Sledovat
Alireza A. F. Fini
Alireza A. F. Fini
Další jménaAlireza Ahmadian Fard Fini
E-mailová adresa ověřena na: uts.edu.au
Název
Citace
Citace
Rok
Computer vision-based interior construction progress monitoring: A literature review and future research directions
B Ekanayake, JKW Wong, AAF Fini, P Smith
Automation in construction 127, 103705, 2021
1272021
BIM-enabled sustainability assessment of material supply decisions
AAF Fini, TH Rashidi, A Akbarnezhad, ST Waller
Engineering, Construction and Architectural Management, 2017
992017
Factors Influencing BIM Adoption in Small and Medium Sized Construction Organizations
Y Hong, SME Sepasgozar, AAF Fini, A Akbarnezhad
International Symposium on Automation and Robotics in Construction (ISARC …, 2016
652016
Incorporating multiskilling and learning in the optimization of crew composition
A Ahmadian Fard Fini, TH Rashidi, A Akbarnezhad, S Travis Waller
Journal of Construction Engineering and Management 142 (5), 04015106, 2016
572016
Accounting for transport times in planning off-site shipment of construction materials
AAF Fini, A Akbarnezhad, TH Rashidi, ST Waller
Journal of Construction Engineering and Management 142 (1), 04015050, 2016
542016
Applications of electroencephalography in construction
S Saedi, AAF Fini, M Khanzadi, J Wong, M Sheikhkhoshkar, M Banaei
Automation in Construction 133, 103985, 2022
492022
Optimization of job allocation in construction organizations to maximize workers’ career development opportunities
B Shahbazi, A Akbarnezhad, D Rey, A Ahmadian Fard Fini, M Loosemore
Journal of Construction Engineering and Management 145 (6), 04019036, 2019
372019
Job assignment based on brain demands and human resource strategies
A Ahmadian Fard Fini, A Akbarnezhad, TH Rashidi, ST Waller
Journal of Construction Engineering and Management 143 (5), 04016123, 2017
322017
Importance of planning for the transport stage in procurement of construction materials
AAF Fini, A Akbarnezhad, TH Rashidi, ST Waller
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2014
322014
Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction
A Ahmadian Fard Fini, M Maghrebi, PJ Forsythe, TS Waller
Engineering, Construction and Architectural Management 29 (2), 573-600, 2022
312022
Dynamic programming approach toward optimization of workforce planning decisions
A Ahmadian Fard Fini, A Akbarnezhad, TH Rashidi, ST Waller
Journal of Construction Engineering and Management 144 (2), 04017113, 2018
282018
Mass-customisation of cross-laminated timber wall systems at early design stages
AJ Yazdi, AAF Fini, P Forsythe
Automation in Construction 132, 103938, 2021
252021
Addressing practical challenge of using autopilot drone for asphalt surface monitoring: Road detection, segmentation, and following
H Ranjbar, P Forsythe, AAF Fini, M Maghrebi, TS Waller
Results in Engineering 18, 101130, 2023
202023
Enhancing the safety of construction crew by accounting for brain resource requirements of activities in job assignment
AAF Fini, A Akbarnezhad, TH Rashidi, ST Waller
Automation in Construction 88, 31-43, 2018
172018
Barriers to reusing and recycling office fit-out: An exploratory analysis of demolition processes and product features
AAF Fini, P Forsythe
Construction Economics and Building 20 (4), 42-62, 2020
152020
Causes of common and frequent claims in oil, gas and petrochemical projects of Iran
SH Hasheminasab, MM Mortaheb, A Ahmadian F.F.
KSCE Journal of Civil Engineering 18 (5), 1270-1278, 2014
142014
Quantifying demolition fitout waste from Australian office buildings
P Forsythe, A Ahmadian Fard Fini
Facilities 36 (11/12), 600-617, 2018
112018
Effects of planning regulations on housing and land markets: A system dynamics modeling approach
D Jalali, H MacDonald, AAF Fini, S Shi
Cities 126, 103670, 2022
102022
A deep learning-based approach to facilitate the as-built state recognition of indoor construction works
B Ekanayake, A Ahmadian Fard Fini, JKW Wong, P Smith
Construction Innovation 24 (4), 933-949, 2024
82024
Optimization of flexible lift processes on high-rise building construction sites
AJ Yazdi, P Forsythe, AAF Fini, M Maghrebi
Automation in Construction 107, 102939, 2019
82019
Systém momentálně nemůže danou operaci provést. Zkuste to znovu později.
Články 1–20