Sequencing of jobs in some production system J Grabowski, J Pempera European journal of operational research 125 (3), 535-550, 2000 | 300 | 2000 |
Some local search algorithms for no-wait flow-shop problem with makespan criterion J Grabowski, J Pempera Computers & Operations Research 32 (8), 2197-2212, 2005 | 241 | 2005 |
The permutation flow shop problem with blocking. A tabu search approach J Grabowski, J Pempera Omega 35 (3), 302-311, 2007 | 198 | 2007 |
New block properties for the permutation flow shop problem with application in tabu search J Grabowski, J Pempera Journal of the Operational Research Society 52 (2), 210-220, 2001 | 107 | 2001 |
Parallel tabu search algorithm for the hybrid flow shop problem W Bożejko, J Pempera, C Smutnicki Computers & Industrial Engineering 65 (3), 466-474, 2013 | 80 | 2013 |
Parallel tabu search for the cyclic job shop scheduling problem W Bożejko, A Gnatowski, J Pempera, M Wodecki Computers & Industrial Engineering 113, 512-524, 2017 | 70 | 2017 |
Parallel simulated annealing for the job shop scheduling problem W Bożejko, J Pempera, C Smutnicki Computational Science–ICCS 2009: 9th International Conference Baton Rouge …, 2009 | 38 | 2009 |
Open shop cyclic scheduling J Pempera, C Smutnicki European Journal of Operational Research 269 (2), 773-781, 2018 | 36 | 2018 |
Optimizing bicriteria flow shop scheduling problem by simulated annealing algorithm P Jarosław, S Czesław, Ż Dominik Procedia Computer Science 18, 936-945, 2013 | 34 | 2013 |
Scheduling and routing algorithms for rail freight transportation W Bożejko, R Grymin, J Pempera Procedia Engineering 178, 206-212, 2017 | 22 | 2017 |
A new approach for multi-criteria scheduling C Smutnicki, J Pempera, J Rudy, D Żelazny Computers & Industrial Engineering 90, 212-220, 2015 | 20 | 2015 |
Parallel simulated annealing algorithm for cyclic flexible job shop scheduling problem W Bożejko, J Pempera, M Wodecki Artificial Intelligence and Soft Computing: 14th International Conference …, 2015 | 17 | 2015 |
A fine-grained parallel algorithm for the cyclic flexible job shop problem W Bożejko, J Pempera, M Wodecki Archives of Control Sciences 27 (2), 2017 | 16 | 2017 |
Cyclic flow-shop scheduling with no-wait constraints and missing operations C Smutnicki, J Pempera, G Bocewicz, Z Banaszak European Journal of Operational Research 302 (1), 39-49, 2022 | 15 | 2022 |
Cyclic hybrid flow-shop scheduling problem with machine setups W Bożejko, Ł Gniewkowski, J Pempera, M Wodecki Procedia Computer Science 29, 2127-2136, 2014 | 12 | 2014 |
Optimal solving of a binary knapsack problem on a D-Wave quantum machine and its implementation in production systems W Bożejko, A Burduk, J Pempera, M Uchroński, M Wodecki Annals of Operations Research, 1-16, 2024 | 9 | 2024 |
Distributed quantum annealing on D-wave for the single machine total weighted tardiness scheduling problem W Bożejko, J Pempera, M Uchroński, M Wodecki International Conference on Computational Science, 171-178, 2022 | 9 | 2022 |
Scheduling in production of concrete wares J Grabowski, J Pempera, C Smutnicki Operations Research Proceedings 1996: Selected Papers of the Symposium on …, 1997 | 9 | 1997 |
Minimal cycle time determination and golf neighborhood generation for the cyclic flexible job shop problem W Bożejko, J Pempera, M Wodecki Bulletin of the Polish Academy of Sciences. Technical Sciences 66 (3), 2018 | 8 | 2018 |
Parallel single-thread strategies in scheduling W Bożejko, J Pempera, A Smutnicki International Conference on Artificial Intelligence and Soft Computing, 995-1006, 2008 | 8 | 2008 |