Analysis of effectiveness measures of construction project success in Malaysia R Takim, H Adnan Asian Social Science 4 (7), 74-91, 2008 | 241 | 2008 |
Ethical issues in the construction industry: Contractor's perspective H Adnan, N Hashim, N Mohd, N Ahmad Procedia-social and behavioral sciences 35, 719-727, 2012 | 143 | 2012 |
A study of construction claim management problems in Malaysia NA Bakhary, H Adnan, A Ibrahim Procedia economics and finance 23, 63-70, 2015 | 141 | 2015 |
Obstacles in implementing green building projects in Malaysia MR Bin Esa, MA Marhani, R Yaman, A Noor, HA Rashid Australian Journal of Basic and Applied Sciences 5 (12), 1806-1812, 2011 | 122 | 2011 |
Facility management challenges and opportunities in the Malaysian property sector SAH bin Syed Mustapa, H Adnan, K Jusoff Journal of Sustainable Development 1 (2), P79, 2008 | 96 | 2008 |
Clients' perspectives of risk management practice in Malaysian construction industry NM Yusuwan, H Adnan, AF Omar, J Kamaruzaman J. Pol. & L. 1, 121, 2008 | 89 | 2008 |
Application of Delphi method on critical success factors in joint venture projects in the Malaysian construction industry H Adnan, R Morledge 1st Scottish Conference for Postgraduate Researchers of the Built and …, 2003 | 70 | 2003 |
Management of safety for quality construction HN Husin, H Adnan, K Jusoff Journal of Sustainable Development 1 (3), 41-47, 2008 | 63 | 2008 |
Conflict prevention in partnering projects H Adnan, SM Shamsuddin, A Supardi, N Ahmad Procedia-Social and Behavioral Sciences 35, 772-781, 2012 | 60 | 2012 |
An assessment of risk management in joint venture projects (JV) in Malaysia H Adnan Asian Social Science 4 (6), 99-106, 2008 | 60 | 2008 |
Issues associated with extension of time (EoT) claim in Malaysian construction industry NM Yusuwan, H Adnan Procedia Technology 9, 740-749, 2013 | 58 | 2013 |
Dependency of foreign workers in Malaysian construction industry MA Marhani, H Adnan, HE Baharuddin, MR Esa, AA Hassan Built Environment Journal (BEJ) 9 (1), 39-50, 2012 | 56 | 2012 |
Joint venture projects in Malaysian construction industry: factors critical to success H Adnan PQDT-Global, 2004 | 47 | 2004 |
The Malaysian construction industry’s risk management in design and build H Adnan, K Jusoff, MK Salim Modern Applied Science 2 (5), 27-33, 2008 | 46 | 2008 |
Success factors of design and build projects in public universities H Adnan, F Bachik, A Supardi, MA Marhani Procedia-Social and Behavioral Sciences 35, 170-179, 2012 | 34 | 2012 |
Maintenance Management for Public Infrastructure H Adnan, Z Fazry, M Fauzi, I Rahmat, A Supardi APRN Journal of Engineering and Applied Sciences 7 (11), 1514-1522, 2012 | 32 | 2012 |
Factors affecting housing prices in Malaysia: Analysis of the supply side AL Olanrewaju, XY Lim, SY Tan, JE Lee, H Adnan Planning Malaysia 16, 2018 | 31 | 2018 |
Building Information Modelling (BIM) adoption by quantity surveyors: a preliminary survey from Malaysia NAA Ismail, H Adnan, NA Bakhary IOP Conference Series: Earth and Environmental Science 267 (5), 052041, 2019 | 30 | 2019 |
Conflict, complexity, and uncertainty in building refurbishment projects A Noori, M Saruwono, H Adnan, I Rahmat InCIEC 2015: Proceedings of the International Civil and Infrastructure …, 2016 | 30 | 2016 |
Critical success factors for contractors H Adnan, NM Yusuwan, F Yusuf, F Bachik International Journal of Engineering and Technical Research 2 (2), 107-113, 2014 | 30 | 2014 |