Folgen
Chunlu Liu
Chunlu Liu
Bestätigte E-Mail-Adresse bei deakin.edu.au - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Applications of multirotor drone technologies in construction management
Y Li, C Liu
International Journal of Construction Management 19 (5), 401-412, 2019
3782019
Critical barriers to BIM implementation in the AEC industry
S Liu, B Xie, L Tivendale, C Liu
Deakin University, 2015
2232015
Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm
C Liu, A Hammad, Y Itoh
Computer‐Aided Civil and Infrastructure Engineering 12 (6), 431-443, 1997
1351997
Housing price diffusion pattern of Australia's state capital cities
ZQ Luo, C Liu, D Picken
International Journal of Strategic Property Management 11 (4), 227-242, 2007
1252007
Maintenance strategy optimization of bridge decks using genetic algorithm
C Liu, A Hammad, Y Itoh
Journal of transportation engineering 123 (2), 91-100, 1997
1241997
Carbon productivity: a case study in the Australian construction industry
X Hu, C Liu
Journal of cleaner production 112, 2354-2362, 2016
1102016
Linkage measures of the construction sector using the hypothetical extraction method
Y Song, C Liu, C Langston
Construction management and Economics 24 (6), 579-589, 2006
1072006
Malmquist indices of total factor productivity changes in the Australian construction industry
Y Li, C Liu
Construction management and economics 28 (9), 933-945, 2010
932010
Unveiling the conceptual development of industrial symbiosis: Bibliometric analysis
H Mallawaarachchi, Y Sandanayake, G Karunasena, C Liu
Journal of Cleaner Production 258, 120618, 2020
822020
CO2 emission linkage analysis in global construction sectors: Alarming trends from 1995 to 2009 and possible repercussions
L Zhang, B Liu, J Du, C Liu, S Wang
Journal of cleaner production 221, 863-877, 2019
782019
Case study of demolition costs of residential buildings
SK Pun, C Liu, C Langston
Construction management and economics 24 (9), 967-976, 2006
782006
Forecasting construction demand: A vector error correction model with dummy variables
H Jiang, C Liu
Construction Management and Economics 29 (9), 969-979, 2011
672011
Prioritising performance indicators for sustainable construction and development of university campuses using an integrated assessment approach
Y Li, Y Gu, C Liu
Journal of cleaner production 202, 959-968, 2018
652018
A pixel-based approach to estimation of solar energy potential on building roofs
Y Li, D Ding, C Liu, C Wang
Energy and Buildings 129, 563-573, 2016
642016
Optimizing the concession period of PPP projects for fair allocation of financial risk
H Jin, S Liu, C Liu, N Udawatta
Engineering, Construction and Architectural Management 26 (10), 2347-2363, 2019
622019
A multi-regional input–output analysis of energy embodied in international trade of construction goods and services
B Liu, D Wang, Y Xu, C Liu, M Luther
Journal of Cleaner Production 201, 439-451, 2018
572018
Techno-economic analysis for constructing solar photovoltaic projects on building envelopes
Y Li, C Liu
Building and Environment 127, 37-46, 2018
552018
An approximation method for evaluating flash flooding mitigation of sponge city strategies–a case study of Central Geelong
Y Li, HX Li, J Huang, C Liu
Journal of Cleaner Production 257, 120525, 2020
522020
Measuring efficiency, effectiveness and overall performance in the Chinese construction industry
X Hu, C Liu
Engineering, Construction and Architectural Management 25 (6), 780-797, 2018
522018
A panel vector error correction approach to forecasting demand in regional construction markets
H Jiang, C Liu
Construction Management and Economics 32 (12), 1205-1221, 2014
522014
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20