Folgen
Abdellah EL BARKANY
Abdellah EL BARKANY
Prof. of Mechanical Engineering
Bestätigte E-Mail-Adresse bei usmba.ac.ma
Titel
Zitiert von
Zitiert von
Jahr
Energy management in the smart grid: State-of-the-art and future trends
M Meliani, AE Barkany, IE Abbassi, AM Darcherif, M Mahmoudi
International Journal of Engineering Business Management 13, 18479790211032920, 2021
1372021
Steel wire ropes failure analysis: Experimental study
H Mouradi, A El Barkany, A El Biyaali
Engineering Failure Analysis 91, 234-242, 2018
772018
Preventive maintenance optimization in healthcare domain: Status of research and perspective
H Mahfoud, A El Barkany, A El Biyaali
Journal of Quality and Reliability Engineering 2016 (1), 5314312, 2016
522016
Bio-composites and bio-hybrid composites reinforced with natural fibers: Review
AEB Assia CHICHANE, Radouane BOUJMAL
Materials Today: Proceedings 72 (7), 3471-3479, 2023
50*2023
Inventory models for spare parts management: a review
O Bounou, A El Barkany, A El Biyaali
International Journal of Engineering Research in Africa 28, 182-198, 2017
422017
Sales and operations planning (S&OP) concepts and models under constraints: Literature review
L Nabil, A El Barkany, A El Khalfi
International Journal of Engineering Research in Africa 34, 171-188, 2018
372018
Investigation on the main degradation mechanisms of steel wire ropes
H Mouradi, A El Barkany, A El Biyaali
J Eng Appl Sci 100 (6), 1206-1217, 2016
362016
A hybrid decision-making model for maintenance prioritization in health care systems
H Mahfoud, A El Barkany, A El Biyaali
Am J Appl Sci 13 (4), 439-50, 2016
322016
Medical maintenance performance monitoring: a roadmap to efficient improvement
H Mahfoud, AE Barkany, AE Biyaali
International Journal of Productivity and Quality Management 22 (1), 117-140, 2017
302017
Optimization techniques for energy efficiency in machining processes—a review
FZE Abdelaoui, A Jabri, AE Barkany
The International Journal of Advanced Manufacturing Technology 125 (7), 2967 …, 2023
282023
Multi-objective optimization using genetic algorithms of multi-pass turning process
A Jabri, A El Barkany, A El Khalfi
Engineering 5 (07), 601, 2013
282013
Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two‐Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption
S Assia, I El Abbassi, A El Barkany, M Darcherif, A El Biyaali
Advances in Operations Research 2020 (1), 9732563, 2020
272020
Dependability-based maintenance optimization in healthcare domain
H Mahfoud, EB Abdellah, A El Biyaali
Journal of Quality in Maintenance Engineering 24 (2), 200-223, 2018
272018
Multipass turning operation process optimization using hybrid genetic simulated annealing algorithm
A Jabri, A El Barkany, A El Khalfi
Modelling and Simulation in Engineering 2017 (1), 1940635, 2017
232017
Joint scheduling of jobs and variable maintenance activities in the flowshop sequencing problems: review, classification and opportunities
A Sadiqi, I El Abbassi, A El Barkany, A El Biyaali
International Journal of Engineering Research in Africa 39, 170-190, 2018
222018
The integration of maintenance plans and production scheduling taking account of outsourcing: a literature review
S Aarab, AE Barkany, AE Khalfi
International Journal of Productivity and Quality Management 21 (1), 1-22, 2017
222017
Cost of quality in healthcare: a case study in a clinical laboratory
M Zahar, AE Barkany, AE Biyaali
International Journal of Productivity and Quality Management 17 (4), 536-548, 2016
212016
Optimization by the reliability of the damage by tiredness of a wire rope of lifting
A Meksem, M El Ghorba, A Benali, A El Barkany
Applied mechanics and materials 61, 15-24, 2011
212011
Modeling and optimization a production/maintenance integrated planning
G Ettaye, A El Barkany, A El Khalfi
International journal of engineering research in Africa 28, 169-181, 2017
172017
Planning and scheduling problems of production systems: review, classification and opportunities
ZIM Hassani, AE Barkany, AM Darcherif, A Jabri, IE Abbassi
International Journal of Productivity and Quality Management 28 (3), 372-402, 2019
162019
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20