
International Journal of Industrial and Manufacturing Engineering 5 (12 …, 2011
3*2011
Implementation of a CAD/CAM software for job shop machining center work with external setup capability
A Ma'ruf
Flexible Automation and Integrated Manufacturing 1999, 1999
31999
Machine Learning Approach for Early Assembly Design Cost Estimation: A Case from Make-to-Order Manufacturing Industry
A Ma’ruf, AAR Nasution, RAC Leuveano
Machine Learning 15 (4), 2024
22024
En aquests moments el sistema no pot dur a terme l'operació. Torneu-ho a provar més tard.
Articles 1–20