Παρακολούθηση
Nenad Ivanisevic
Nenad Ivanisevic
Professor, Faculty of Civil Engineering University of Belgrade
Η διεύθυνση ηλεκτρονικού ταχυδρομείου έχει επαληθευτεί στον τομέα grf.bg.ac.rs
Τίτλος
Παρατίθεται από
Παρατίθεται από
Έτος
The successful delivery of megaprojects: a novel research method
G Locatelli, M Mikic, M Kovacevic, N Brookes, N Ivanisevic
Project management journal 48 (5), 78-94, 2017
982017
Circular economy in construction and demolition waste management in the western balkans: A sustainability assessment framework
A Nadazdi, Z Naunovic, N Ivanisevic
Sustainability 14 (2), 871, 2022
592022
Construction cost estimation of reinforced and prestressed concrete bridges using machine learning
M Kovačević, N Ivanišević, P Petronijević, V Despotović
Građevinar 73 (01), 1-13, 2021
452021
Application of artificial neural networks for hydrological modelling in Karst
M Kovačević, N Ivanišević, T Dašić, L Marković
Građevinar 70 (01.), 1-10, 2018
392018
A computational method for laminated composite plates based on layerwise theory
M Rakočević, S Popović, N Ivanišević
Composites Part B: Engineering 122, 202-218, 2017
232017
Methods of calculating depreciation expenses of construction machinery
P Petronijević, N Ivanišević, M Rakočević, D Arizanović
Journal of Applied Engineering Science 10 (1), 43-48, 2012
162012
Application of artificial intelligence for the estimation of concrete and reinforcement consumption in the construction of integral bridges
Ž Beljkaš, M Knežević, S Rutešić, N Ivanišević
Advances in Civil Engineering 2020 (1), 8645031, 2020
152020
Fire-resistance prognostic model for reinforced concrete columns
M Lazarevska, M Knežević, M Cvetkovska, N Ivanišević, T Samardžioska, ...
Građevinar 64 (7), 565-571, 2012
14*2012
Detection and in-depth analysis of causes of delay in construction projects: Synergy between machine learning and expert knowledge
MZ Ivanović, Đ Nedeljković, Z Stojadinović, D Marinković, N Ivanišević, ...
Sustainability 14 (22), 14927, 2022
132022
Mark of the investment projects in civil engineering with the special retrospection to the economical-financial mark of the project
J Ćetković, M Knežević, N Ivanišević, S Rutešić
Terra Spectra-Central European Journal of Spatial and Landscape Planning 2 …, 2010
122010
Early highway construction cost estimation: Selection of key cost drivers
N Simić, N Ivanišević, Đ Nedeljković, A Senić, Z Stojadinović, M Ivanović
Sustainability 15 (6), 5584, 2023
102023
Decision-support system for estimating resource consumption in bridge construction based on machine learning
M Kovačević, N Ivanišević, D Stević, LM Marković, B Bulajić, L Marković, ...
Axioms 12 (1), 19, 2022
92022
Risks in infrastructure construction projects and BIM as a risk avoiding technique-Serbian market survey
M Mikic, D Arizanovic, N Ivaniševic
International Scientific Conference People, Buildings and Environment, 26-37, 2012
92012
Dinamički planovi utemeljeni na ciklusima rada
D Marinković, Z Stojadinović, N Ivanišević
Građevinar 65 (11.), 993-1002, 2013
62013
Application of fuzzy logic on selection of contractors for construction of high rise buildings
Z Beljkas, Z Prascevic, N Ivanisevic, M Knezevic, M Cvetkovska
IOP Conference Series: Earth and Environmental Science 222 (1), 012021, 2019
52019
Application of artificial neural networks for hydrological modelling in karst, Građevinar, 70 (2018) 1
M Kovačević, N Ivanišević, T Dašić, L Marković
5
Special Purpose Entities in Megaprojects
N Brookes, N Ivanišević, A Lukasiewicz, T Sainati, C lo Storto
Transport and Urban Development, Action megaproject TU 1003, 0
5
AHP based contractor selection procedure for highway infrastructure projects in Serbia
M Petronijević, A Nikolić, M Mikić, N Ivansevic
12th International conference organization, technology and management in …, 2015
32015
Critical risks in Serbian infrastructure projects
M Mikić, Z Petojević, N Ivanišević
Proceedings of 11th International Conference:" Organization, Technology and …, 2013
32013
Work cycle based scheduling
D Marinković, Z Stojadinović, N Ivanišević
Građevinar 65 (11), 993-1002, 2013
32013
Δεν είναι δυνατή η εκτέλεση της ενέργειας από το σύστημα αυτή τη στιγμή. Προσπαθήστε ξανά αργότερα.
Άρθρα 1–20