Folgen
Yaghoub Alipouri (ORCID: 0000-0002-4934-5435)
Yaghoub Alipouri (ORCID: 0000-0002-4934-5435)
Sonstige Namenیعقوب علیپوری,Yagub Alipouri, Y. Alipouri, Alipouri Y.
Assistant Professor, K. N. Toosi University of Technology (ROR 0433abe34), IRAN
Bestätigte E-Mail-Adresse bei kntu.ac.ir - Startseite
Titel
Zitiert von
Zitiert von
Jahr
A type-2 fuzzy set model for contractor prequalification
MR Afshar, Y Alipouri, MH Sebt, WT Chan
Automation in Construction 84, 356-366, 2017
672017
Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem
MH Sebt, MR Afshar, Y Alipouri
Engineering Optimization 49 (3), 513-530, 2017
512017
A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
Y Alipouri, MH Sebt, A Ardeshir, MHF Zarandi
Operational Research 20, 197-217, 2020
382020
Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach
Y Alipouri, MH Sebt, A Ardeshir, WT Chan
Journal of the Operational Research Society 70 (3), 403-419, 2019
272019
A mixed-integer linear programming for scheduling a multi-product pipeline with dual-purpose terminals
H Mostafaei, Y Alipouri, J Shokri
Computational and Applied Mathematics 34, 979-1007, 2015
272015
Smart Personal Protective Equipment (PPE) for construction safety: A literature review
S Rasouli, Y Alipouri, S Chamanzad
Safety science 170, 106368, 2024
262024
Solving resource-constrained project scheduling problem with evolutionary programming
MH Sebt, Y Alipouri, Y Alipouri
Journal of the Operational Research Society 64 (9), 1327-1335, 2013
242013
An Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
MH Sebt, MR Afshar, Y Alipouri
International Journal of Supply and Operations Management 2 (3), 905-924, 2015
232015
A mathematical model for scheduling of real-world tree-structured multi-product pipeline system
H Mostafaei, Y Alipouri, M Zadahmad
Mathematical Methods of Operations Research 81 (1), 53-81, 2015
222015
Momentum coefficient for promoting accuracy and convergence speed of evolutionary programming
Y Alipouri, J Poshtan, Y Alipouri, MR Alipour
Applied Soft Computing 12 (6), 1765-1786, 2012
132012
A modification to classical evolutionary programming by shifting strategy parameters
Y Alipouri, J Poshtan, Y Alipouri
Applied intelligence 38, 175-192, 2013
112013
Identification of the most important parameters affecting the safety performance of mega-projects in Iran’s construction industry using fuzzy analytic hierarchy process
A ARDESHIR, Q Bagheri, AH Khalilianpoor, Y ALIPOURI
IRAN OCCUPATIONAL HEALTH JOURNAL 13 (2), 17-28, 2016
82016
A survey of factors influencing safety performance of workers in construction sites using Fuzzy Analytic Hierarchy Process (case study: Khuzestan province).
A Ardeshir, Y Alipouri, P Besmel
82014
Identification of strategies for the improvement of human safety behavior in Iran by considering safety climate and personal experience
Y Alipouri, A Ardeshir, MH Sebt, H Vasheghani
Journal of Iranian Society of Civil Engineering (Asas) 28, 50-59, 2012
72012
A resource flow-based branch-and-bound algorithm to solve fuzzy stochastic resource-constrained project scheduling problem
Y Alipouri
Soft Computing, 2021
52021
Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
MH Sebt, MH Fazel Zarandi, Y Alipouri
International Journal of Civil Engineering 11 (3), 189-198, 2013
42013
Alipouri Ya, Besmel P
A Ardeshir
A Survey of Factors Influencing Safety Performance of workers in …, 2014
22014
Investigating the Effect and Presenting an Appropriate Model of Knowledge Management in Reducing Accidents and Hazards in the Construction Industry
Y Alipouri, MH Javadi
Journal of Safety Promotion and Injury Prevention 9 (2), 2021
12021
A Fuzzy Expert System and Genetic Algorithms to Score the Safety Management Performance in Construction Sites of Iran: Considering Safety Climate and Personal Experience
Y Alipouri, A Ardeshir, MH Sebt, ZMH FAZEL
SHARIF: CIVIL ENINEERING 312 (41), 31-39, 2016
12016
Solving multi-project scheduling problem under resource constraints (RCMPSP): an approach based on building information modeling
MS Moradnia, Y Alipouri
Journal of Structural and Construction Engineering, 2025
2025
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20