A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems M Nehring, PF Knights, MS Kizil, E Hay International journal of mining science and technology 28 (2), 205-214, 2018 | 99 | 2018 |
Integrated short-and medium-term underground mine production scheduling M Nehring, E Topal, M Kizil, P Knights Journal of the Southern African Institute of Mining and Metallurgy 112 (5 …, 2012 | 76 | 2012 |
A new mathematical programming model for production schedule optimization in underground mining operations M Nehring, E Topal, J Little Journal of the Southern African Institute of Mining and Metallurgy 110 (8 …, 2010 | 72 | 2010 |
Adjusted real option valuation to maximise mining project value–a case study using century mine S Shafiee, E Topal, M Nehring Project Evaluation Conference, 125-134, 2009 | 72 | 2009 |
Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming M Nehring, E Topal, P Knights Mining Technology 119 (4), 212-220, 2010 | 65 | 2010 |
A local branching heuristic for the open pit mine production scheduling problem M Samavati, D Essam, M Nehring, R Sarker European Journal of Operational Research 257 (1), 261-271, 2017 | 61 | 2017 |
Production schedule optimisation in underground hard rock mining using mixed integer programming M Nehring, E Topal Project evaluation conference, 169-175, 2007 | 56 | 2007 |
Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time I Dzakpata, P Knights, MS Kizil, M Nehring, SM Aminossadati | 54 | 2016 |
An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery M Nehring, X Cheng Journal of Cleaner Production 127, 228-239, 2016 | 53 | 2016 |
Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications M Dean, P Knights, MS Kizil, M Nehring AusIMM 2015 3rd International Future Mining Conference, Sydney, NSW …, 2015 | 52 | 2015 |
The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II) S Foroughi, JK Hamidi, M Monjezi, M Nehring Resources Policy 63, 101408, 2019 | 48 | 2019 |
A new methodology for the open-pit mine production scheduling problem M Samavati, D Essam, M Nehring, R Sarker Omega 81, 169-182, 2018 | 46 | 2018 |
A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry M Samavati, D Essam, M Nehring, R Sarker International Journal of Production Economics 193, 12-20, 2017 | 45 | 2017 |
Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions F Sotoudeh, M Nehring, M Kizil, P Knights, A Mousavi Resources Policy 68, 101809, 2020 | 36 | 2020 |
A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining J Little, M Nehring, E Topal Proceedings-Australian Mining Technology Conference. Twin Waters. The …, 2008 | 32 | 2008 |
Production planning and scheduling in mining scenarios under IPCC mining systems M Samavati, D Essam, M Nehring, R Sarker Computers & Operations Research 115, 104714, 2020 | 29 | 2020 |
Operating value optimisation using simulation and mixed integer programming A Salama, M Nehring, J Greberg International Journal of Mining, Reclamation and Environment 28 (1), 25-46, 2014 | 29 | 2014 |
Evaluation of the impact of commodity price change on mine plan of underground mining A Salama, M Nehring, J Greberg International Journal of Mining Science and Technology 25 (3), 375-382, 2015 | 28 | 2015 |
Integrated underground mining and pre-concentration systems; a critical review of technical concepts and developments F Sotoudeh, M Nehring, M Kizil, P Knights International Journal of Mining, Reclamation and Environment 35 (3), 153-182, 2021 | 27 | 2021 |
Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations T Copland, M Nehring Journal of the Southern African Institute of Mining and Metallurgy 116 (12 …, 2016 | 27 | 2016 |