Folgen
Jonghwan Kwon
Jonghwan Kwon
Bestätigte E-Mail-Adresse bei anl.gov
Titel
Zitiert von
Zitiert von
Jahr
The long-term impacts of carbon and variable renewable energy policies on electricity markets
T Levin, J Kwon, A Botterud
Energy Policy 131, 53-71, 2019
872019
Energy storage solutions to decarbonize electricity through enhanced capacity expansion modelling
T Levin, J Bistline, R Sioshansi, WJ Cole, J Kwon, SP Burger, ...
Nature Energy 8 (11), 1199-1208, 2023
692023
Extreme weather and electricity markets: Key lessons from the February 2021 Texas crisis
T Levin, A Botterud, WN Mann, J Kwon, Z Zhou
Joule 6 (1), 1-7, 2022
512022
Resource adequacy in electricity markets with renewable energy
J Kwon, Z Zhou, T Levin, A Botterud
IEEE Transactions on Power Systems 35 (1), 773-781, 2019
512019
Evaluation of aggregated EV flexibility with TSO-DSO coordination
L Wang, J Kwon, N Schulz, Z Zhou
IEEE Transactions on Sustainable Energy 13 (4), 2304-2315, 2022
392022
Revenue prediction for integrated renewable energy and energy storage system using machine learning techniques
Y Lin, B Li, TM Moiser, LM Griffel, MR Mahalik, J Kwon, SMS Alam
Journal of Energy Storage 50, 104123, 2022
282022
Transmission expansion planning model considering conductor thermal dynamics and high temperature low sag conductors
J Kwon, KW Hedman
IET Generation, Transmission & Distribution 9 (15), 2311-2318, 2015
242015
Research priorities and opportunities in United States wholesale electricity markets
Y Sun, T Levin, J Kwon, Q Xu, N Singhal, E Ela, Z Zhou, ...
National Renewable Energy Lab.(NREL), Golden, CO (United States); Argonne …, 2021
182021
A review of technology innovations for pumped storage hydropower
V Koritarov, Q Ploussard, J Kwon, P Balducci
Argonne National Lab.(ANL), Argonne, IL (United States), 2022
162022
Research priorities and opportunities in United States competitive wholesale electricity markets
Y Sun, T Levin, J Kwon, Q Xu, N Singhal, E Ela
Washington, DC, 2021
122021
Charging station planning to maximize extra load hosting capacity in unbalanced distribution system
L Wang, J Kwon, O Verbas, A Rousseau, Z Zhou
2020 IEEE Power & Energy Society General Meeting (PESGM), 1-5, 2020
122020
Optimal market participation of pumped storage hydropower plants considering hydraulic short-circuit operation
J Kwon, T Levin, V Koritarov
2020 52nd North American Power Symposium (NAPS), 1-6, 2021
92021
The impact of market design and clean energy incentives on strategic generation investments and resource adequacy in low-carbon electricity markets
J Kwon, T Levin, Z Zhou, A Botterud, M Mehrtash, BF Hobbs
Renewable Energy Focus 47, 100495, 2023
82023
A stochastic multi-agent resource planning model: The impact of capacity remuneration mechanisms
J Kwon, Z Zhou, T Levin, A Botterud
2018 IEEE International Conference on Probabilistic Methods Applied to Power …, 2018
82018
A Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation
Z Zhou, J Kwon, KM Jhala, V Koritarov
Argonne National Lab.(ANL), Argonne, IL (United States), 2022
62022
Pumped storage hydropower valuation guidebook: A cost-benefit and decision analysis valuation framework
V Koritarov, P Balducci, T Levin, M Christian, J Kwon, C Milostan, ...
Argonne National Lab.(ANL), Argonne, IL (United States); Idaho National Lab …, 2021
62021
Analysis of the impact of demand response by dynamic pricing for residential customers
J Kwon, S Han, S Park, D Choi, BH Kim
KIEE Summer Conference, 548-549, 2010
6*2010
Rationale for adding batteries to hydropower plants and tradeoffs in hybrid system operation: A review
V Durvasulu, WH Balliet, CJ Lopez, Y Lin, B Li, SMS Alam, MR Mahalik, ...
Renewable and Sustainable Energy Reviews 202, 114673, 2024
42024
Generator contingency modeling in electric energy markets: Derivation of prices via duality theory
NG Singhal, J Kwon, KW Hedman
arXiv preprint arXiv:1910.02323, 2019
42019
A study on REC price forecasting for the RPS
S Hwang, J Kwon, J Ahn, P Woo, BH Kim
KIEE summer conference, 352-354, 2012
4*2012
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20