Optimal resource leveling using non-serial dyanamic programming M Bandelloni, M Tucci, R Rinaldi European Journal of Operational Research 78 (2), 162-177, 1994 | 188 | 1994 |
Layout design for a low capacity manufacturing line: a case study F De Carlo, MA Arleo, O Borgia, M Tucci International Journal of Engineering Business Management 5, 35, 2013 | 64 | 2013 |
Using simulation for supply chain analysis: reviewing and proposing distributed simulation frameworks R Bandinelli, M Rapaccini, M Tucci, F Visintin Production Planning & Control 17 (2), 167-175, 2006 | 41 | 2006 |
Bayesian regression based condition monitoring approach for effective reliability prediction of random processes in autonomous energy supply operation A BahooToroody, F De Carlo, N Paltrinieri, M Tucci, P Van Gelder Reliability Engineering & System Safety 201, 106966, 2020 | 29 | 2020 |
Effectiveness of maintenance approaches for High Reliability Organizations S Andriulo, MA Arleo, F de Carlo, MG Gnoni, M Tucci IFAC-PapersOnLine 48 (3), 466-471, 2015 | 29 | 2015 |
OEE evaluation of a paced assembly line through different calculation and simulation methods: a case study in the pharmaceutical environment F De Carlo, MA Arleo, M Tucci International Journal of Engineering Business Management 6 (Godište 2014), 6-27, 2014 | 29 | 2014 |
Bucket brigades to increase productivity in a luxury assembly line F De Carlo, O Borgia, M Tucci International Journal of Engineering Business Management 5, 28, 2013 | 29 | 2013 |
Towards forklift safety in a warehouse: An approach based on the automatic analysis of resource flows A Cantini, F De Carlo, M Tucci Sustainability 12 (21), 8949, 2020 | 26 | 2020 |
Accelerated degradation tests for reliability estimation of a new product: a case study for washing machines F De Carlo, O Borgia, M Tucci Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2014 | 25 | 2014 |
Risk-based inspections enhanced with Bayesian networks F De Carlo, O Borgia, M Tucci Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2011 | 25 | 2011 |
Accelerated life tests as an integrated methodology for product design, qualification and production control: a case study in household appliances M Tucci, F De Carlo, O Borgia, N Fanciullacci Production & Manufacturing Research 2 (1), 112-127, 2014 | 21 | 2014 |
From theory to application: tabu search in textile production scheduling M Tucci, R Rinaldi Production Planning & Control 10 (4), 365-374, 1999 | 18 | 1999 |
Accelerated life tests for new product qualification: a case study in the household appliance O Borgia, F De Carlo, N Fanciullacci, M Tucci IFAC Proceedings Volumes 46 (7), 269-274, 2013 | 14 | 2013 |
The use of dynamic object oriented Bayesian networks in reliability assessment: a case study O Borgia, F De Carlo, M Peccianti, M Tucci Recent advances in maintenance and infrastructure management. London …, 2009 | 14 | 2009 |
Methods and Tools for the Rliability Engineering: a plant maintenance perspective M Tucci, G Bettini ITA, 2006 | 13 | 2006 |
Failure diagnosis of a compressor subjected to surge events: a data-driven framework L Leoni, F De Carlo, MM Abaei, A BahooToroody, M Tucci Reliability Engineering and System Safety 233, 109107, 2023 | 12 | 2023 |
Application of the lean layout planning system in a leather bags manufacturing plant and proposal of an approach to engage the company’s staff in the research of the layout … A Cantini, F De Carlo, M Tucci Proceedings of the XXV Summer School Francesco Turco, 1-8, 2020 | 12 | 2020 |
Conception of a prototype to validate a maintenance expert system F De Carlo, M Tucci, O Borgia International Journal of engineering and Technology 5 (5), 4273-4282, 2013 | 12 | 2013 |
Different approaches in making simulation languages compliant with HLA specification M Tucci, R Revetria USA, 2001 | 11 | 2001 |
The role of digital twins in the fulfilment logistics chain C Piancastelli, M Tucci IFAC-PapersOnLine 53 (2), 10574-10578, 2020 | 9 | 2020 |