Risk assessment methodology for underground construction projects HH Choi, HN Cho, JW Seo Journal of construction Engineering and management 130 (2), 258-272, 2004 | 304 | 2004 |
Comparison and utilization of point cloud generated from photogrammetry and laser scanning: 3D world model for smart heavy equipment planning D Moon, S Chung, S Kwon, J Seo, J Shin Automation in Construction 98, 322-331, 2019 | 187 | 2019 |
Interaction analysis for vision-based activity identification of earthmoving excavators and dump trucks J Kim, S Chi, J Seo Automation in Construction 87, 297-308, 2018 | 175 | 2018 |
A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects YS Kim, SW Oh, YK Cho, JW Seo Automation in construction 17 (2), 163-179, 2008 | 146 | 2008 |
Assessment of operator's situation awareness for smart operation of mobile cranes Y Fang, YK Cho, F Durso, J Seo Automation in Construction 85, 65-75, 2018 | 134 | 2018 |
Risk-based safety impact assessment methodology for underground construction projects in Korea JW Seo, HH Choi Journal of construction engineering and management 134 (1), 72-81, 2008 | 122 | 2008 |
Task planner design for an automated excavation system J Seo, S Lee, J Kim, SK Kim Automation in Construction 20 (7), 954-966, 2011 | 112 | 2011 |
BIM-based tunnel information modeling framework for visualization, management, and simulation of drill-and-blast tunneling projects A Sharafat, MS Khan, K Latif, J Seo Journal of Computing in Civil Engineering 35 (2), 04020068, 2021 | 99 | 2021 |
Improving dynamic proximity sensing and processing for smart work-zone safety JW Park, X Yang, YK Cho, J Seo Automation in Construction 84, 111-120, 2017 | 85 | 2017 |
Optical marker‐based end effector pose estimation for articulated excavators KM Lundeen, S Dong, N Fredricks, M Akula, J Seo, VR Kamat Automation in Construction 65, 51-64, 2016 | 81 | 2016 |
Task planning strategy and path similarity analysis for an autonomous excavator J Kim, D Lee, J Seo Automation in Construction 112, 103108, 2020 | 76 | 2020 |
Simulation-based assessment of workers’ muscle fatigue and its impact on construction operations JO Seo, SH Lee, J Seo Journal of Construction Engineering and Management 142 (11), 04016063, 2016 | 73 | 2016 |
Intelligent navigation strategies for an automated earthwork system SK Kim, J Seo, JS Russell Automation in Construction 21, 132-147, 2012 | 72 | 2012 |
Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditions A Sharafat, K Latif, J Seo Tunnelling and Underground Space Technology 111, 103860, 2021 | 68 | 2021 |
BIM-GIS-based integrated framework for underground utility management system for earthwork operations A Sharafat, MS Khan, K Latif, WA Tanoli, W Park, J Seo Applied Sciences 11 (12), 5721, 2021 | 61 | 2021 |
Damage Prevention for underground utilities using machine guidance WA Tanoli, A Sharafat, J Park, JW Seo Automation in Construction 107, 102893, 2019 | 58 | 2019 |
Implementation experiments on convolutional neural network training using synthetic images for 3D pose estimation of an excavator on real images B Mahmood, SU Han, J Seo Automation in Construction 133, 103996, 2022 | 50 | 2022 |
Geotechnical property modeling and construction safety zoning based on GIS and BIM integration MS Khan, J Park, J Seo Applied Sciences 11 (9), 4004, 2021 | 49 | 2021 |
Structural dynamic behavior of skew sandwich plates with laminated composite faces T Park, SY Lee, JW Seo, GZ Voyiadjis Composites Part B: Engineering 39 (2), 316-326, 2008 | 49 | 2008 |
Controlled blasting in underground construction: A case study of a tunnel plug demolition in the Neelum Jhelum hydroelectric project A Sharafat, WA Tanoli, G Raptis, JW Seo Tunnelling and Underground Space Technology 93, 103098, 2019 | 46 | 2019 |