Følg
Maristela Oliveira  Santos
Maristela Oliveira Santos
Andre navneMaristela Oliveira dos Santos, Maristela Santos, Maristela O. Santos
Instituto de CIências Matemáticas e de Computação
Verificeret mail på icmc.usp.br - Startside
Titel
Citeret af
Citeret af
År
Integrated pulp and paper mill planning and scheduling
MO Santos, B Almada-Lobo
Computers & Industrial Engineering 63 (1), 1-12, 2012
1042012
An optimization approach for the lot sizing and scheduling problem in the brewery industry
TA Baldo, MO Santos, B Almada-Lobo, R Morabito
Computers & Industrial Engineering 72, 58-71, 2014
932014
Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs
PB Macedo, D Alem, M Santos, ML Junior, A Moreno
The International Journal of Advanced Manufacturing Technology 82, 1241-1257, 2016
662016
A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry
G Figueira, MO Santos, B Almada-Lobo
Computers & Operations Research 40 (7), 1804-1818, 2013
592013
An integrated approach for production lot sizing and raw material purchasing
AL Cunha, MO Santos, R Morabito, A Barbosa-Póvoa
European Journal of Operational Research 269 (3), 923-938, 2018
512018
Parallel local search algorithms for high school timetabling problems
L Saviniec, MO Santos, AM Costa
European Journal of Operational Research 265 (1), 81-98, 2018
452018
Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines
M Furlan, B Almada-Lobo, M Santos, R Morabito
Computers & Operations Research 59, 33-50, 2015
352015
Models for the two-dimensional level strip packing problem–a review and a computational evaluation
VMR Bezerra, AAS Leao, JF Oliveira, MO Santos
Journal of the Operational Research Society 71 (4), 606-627, 2020
302020
BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem
MM Furlan, MO Santos
Journal of Intelligent Manufacturing 28, 929-944, 2017
292017
Pattern-based models and a cooperative parallel metaheuristic for high school timetabling problems
L Saviniec, MO Santos, AM Costa, LMR dos Santos
European Journal of Operational Research 280 (3), 1064-1081, 2020
262020
MIP approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products
WAO Soler, MO Santos, K Akartunalı
Journal of the Operational Research Society 72 (8), 1691-1706, 2021
252021
Logística de distribuição de água em redes urbanas: racionalização energética
F Toledo, MO Santos, MN Arenales, P Seleghim Júnior
Pesquisa Operacional 28, 75-91, 2008
232008
Meta-heuristics for the one-dimensional cutting stock problem with usable leftover
SV Ravelo, CN Meneses, MO Santos
Journal of Heuristics 26, 585-618, 2020
222020
The constrained compartmentalized knapsack problem: mathematical models and solution methods
AAS Leão, MO Santos, R Hoto, MN Arenales
European journal of operational research 212 (3), 455-463, 2011
212011
Infeasibility handling in genetic algorithm using nested domains for production planning
MO Santos, S Massago, B Almada-Lobo
Computers & operations research 37 (6), 1113-1122, 2010
202010
An adaptive hybrid metaheuristic for permutation flowshop scheduling
J Moccellin, M Santos
Control and Cybernetics 29 (3), 761-771, 2000
202000
Safety-Stock: Predicting the demand for supplies in Brazilian hospitals during the COVID-19 pandemic
OAG Junior, DC Nascimento, CM Russo, MJ Henriques, CP Tomazella, ...
Knowledge-Based Systems 247, 108753, 2022
142022
Otimização dos custos de energia elétrica na programação da captação, armazenamento e distribuição de água
EM Soler, FMB Toledo, MO Santos, MN Arenales
Production 26, 385-401, 2015
142015
A mixed integer programming model and solution method for the operation of an integrated water supply system
MO Santos, EM Soler, MM Furlan, JCM Vieira
International Transactions in Operational Research 29 (2), 929-958, 2022
122022
Asynchronous teams for joint lot-sizing and scheduling problem in flow shops
MAFB Filho, MO Santos, CN Meneses
International journal of production research 50 (20), 5809-5822, 2012
112012
Systemet kan ikke foretage handlingen nu. Prøv igen senere.
Artikler 1–20