Folgen
Shih-Wei Lin
Shih-Wei Lin
長庚大學
Bestätigte E-Mail-Adresse bei mail.cgu.edu.tw
Titel
Zitiert von
Zitiert von
Jahr
Particle swarm optimization for parameter determination and feature selection of support vector machines
SW Lin, KC Ying, SC Chen, ZJ Lee
Expert systems with applications 35 (4), 1817-1824, 2008
11412008
Parameter determination of support vector machine and feature selection using simulated annealing approach
SW Lin, ZJ Lee, SC Chen, TY Tseng
Applied soft computing 8 (4), 1505-1512, 2008
4422008
A simulated annealing heuristic for the capacitated location routing problem
FY Vincent, SW Lin, W Lee, CJ Ting
Computers & Industrial Engineering 58 (2), 288-299, 2010
4142010
An intelligent algorithm with feature selection and decision rules applied to anomaly intrusion detection
SW Lin, KC Ying, CY Lee, ZJ Lee
Applied Soft Computing 12 (10), 3285-3290, 2012
2972012
Solving the truck and trailer routing problem based on a simulated annealing heuristic
SW Lin, FY Vincent, SY Chou
Computers & Operations Research 36 (5), 1683-1692, 2009
2672009
Applying hybrid meta-heuristics for capacitated vehicle routing problem
SW Lin, ZJ Lee, KC Ying, CY Lee
Expert Systems with Applications 36 (2), 1505-1512, 2009
2182009
Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm
SW Lin, KC Ying, CY Huang
International Journal of Production Research 51 (16), 5029-5038, 2013
2022013
A simulated annealing heuristic for the truck and trailer routing problem with time windows
SW Lin, FY Vincent, CC Lu
Expert Systems with Applications 38 (12), 15244-15252, 2011
1892011
A simulated annealing heuristic for the team orienteering problem with time windows
SW Lin, FY Vincent
European Journal of Operational Research 217 (1), 94-107, 2012
1882012
Dynamic parking negotiation and guidance using an agent-based platform
SY Chou, SW Lin, CC Li
Expert Systems with applications 35 (3), 805-817, 2008
1682008
Minimizing makespan for the distributed hybrid flowshop scheduling problem with multiprocessor tasks
KC Ying, SW Lin
Expert systems with applications 92, 132-141, 2018
1492018
Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach
KC Ying, SW Lin
International Journal of Production Research 44 (16), 3161-3177, 2006
1352006
An enhanced ant colony optimization (EACO) applied to capacitated vehicle routing problem
CY Lee, ZJ Lee, SW Lin, KC Ying
Applied Intelligence 32, 88-95, 2010
1262010
Combining support vector machine with genetic algorithm to classify ultrasound breast tumor images
WJ Wu, SW Lin, WK Moon
Computerized Medical Imaging and Graphics 36 (8), 627-633, 2012
1162012
Multi-start simulated annealing heuristic for the location routing problem with simultaneous pickup and delivery
FY Vincent, SW Lin
Applied soft computing 24, 284-290, 2014
1152014
Makespan minimization for scheduling unrelated parallel machines with setup times
KC Ying, ZJ Lee, SW Lin
Journal of Intelligent Manufacturing 23, 1795-1803, 2012
1122012
Robust scheduling on a single machine to minimize total flow time
CC Lu, SW Lin, KC Ying
Computers & Operations Research 39 (7), 1682-1691, 2012
1092012
Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics
SW Lin, KC Ying
Omega 64, 115-125, 2016
1082016
Minimizing makespan for solving the distributed no-wait flowshop scheduling problem
SW Lin, KC Ying
Computers & Industrial Engineering 99, 202-209, 2016
1082016
Solving the team orienteering problem using effective multi-start simulated annealing
SW Lin
Applied Soft Computing 13 (2), 1064-1073, 2013
1052013
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20