Folgen
Qiuchen Lu
Qiuchen Lu
Bestätigte E-Mail-Adresse bei ucl.ac.uk - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Developing a digital twin at building and city levels: Case study of West Cambridge campus
Q Lu, AK Parlikad, P Woodall, G Don Ranasinghe, X Xie, Z Liang, ...
Journal of Management in Engineering 36 (3), 05020004, 2020
5152020
Digital twin-enabled anomaly detection for built asset monitoring in operation and maintenance
Q Lu, X Xie, AK Parlikad, JM Schooling
Automation in Construction 118, 103277, 2020
4042020
From BIM towards digital twin: strategy and future development for smart asset management
Q Lu, X Xie, J Heaton, AK Parlikad, J Schooling
Service Oriented, Holonic and Multi-agent Manufacturing Systems for Industry …, 2020
2232020
Developing a dynamic digital twin at a building level: Using Cambridge campus as case study
V Qiuchen Lu, AK Parlikad, P Woodall, GD Ranasinghe, J Heaton
International Conference on Smart Infrastructure and Construction 2019 …, 2019
1962019
Semi-automatic geometric digital twinning for existing buildings based on images and CAD drawings
Q Lu, L Chen, S Li, M Pitt
Automation in Construction 115, 103183, 2020
1792020
Image-based technologies for constructing as-is building information models for existing buildings
Q Lu, S Lee
Journal of Computing in Civil Engineering 31 (4), 04017005, 2017
1792017
A digital twin of bridges for structural health monitoring
C Ye, L Butler, C Bartek, M Iangurazov, Q Lu, A Gregory, M Girolami, ...
12th International Workshop on Structural Health Monitoring 2019, 2019
1662019
Moving from building information models to digital twins for operation and maintenance
Q Lu, X Xie, AK Parlikad, JM Schooling, E Konstantinou
Proceedings of the Institution of Civil Engineers-Smart Infrastructure and …, 2020
1312020
Activity theory-based analysis of BIM implementation in building O&M and first response
Q Lu, L Chen, S Lee, X Zhao
Automation in Construction 85, 317-332, 2018
1282018
Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance
X Xie, Q Lu, D Rodenas-Herraiz, AK Parlikad, JM Schooling
Engineering, Construction and Architectural Management 27 (8), 1835-1852, 2020
912020
Image-driven fuzzy-based system to construct as-is IFC BIM objects
Q Lu, S Lee, L Chen
Automation in Construction 92, 68-87, 2018
692018
Gemini principles-based digital twin maturity model for asset management
L Chen, X Xie, Q Lu, AK Parlikad, M Pitt, J Yang
Sustainability 13 (15), 8224, 2021
542021
Bayesian Monte Carlo simulation–driven approach for construction schedule risk inference
L Chen, Q Lu, S Li, W He, J Yang
Journal of Management in Engineering 37 (2), 04020115, 2021
492021
Digital twin enabled asset anomaly detection for building facility management
X Xie, Q Lu, AK Parlikad, JM Schooling
IFAC-PapersOnLine 53 (3), 380-385, 2020
482020
AHP-ANP–fuzzy integral integrated network for evaluating performance of innovative business models for sustainable building
X Zhao, L Chen, W Pan, Q Lu
Journal of Construction Engineering and Management 143 (8), 04017054, 2017
472017
Does historical data still count? Exploring the applicability of smart building applications in the post-pandemic period
X Xie, Q Lu, M Herrera, Q Yu, AK Parlikad, JM Schooling
Sustainable Cities and Society 69, 102804, 2021
422021
Rethinking the construction schedule risk of infrastructure projects based on dialectical systems and network theory
L Chen, Q Lu, X Zhao
Journal of Management in Engineering 36 (5), 04020066, 2020
382020
BIM-integrated portfolio-based strategic asset data quality management
Z Fang, Y Liu, Q Lu, M Pitt, S Hanna, Z Tian
Automation in Construction 134, 104070, 2022
332022
Typology of business model innovations for delivering zero carbon buildings
X Zhao, BG Hwang, Q Lu
Journal of cleaner production 196, 1213-1226, 2018
322018
Digital tools for revealing and reducing carbon footprint in infrastructure, building, and city scopes
J Yan, Q Lu, J Tang, L Chen, J Hong, T Broyd
Buildings 12 (8), 1097, 2022
262022
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20