Folgen
Shi Qiang Liu
Titel
Zitiert von
Zitiert von
Jahr
Scheduling trains as a blocking parallel-machine job shop scheduling problem
SQ Liu, E Kozan
Computers & Operations Research 36 (10), 2840-2852, 2009
1812009
Scheduling trains with priorities: a no-wait blocking parallel-machine job-shop scheduling model
SQ Liu, E Kozan
Transportation Science 45 (2), 175-198, 2011
1232011
Innovation-driven industrial green development: The moderating role of regional factors
W Li, J Wang, R Chen, Y Xi, SQ Liu, F Wu, M Masoud, X Wu
Journal of Cleaner Production 222, 344-354, 2019
1072019
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
SQ Liu, HL Ong, KM Ng
Advances in Engineering Software 36 (3), 199-205, 2005
882005
New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems
SQ Liu, E Kozan
Expert Systems with Applications 43, 59-65, 2016
762016
Deep reinforcement learning for the dynamic and uncertain vehicle routing problem
W Pan, SQ Liu*
Applied Intelligence 53, 405-422, 2023
742023
Open pit block sequencing optimisation: a mathematical model and solution technique
A Mousavi, E Kozan, SQ Liu
Engineering Optimization 48 (11), 1932-1950, 2016
692016
A demand-responsive decision support system for coal transportation
E Kozan, SQ Liu
Decision Support Systems 54 (1), 665-680, 2012
622012
Scheduling a flow shop with combined buffer conditions
SQ Liu, E Kozan
International Journal of Production Economics 117 (2), 371-380, 2009
612009
A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem
SQ Liu, E Kozan
Journal of the Operational Research Society 63 (2), 168-182, 2012
552012
A comprehensive interdisciplinary review of mine supply chain management
L Zeng, SQ Liu*, E Kozan, P Corry, M Masoud
Resources Policy 74, 102274, 2021
542021
Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements
SQ Liu, E Kozan
Computers & Operations Research 74, 31-41, 2016
512016
A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations
E Kozan, SQ Liu
Mining Technology 125 (1), 47-53, 2016
502016
Heuristic approaches to solve e-scooter assignment problem
M Masoud, M Elhenawy, MH Almannaa, SQ Liu, S Glaser, ...
IEEE access 7, 175093-175105, 2019
482019
A hybrid metaheuristic algorithm to optimise a real-world robotic cell
SQ Liu, E Kozan
Computers & Operations Research 84, 188-194, 2017
482017
A novel self-organizing constructive neural network for estimating aircraft trip fuel consumption
WA Khan, SH Chung, HL Ma, SQ Liu, CY Chan
Transportation Research Part E 132, 72-96, 2019
462019
Job shop scheduling with a combination of four buffering constraints
SQ Liu, E Kozan, M Masoud, Y Zhang, FTS Chan
International Journal of Production Research 56 (9), 3274-3293, 2018
462018
A fast tabu search algorithm for the group shop scheduling problem
SQ Liu, HL Ong, KM Ng
Advances in Engineering Software 36 (8), 533-539, 2005
452005
Optimizing the low-carbon flexible job shop scheduling problem with discrete whale optimization algorithm
F Luan, Z Cai, S Wu, SQ Liu*, Y He
Mathematics 7 (8), 688, 2019
442019
A dynamic scheduling approach for optimizing the material handling operations in a robotic cell
P Yan, SQ Liu*, T Sun, K Ma
Computers & Operations Research 99, 166-177, 2018
422018
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20