Correlation between construction procurement methods and lean principles N Vilasini, TR Neitzert, JO Rotimi International journal of construction management 11 (4), 65-78, 2011 | 37 | 2011 |
A framework for subcontractor integration in alliance contracts N Vilasini, TR Neitzert, JOB Rotimi, AO Windapo International journal of construction supply chain management 2 (1), 17-33, 2012 | 35 | 2012 |
Developing and evaluating a framework for process improvement in an alliance project: a New Zealand case study N Vilasini, T Neitzert, J Rotimi Construction management and economics 32 (6), 625-640, 2014 | 27 | 2014 |
Lean and BIM implementation barriers in New Zealand construction practice AJ Likita, MB Jelodar, V Vishnupriya, JOB Rotimi, N Vilasini Buildings 12 (10), 1645, 2022 | 26 | 2022 |
Lean methodology to reduce waste in a construction environment N Vilasini, TR Neitzert, JR Gamage 15th Pacific Association of Quantity Surveyors Congress 23, 2011 | 18 | 2011 |
Implementing value stream mapping tool in the construction industry N Vilasini, JR Gamage International Research Conference on Sustainability in Built Environment …, 2010 | 12* | 2010 |
Generating value in alliance contracts through the lean concept N Vilasini PhD. Auckland University of Technology, 2014 | 8 | 2014 |
Proactive post-occupancy evaluation E Rasheed, J Rotimi, N Vilasini, A Weerasinghe Build 185, 68-69, 2021 | 4 | 2021 |
Improving project performance through worker participation in alliance projects N Vilasini, TR Neitzert twenty-eighth annual conference 2012 September 3 5, 2012 | 4 | 2012 |
Appropriateness of lean production system for the construction industry N Vilashini, TR Neitzert World Construction Conference, 2012 | 3 | 2012 |
Generating value in alliance contracts through the lean concept PP Guruge, N Vilasini Auckland University of Technology, 2014 | 1 | 2014 |
Reorganization of sub-contractor management practices in alliance contracts N Vilasini, T Neitzert, JOB Rotimi, A Windapo Emerald, 2012 | 1 | 2012 |
Resource utilisation and availability analysis as a productivity improvement tool: A case study of a food manufacturing company N Vilasini, UP Kahangamage, JR Gamage | | 2012 |
Appropriateness of production systems for the construction industry N Vilasini, TR Neitzert | | 2012 |