Characterization of automatic guided vehicle dispatching rules PJ Egbelu, JMA Tanchoco The International Journal of Production Research 22 (3), 359-374, 1984 | 830 | 1984 |
Scheduling of inbound and outbound trucks in cross docking systems with temporary storage W Yu, PJ Egbelu European journal of operational research 184 (1), 377-396, 2008 | 511 | 2008 |
The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system PJ Egbelu Material flow 4, 17-32, 1987 | 297 | 1987 |
Potentials for bi-directional guide-path for automated guided vehicle based systems PJ Egbelu, JMA Tanchoco International Journal of Production Research 24 (5), 1075-1097, 1986 | 265 | 1986 |
Determination of the total number of vehicles in an AGV-based material transport system JMA Tanchoco, PJ Egbelu, F Taghaboni Material flow 4 (1-2), 33-51, 1987 | 197 | 1987 |
Metaheuristics for project and construction management–A state-of-the-art review TW Liao, PJ Egbelu, BR Sarker, SS Leu Automation in construction 20 (5), 491-505, 2011 | 186 | 2011 |
Guide path design and location of load pick-up/drop-off points for an automated guided vehicle system WG Goetz Jr, PJ Egbelu The International Journal of Production Research 28 (5), 927-941, 1990 | 151 | 1990 |
Simultaneous dock assignment and sequencing of inbound trucks under a fixed outbound truck schedule in multi-door cross docking operations TW Liao, PJ Egbelu, PC Chang International Journal of Production Economics 141 (1), 212-229, 2013 | 150 | 2013 |
Framework for dynamic positioning of storage/retrieval machines in an automated storage/retrieval system PJ Egbelu The international journal of production research 29 (1), 17-37, 1991 | 144 | 1991 |
A comparison of dwell point rules in an automated storage/retrieval system PJ Egbelu, CT Wu The International Journal of Production Research 31 (11), 2515-2530, 1993 | 124 | 1993 |
Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system PJ Egbelu Journal of Manufacturing Systems 6 (3), 209-221, 1987 | 122 | 1987 |
Scheduling in a production environment with multiple process plans per job KH Kim, PJ Egbelu International Journal of Production Research 37 (12), 2725-2753, 1999 | 117 | 1999 |
Positioning of automated guided vehicles in a loop layout to improve response time PJ Egbelu European Journal of Operational Research 71 (1), 32-44, 1993 | 106 | 1993 |
Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations TW Liao, PJ Egbelu, P Chang Applied Soft Computing 12 (11), 3683-3697, 2012 | 101 | 2012 |
A heuristic approach to the three-dimensional cargo-loading problem CP Han, K Knott, PJ Egbelu THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 27 (5), 757-774, 1989 | 85 | 1989 |
Determination of vehicle requirements in automated guided vehicle systems: a statistical approach R Arifin, PJ Egbelu Production Planning & Control 11 (3), 258-270, 2000 | 82 | 2000 |
A framework for estimating manufacturing cost from geometric design data Y Wei, PJ Egbelu International Journal of Computer Integrated Manufacturing 13 (1), 50-63, 2000 | 79 | 2000 |
ADVISOR: A computer-aided material handling equipment selection system HK Chu, PJ Egbelu, CT Wu International Journal of Production Research 33 (12), 3311-3329, 1995 | 78 | 1995 |
Virtual cell formation KC Ko, PJ Egbelu International Journal of Production Research 41 (11), 2365-2389, 2003 | 75 | 2003 |
Scheduling in a manufacturing shop with sequence-dependent setups C Zhou, PJ Egbelu Robotics and Computer-Integrated Manufacturing 5 (1), 73-81, 1989 | 67 | 1989 |