Follow
Nabil Nahas
Title
Cited by
Cited by
Year
Integrated preventive maintenance and production decisions for imperfect processes
M Nourelfath, N Nahas, M Ben-Daya
Reliability engineering & system safety 148, 21-31, 2016
1902016
Ant system for reliability optimization of a series system with multiple-choice and budget constraints
N Nahas, M Nourelfath
Reliability Engineering & System Safety 87 (1), 1-12, 2005
1532005
Coupling ant colony and the degraded ceiling algorithm for the redundancy allocation problem of series–parallel systems
N Nahas, M Nourelfath, D Ait-Kadi
Reliability Engineering & System Safety 92 (2), 211-222, 2007
1322007
A new approach for buffer allocation in unreliable production lines
N Nahas, D Ait-Kadi, M Nourelfath
International journal of production economics 103 (2), 873-881, 2006
1282006
Joint redundancy and imperfect preventive maintenance optimization for series–parallel multi-state degraded systems
M Nourelfath, E Châtelet, N Nahas
Reliability Engineering & System Safety 103, 51-60, 2012
962012
Buffer allocation and preventive maintenance optimization in unreliable production lines
N Nahas
Journal of Intelligent Manufacturing 28 (1), 85-93, 2017
882017
Availability of K-out-of-N: G systems with non-identical components subject to repair priorities
A Khatab, N Nahas, M Nourelfath
Reliability Engineering & System Safety 94 (2), 142-151, 2009
782009
Selecting machines and buffers in unreliable series-parallel production lines
N Nahas, M Nourelfath, D Ait-Kadi
International Journal of Production Research 47 (14), 3741-3774, 2009
672009
Extended great deluge algorithm for the imperfect preventive maintenance optimization of multi-state systems
N Nahas, A Khatab, D Ait-Kadi, M Nourelfath
Reliability Engineering & System Safety 93 (11), 1658-1672, 2008
672008
A self-adjusting adaptive AVR-LFC scheme for synchronous generators
N Nahas, M Abouheaf, A Sharaf, W Gueaieb
IEEE Transactions on Power Systems 34 (6), 5073-5075, 2019
622019
A multi-objective optimization design of industrial robot arms
SA Kouritem, MI Abouheaf, N Nahas, M Hassan
Alexandria Engineering Journal 61 (12), 12847-12867, 2022
542022
Harmony search algorithm: application to the redundancy optimization problem
N Nahas, D Thien-My
Engineering Optimization 42 (9), 845-861, 2010
482010
Optimal design of series production lines with unreliable machines and finite buffers
M Nourelfath, N Nahas, D Ait‐Kadi
Journal of Quality in Maintenance Engineering 11 (2), 121-138, 2005
472005
Selecting machines and buffers in unreliable assembly/disassembly manufacturing networks
N Nahas, M Nourelfath, M Gendreau
International Journal of Production Economics 154, 113-126, 2014
442014
Joint optimization of maintenance, buffers and machines in manufacturing lines
N Nahas, M Nourelfath
Engineering Optimization 50 (1), 37-54, 2018
402018
Quantized hopfield networks for reliability optimization
M Nourelfath, N Nahas
Reliability Engineering & System Safety 81 (2), 191-196, 2003
372003
An ant colony approach to redundancy optimization for multi-state system
M Nourelfath, N Nahas, A Zeblah
International conference on industrial engineering and production management …, 2003
372003
Coupling ant colony optimization and the extended great deluge algorithm for the discrete facility layout problem
M Nourelfath, N Nahas, B Montreuil
Engineering Optimization 39 (8), 953-968, 2007
322007
Analysis of a production line subject to degradation and preventive maintenance
S Wei, M Nourelfath, N Nahas
Reliability Engineering & System Safety 230, 108906, 2023
272023
A multi-objective AVR-LFC optimization scheme for multi-area power systems
N Nahas, M Abouheaf, MN Darghouth, A Sharaf
Electric Power Systems Research 200, 107467, 2021
232021
The system can't perform the operation now. Try again later.
Articles 1–20