A systematic approach for resource allocation in software projects LD Otero, G Centeno, AJ Ruiz-Torres, CE Otero Computers & Industrial Engineering 56 (4), 1333-1339, 2009 | 125 | 2009 |
Path loss models for low-power, low-data rate sensor nodes for smart car parking systems TO Olasupo, CE Otero, LD Otero, KO Olasupo, I Kostanic IEEE transactions on intelligent transportation systems 19 (6), 1774-1783, 2017 | 75 | 2017 |
Proof of concept for using unmanned aerial vehicles for high mast pole and bridge inspections. LD Otero Florida. Dept. of Transportation. Research Center, 2015 | 70 | 2015 |
Software engineering design: theory and practice C Otero CRC Press, 2012 | 60 | 2012 |
A quality-based requirement prioritization framework using binary inputs CE Otero, E Dell, A Qureshi, LD Otero 2010 Fourth Asia International Conference on Mathematical/Analytical …, 2010 | 52 | 2010 |
Multiresponse optimization of stochastic WSN deployment using response surface methodology and desirability functions CE Otero, WH Shaw, I Kostanic, LD Otero IEEE Systems Journal 4 (1), 39-48, 2010 | 46 | 2010 |
A fuzzy expert system architecture for capability assessments in skill-based environments LD Otero, CE Otero Expert Systems with Applications 39 (1), 654-662, 2012 | 43 | 2012 |
C3: A finite volume-finite difference hybrid model for tsunami propagation and runup M Olabarrieta, R Medina, M Gonzalez, L Otero Computers & geosciences 37 (8), 1003-1014, 2011 | 32 | 2011 |
Environmental sound classification with tiny transformers in noisy edge environments S Wyatt, D Elliott, A Aravamudan, CE Otero, LD Otero, ... 2021 IEEE 7th World Forum on Internet of Things (WF-IoT), 309-314, 2021 | 30 | 2021 |
Deep learning models for visibility forecasting using climatological data LC Ortega, LD Otero, M Solomon, CE Otero, A Fabregas International Journal of Forecasting 39 (2), 992-1004, 2023 | 28 | 2023 |
Development of a simulator for stochastic deployment of wireless sensor networks. CE Otero, I Kostanic, LD Otero J. Networks 4 (8), 754-762, 2009 | 27 | 2009 |
A DEA–Tobit analysis to understand the role of experience and task factors in the efficiency of software engineers LD Otero, G Centeno, CE Otero, K Reeves IEEE Transactions on Engineering Management 59 (3), 391-400, 2012 | 26 | 2012 |
Application of machine learning algorithms for visibility classification L Ortega, LD Otero, C Otero 2019 IEEE international systems conference (SysCon), 1-5, 2019 | 24 | 2019 |
A fuzzy logic-based information security control assessment for organizations AR Otero, G Tejay, LD Otero, AJ Ruiz-Torres 2012 IEEE Conference on Open Systems, 1-6, 2012 | 21 | 2012 |
A simulation-based fuzzy multi-attribute decision making for prioritizing software requirements A Ejnioui, C Otero, L Otero Proceedings of the 1st Annual conference on Research in information …, 2012 | 21 | 2012 |
Prioritisation of software requirements using grey relational analysis A Ejnioui, CE Otero, LD Otero International Journal of Computer Applications in Technology 47 (2-3), 100-109, 2013 | 20 | 2013 |
Scheduling with multiple tasks per job–the case of quality control laboratories in the pharmaceutical industry AJ Ruiz-Torres, JH Ablanedo-Rosas, LD Otero International journal of production research 50 (3), 691-705, 2012 | 16 | 2012 |
A multi-criteria decision making approach for resource allocation in software engineering CE Otero, LD Otero, I Weissberger, A Qureshi 2010 12th International Conference on Computer Modelling and Simulation, 137-141, 2010 | 16 | 2010 |
Multi-criteria decision model for selection of nuclear power plant type L Kiser, LD Otero Progress in nuclear energy 159, 104647, 2023 | 15 | 2023 |
Fuzzy inference system framework to prioritize the deployment of resources in low visibility traffic conditions LC Ortega, LD Otero, C Otero Ieee Access 7, 174368-174379, 2019 | 12 | 2019 |