Følg
Gursel Suer
Gursel Suer
Professor of Industrial and Systems Engineering, Ohio University
Verificeret mail på ohio.edu
Titel
Citeret af
Citeret af
År
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
D Castro-Lacouture, GA Süer, J Gonzalez-Joaqui, JK Yates
Journal of Construction Engineering and Management 135 (10), 1096-1104, 2009
1192009
Designing parallel assembly lines
GA Süer
Computers & industrial engineering 35 (3-4), 467-470, 1998
1021998
Optimal operator assignment and cell loading in labor-intensive manufacturing cells
GA Süer
Computers & industrial engineering 31 (1-2), 155-158, 1996
1021996
Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics
H Mosadegh, SMTF Ghomi, GA Süer
European Journal of Operational Research 282 (2), 530-544, 2020
882020
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
GA Süer, RR Tummaluri
International Journal of Production Research 46 (2), 469-493, 2008
882008
Design of dedicated, shared and remainder cells in a probabilistic demand environment
GA Süer, J Huang, S Maddisetty
International journal of production research 48 (19), 5613-5646, 2010
872010
Stochastic skill-based manpower allocation in a cellular manufacturing system
G Egilmez, B Erenay, GA Süer
Journal of Manufacturing Systems 33 (4), 578-588, 2014
862014
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
J Huang, GA Süer
Computers & Industrial Engineering 86, 29-42, 2015
802015
Optimal operator assignment and cell loading when lot-splitting is allowed
GA Süer, IS Bera
Computers & Industrial Engineering 35 (3-4), 431-434, 1998
791998
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
GA Süer, C Dagli
Computers & Industrial Engineering 48 (3), 643-655, 2005
742005
Stochastic cellular manufacturing system design subject to maximum acceptable risk level
G Egilmez, GA Süer, J Huang
Computers & Industrial Engineering 63 (4), 842-854, 2012
732012
Effects of Different Fuzzy Operators on Fuzzy Bi-objective Cell Loading Problem in Labor Intensive Manufacturing Cells
GA Suer, F Arikan, C Babayigit
Proceedings of the 35th International Conference on Computers and Industrial …, 2005
71*2005
Evaluation of manufacturing cell loading rules for independent cells
GA Suer, M Saiz, W Gonzalez
International Journal of Production Research 37 (15), 3445-3468, 1999
621999
A hybrid method of 2-TSP and novel learning-based GA for job sequencing and tool switching problem
E Ahmadi, B Goldengorin, GA Süer, H Mosadegh
Applied Soft Computing 65, 214-229, 2018
592018
Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem
X Hao, M Gen, L Lin, GA Suer
Journal of intelligent Manufacturing 28, 833-845, 2017
592017
Minimizing the number of tardy jobs in identical machine scheduling
GA Süer, E Báez, Z Czajkiewicz
Computers & Industrial Engineering 25 (1-4), 243-246, 1993
571993
Models for cell loading and product sequencing in labor-intensive cells
GA Süer, J Cosner, A Patten
Computers & Industrial Engineering 56 (1), 97-105, 2009
512009
Intelligent inventory management approaches for perishable pharmaceutical products in a healthcare supply chain
E Ahmadi, H Mosadegh, R Maihami, I Ghalehkhondabi, M Sun, GA Süer
Computers & Operations Research 147, 105968, 2022
502022
Manufacturing cell loading rules and algorithms for connected cells
GA Süer, M Saiz, C Dagli, W Gonzalez
Manufacturing Research and Technology 24, 97-127, 1995
471995
Comparison of layered cellular manufacturing system design approaches
B Erenay, GA Suer, J Huang, S Maddisetty
Computers & Industrial Engineering 85, 346-358, 2015
432015
Systemet kan ikke foretage handlingen nu. Prøv igen senere.
Artikler 1–20