Sledovat
Isa Nakhai Kamalabadi
Isa Nakhai Kamalabadi
Professor of Industrial Engineering, University of Kurdistan, Iran
E-mailová adresa ověřena na: uok.ac.ir
Název
Citace
Citace
Rok
Joint pricing and inventory control for non-instantaneous deteriorating items with partial backlogging and time and price dependent demand
R Maihami, IN Kamalabadi
International Journal of Production Economics 136 (1), 116-122, 2012
3442012
Location-routing problem in multimodal transportation network with time windows and fuzzy demands: Presenting a two-part genetic algorithm
S Fazayeli, A Eydi, IN Kamalabadi
Computers & Industrial Engineering 119, 233-246, 2018
1812018
Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging
R Maihami, I Nakhai Kamalabadi
Mathematical and Computer Modelling 55 (5), 1722-1733, 2012
1602012
A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
SH Zegordi, I Nakhai Kamalabadi, MA Nia
Computers & Industrial Engineering 58 (3), 373-381, 2010
1572010
Minimizing cycle time in a blocking flowshop
I Nakhai Kamalabadi, NG Hall, C Sriskandarajah
Operations Research 48 (1), 177-180, 2000
1312000
Personalized recommendation of learning material using sequential pattern mining and attribute based collaborative filtering
M Salehi, I Nakhai Kamalabadi, MBG Ghoushchi
Education and Information Technologies, 1-23, 2012
1192012
An efficient population-based simulated annealing algorithm for the multi-product multi-retailer perishable inventory routing problem
H Shaabani, IN Kamalabadi
Computers & Industrial Engineering 99, 189-201, 2016
1152016
Hybrid recommendation approach for learning material based on sequential pattern of the accessed material and the learner’s preference tree
M Salehi, IN Kamalabadi
Knowledge-Based Systems 48, 57-69, 2013
912013
An effective recommendation framework for personal learning environments using a learner preference tree and a GA
M Salehi, IN Kamalabadi, MBG Ghoushchi
IEEE Transactions on learning technologies 6 (4), 350-363, 2013
732013
Simultaneous coordination of order quantity and reorder point in a two-stage supply chain
SK Chaharsooghi, J Heydari, IN Kamalabadi
Computers & Operations Research 38 (12), 1667-1677, 2011
672011
A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services
H Mokhtari, A Mozdgir, I Nakhai Kamalabadi
International Journal of Production Research 50 (20), 5906-5925, 2012
562012
A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resources
H Mokhtari, I Nakhai Kamalabadi, A Cheraghalikhani
International Journal of Production Research 49 (19), 5851-5875, 2011
552011
Research on computational intelligence algorithms with adaptive learning approach for scheduling problems with batch processing machines
A Noroozi, H Mokhtari, I Nakhai Kamalabadi
Neurocomputing 101, 190-203, 2013
502013
Scheduling with an outsourcing option on both manufacturer and subcontractors
H Mokhtari, I Nakhai Kamalabadi
Computers & Operations Research 40 (5), 1234-1242, 2013
492013
Production scheduling with outsourcing scenarios: a mixed integer programming and efficient solution procedure
H Mokhtari, I Nakhai Kamalabadi, MR Amin-Naseri
International Journal of Production Research 50 (19), 5372-5395, 2012
482012
Inventory control with deteriorating items: A state-of-the-art literature review
N Khanlarzade, B Yegane, I Nakhai Kamalabadi, H Farughi
International Journal of Industrial Engineering Computations 5 (2), 179-198, 2014
462014
A robust scheduling of projects with time, cost, and quality considerations
A Salmasnia, H Mokhtari, I Nakhai Kamlabadi
The International Journal of Advanced Manufacturing Technology 60 (5-8), 631-642, 2012
412012
A model for distribution centers location-routing problem on a multimodal transportation network with a meta-heuristic solving approach
S Fazayeli, A Eydi, IN Kamalabadi
Journal of Industrial Engineering International 14, 327-342, 2018
342018
Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firm
SK Chaharsooghi, M Honarvar, M Modarres, I Nakhai Kamalabadi
Computers & Industrial Engineering 61 (4), 1086-1097, 2011
282011
Production capacity planning and scheduling in a no-wait environment with controllable processing times: An integrated modeling approach
H Mokhtari, I Nakhai Kamalabadi, SH Zegordi
Expert Systems with Applications 38 (10), 12630-12642, 2011
282011
Systém momentálně nemůže danou operaci provést. Zkuste to znovu později.
Články 1–20