Παρακολούθηση
Nazanin Kordestani
Nazanin Kordestani
PhD Student in Project and Construction Management
Η διεύθυνση ηλεκτρονικού ταχυδρομείου έχει επαληθευτεί στον τομέα massey.ac.nz
Τίτλος
Παρατίθεται από
Παρατίθεται από
Έτος
Evaluating Solutions to Facilitate the Presence of Operation and Maintenance Contractors in the Pre-Occupancy Phases: A Case Study of Road Infrastructure Projects
N Kordestani Ghelenoei, E Saghatforoush, H Athari Nikooravan, ...
International Journal of Construction Management 10, 222-241, 2018
222018
Potential of modular offsite construction for emergency situations: a New Zealand study
WM Shahzad, G Rajakannu, N Kordestani Ghalenoei
Buildings 12 (11), 1970, 2022
142022
Benefits of using constructability, operability, and maintainability in infrastructure projects: A meta-synthesis
S Jadidoleslami, E Saghatforoush, N Kordestani Ghaleenoee, C Preece
The CRICOM 21st International Conference on Advancement of Construction …, 2016
122016
Challenges of offsite construction and BIM implementation: providing a framework for integration in New Zealand
N Kordestani Ghalenoei, M Babaeian Jelodar, D Paes, M Sutrisna
Smart and Sustainable Built Environment 13 (4), 780-808, 2024
82024
An FCM-based dynamic modeling of operability and maintainability barriers in road projects
N Kordestani Ghaleenoei, E Saghatforoush, T Mansouri, A Zareravasan
International Journal of Pavement Research and Technology 15 (2), 367-383, 2022
82022
Evaluating the barriers to the presence of operation and maintenance contractors in the pre-occupancy stages of infrastructure projects: a case study of road infrastructure …
NK Ghalenoee, E Saghatforoush, HA Nikooravan, P Christopher
International Journal of Advanced Operations Management 10 (4), 345-369, 2018
72018
Research Trends on Benefits of Implementing Constructability, Operability, and Maintainability.
N Kordestani Ghaleenoe, E Saghatforoush, S JadidolEslami, C Preece
Journal of Engineering, Project, and Production Management 7 (2), 55, 2017
72017
A practical framework to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: a case study
N Kordestani Ghalenoee, E Saghatforoush, H Athari Nikooravan, ...
International Journal of Project Organisation and Management 10 (3), 222-241, 2018
6*2018
Operability and maintainability obstacles: an exploratory factor analysis approach
N Kordestani Ghalenoei, E Saghatforoush, A Zareravasan
International Journal of Advanced Operations Management 13 (1), 92-111, 2021
52021
Toward improving capacity and capability of prefabrication construction in New Zealand’s construction sector
NK Ghalenoei, MB Jelodar, D Paes, M Sutrisna
7th New Zealand Built Environment Research Symposium, 413, 2022
32022
Potential of Modular Offsite Construction for Emergency Situations: A New Zealand Study. Buildings 2022, 12, 1970
WM Shahzad, G Rajakannu, N Kordestani Ghalenoei
s Note: MDPI stays neutral with regard to jurisdictional claims in published …, 2022
32022
Exploring Off-site Construction and Building Information Modelling Integration Challenges; Enhancing Capabilities within New Zealand Construction Sector
MS Nazanin Kordestani Ghalenoei, Mostafa Babaiean Jelodar, Daniel Paes
IOP Conference Series: Earth and Environmental Science 1101, 2022
22022
The Use of Building Information Modelling in Fire Safety Engineering
NK Ghalenoei, E Saghatforoush, A Rezvanian
The First International and Second National Conference on Management, Ethic …, 2020
22020
Assessment and identify strategies for entering maintenance contractors to design and implement the initial studies of infrastructure projects
N Kordestani, E Saghatforoush, H Athari Nikooravan
Third International Conference on Applied Research, Civil Engineering …, 2016
22016
A comprehensive evaluation of factors influencing offsite construction and BIM integration in the construction industry
N Kordestani, M Babaeian Jelodar, D Paes, M Sutrisna, D Rahmani
Engineering, Construction and Architectural Management, 2024
2024
Analysis of research trends on benefits of implementing constructability, operability, and maintainability
N Kordestani Ghalenoee, E Saghatforoush, S JadidolEslami, C Preece
2020
The Need for integration of maintenance stage with initial stages of the Iranian road projects
N Kordestani, E Saghatforoush
14th International OTMC-Conference, Zagreb, 2019
2019
Evaluating the barriers to the presence of operation and maintenance contractors in the pre-occupancy stages of infrastructure projects: a case study of road infrastructure …
N Kordestani Ghalenoee, E Saghatforoush, H Athari Nikooravan, ...
International Journal of Advanced Operations Management 10 (4), 2018
2018
A Framework in order to Enhance Maintenance Contractors’ Participation in the Design and Construction Implementation Stages of Road projects
NK Ghalenoei
A Thesis submitted in Partial Fulfillment of the Requirement for the Degree …, 2016
2016
Identification and assessment of strategies for entrance of maintenance contractors to the preliminary studies, design and construction in infrastructure projects
N Kordestani, E Saghatforoush, A Nikouravan, Hamidreza
1st International Conference on Applied Researches in Civil Engineering …, 2016
2016
Δεν είναι δυνατή η εκτέλεση της ενέργειας από το σύστημα αυτή τη στιγμή. Προσπαθήστε ξανά αργότερα.
Άρθρα 1–20