Folgen
Sepehr Alizadehsalehi
Sepehr Alizadehsalehi
Sonstige NamenSepehr Alizadeh Salehi
Adjunct Professor, Northwestern University
Bestätigte E-Mail-Adresse bei u.northwestern.edu - Startseite
Titel
Zitiert von
Zitiert von
Jahr
From BIM to extended reality in AEC industry
S Alizadehsalehi, A Hadavi, JC Huang
Automation in construction 116, 103254, 2020
5082020
Digital twin-based progress monitoring management model through reality capture to extended reality technologies (DRX)
S Alizadehsalehi, I Yitmen
Smart and Sustainable Built Environment 12 (1), 200-236, 2023
197*2023
The effectiveness of an integrated BIM/UAV model in managing safety on construction sites
S Alizadehsalehi, I Yitmen, T Celik, D Arditi
International journal of occupational safety and ergonomics 26 (4), 829-844, 2020
1632020
An adapted model of cognitive digital twins for building lifecycle management
I Yitmen, S Alizadehsalehi, İ Akıner, ME Akıner
Applied Sciences 11 (9), 4276, 2021
1492021
An investigation for integration of deep learning and digital twins towards Construction 4.0
M Kor, I Yitmen, S Alizadehsalehi
Smart and Sustainable Built Environment 12 (3), 461-487, 2023
1452023
A concept for automated construction progress monitoring: Technologies adoption for benchmarking project performance control
S Alizadehsalehi, I Yitmen
Arabian Journal for Science and Engineering 44, 4993-5008, 2019
1092019
Assessment of AEC students’ performance using BIM-into-VR
S Alizadehsalehi, A Hadavi, JC Huang
Applied Sciences 11 (7), 3225, 2021
1052021
Virtual reality for design and construction education environment
S Alizadehsalehi, A Hadavi, JC Huang
AEI 2019, 193-203, 2019
1052019
The impact of field data capturing technologies on automated construction project progress monitoring
S Alizadehsalehi, I Yitmen
Procedia engineering 161, 97-103, 2016
912016
Modeling and analysis of the impact of BIM-based field data capturing technologies on automated construction progress monitoring
S Alizadeh Salehi, İ Yitmen
International Journal of Civil Engineering 16, 1669-1685, 2018
882018
BIM/MR-Lean construction project delivery management system
S Alizadehsalehi, A Hadavi, JC Huang
2019 IEEE Technology & Engineering Management Conference (TEMSCON), 1-6, 2019
652019
Adoption of virtual reality (VR) for site layout optimization of construction projects
AA Muhammad, İ Yıtmen, S Alızadehsalehı, T Celık
Teknik Dergi 31 (2), 9833-9850, 2019
622019
Investigating the Causal Relationships among Enablers of the Construction 5.0 Paradigm: Integration of Operator 5.0 and Society 5.0 with Human-Centricity, Sustainability, and …
I Yitmen, A Almusaed, S Alizadehsalehi
Sustainability 15 (11), 9105, 2023
372023
UAS-BIM based real-time hazard identification and safety monitoring of construction projects
S Alizadehsalehi, M Asnafi, I Yitmen, T Celik
9th Nordic Conference on Construction Economics and Organization 13-14 June …, 2017
312017
Towards a digital twin-based smart built environment
I Yitmen, S Alizadehsalehi
BIM-enabled cognitive computing for smart built environment, 21-44, 2021
28*2021
From BIM to Metaverse for AEC Industry
A Hadavi, S Alizadehsalehi
Automation in Construction, 2024
252024
Integration of building information modeling (BIM) and laser scanning in construction industry
S Alizadehsalehi, O Koseoglu, M Celikag
AEI 2015, 163-174, 2015
212015
Synergies of lean, BIM, and extended reality (LBX) for project delivery management
S Alizadehsalehi, A Hadavi
Sustainability 15 (6), 4969, 2023
132023
BIM-enabled Cognitive Computing for Smart Built Environment
I Yitmen, S Alizadehsalehi
CRC Press, 2021
92021
Integration of Digital Twins, Blockchain and AI in Metaverse: Enabling Technologies and Challenges
I Yitmen, S Alizadehsalehi, ME Akiner, I Akiner
Cognitive Digital Twins for Smart Lifecycle Management of Built Environment …, 2023
7*2023
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20