Computer vision-based interior construction progress monitoring: A literature review and future research directions B Ekanayake, JKW Wong, AAF Fini, P Smith Automation in construction 127, 103705, 2021 | 127 | 2021 |
BIM-enabled sustainability assessment of material supply decisions AAF Fini, TH Rashidi, A Akbarnezhad, ST Waller Engineering, Construction and Architectural Management, 2017 | 99 | 2017 |
Factors Influencing BIM Adoption in Small and Medium Sized Construction Organizations Y Hong, SME Sepasgozar, AAF Fini, A Akbarnezhad International Symposium on Automation and Robotics in Construction (ISARC …, 2016 | 65 | 2016 |
Incorporating multiskilling and learning in the optimization of crew composition A Ahmadian Fard Fini, TH Rashidi, A Akbarnezhad, S Travis Waller Journal of Construction Engineering and Management 142 (5), 04015106, 2016 | 57 | 2016 |
Accounting for transport times in planning off-site shipment of construction materials AAF Fini, A Akbarnezhad, TH Rashidi, ST Waller Journal of Construction Engineering and Management 142 (1), 04015050, 2016 | 54 | 2016 |
Applications of electroencephalography in construction S Saedi, AAF Fini, M Khanzadi, J Wong, M Sheikhkhoshkar, M Banaei Automation in Construction 133, 103985, 2022 | 49 | 2022 |
Optimization of job allocation in construction organizations to maximize workers’ career development opportunities B Shahbazi, A Akbarnezhad, D Rey, A Ahmadian Fard Fini, M Loosemore Journal of Construction Engineering and Management 145 (6), 04019036, 2019 | 37 | 2019 |
Job assignment based on brain demands and human resource strategies A Ahmadian Fard Fini, A Akbarnezhad, TH Rashidi, ST Waller Journal of Construction Engineering and Management 143 (5), 04016123, 2017 | 32 | 2017 |
Importance of planning for the transport stage in procurement of construction materials AAF Fini, A Akbarnezhad, TH Rashidi, ST Waller ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2014 | 32 | 2014 |
Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction A Ahmadian Fard Fini, M Maghrebi, PJ Forsythe, TS Waller Engineering, Construction and Architectural Management 29 (2), 573-600, 2022 | 31 | 2022 |
Dynamic programming approach toward optimization of workforce planning decisions A Ahmadian Fard Fini, A Akbarnezhad, TH Rashidi, ST Waller Journal of Construction Engineering and Management 144 (2), 04017113, 2018 | 28 | 2018 |
Mass-customisation of cross-laminated timber wall systems at early design stages AJ Yazdi, AAF Fini, P Forsythe Automation in Construction 132, 103938, 2021 | 25 | 2021 |
Addressing practical challenge of using autopilot drone for asphalt surface monitoring: Road detection, segmentation, and following H Ranjbar, P Forsythe, AAF Fini, M Maghrebi, TS Waller Results in Engineering 18, 101130, 2023 | 20 | 2023 |
Enhancing the safety of construction crew by accounting for brain resource requirements of activities in job assignment AAF Fini, A Akbarnezhad, TH Rashidi, ST Waller Automation in Construction 88, 31-43, 2018 | 17 | 2018 |
Barriers to reusing and recycling office fit-out: An exploratory analysis of demolition processes and product features AAF Fini, P Forsythe Construction Economics and Building 20 (4), 42-62, 2020 | 15 | 2020 |
Causes of common and frequent claims in oil, gas and petrochemical projects of Iran SH Hasheminasab, MM Mortaheb, A Ahmadian F.F. KSCE Journal of Civil Engineering 18 (5), 1270-1278, 2014 | 14 | 2014 |
Quantifying demolition fitout waste from Australian office buildings P Forsythe, A Ahmadian Fard Fini Facilities 36 (11/12), 600-617, 2018 | 11 | 2018 |
Effects of planning regulations on housing and land markets: A system dynamics modeling approach D Jalali, H MacDonald, AAF Fini, S Shi Cities 126, 103670, 2022 | 10 | 2022 |
A deep learning-based approach to facilitate the as-built state recognition of indoor construction works B Ekanayake, A Ahmadian Fard Fini, JKW Wong, P Smith Construction Innovation 24 (4), 933-949, 2024 | 8 | 2024 |
Optimization of flexible lift processes on high-rise building construction sites AJ Yazdi, P Forsythe, AAF Fini, M Maghrebi Automation in Construction 107, 102939, 2019 | 8 | 2019 |