Resource-constrained construction project scheduling model for profit maximization considering cash flow SS Liu, CJ Wang Automation in Construction 17 (8), 966-974, 2008 | 165 | 2008 |
Optimizing project selection and scheduling problems with time-dependent resource constraints SS Liu, CJ Wang Automation in Construction 20 (8), 1110-1119, 2011 | 134 | 2011 |
Optimizing linear project scheduling with multi-skilled crews SS Liu, CJ Wang Automation in construction 24, 16-23, 2012 | 130 | 2012 |
Optimization model for resource assignment problems of linear construction projects SS Liu, CJ Wang Automation in Construction 16 (4), 460-473, 2007 | 110 | 2007 |
Profit optimization for multiproject scheduling problems considering cash flow SS Liu, CJ Wang Journal of Construction Engineering and Management 136 (12), 1268-1278, 2010 | 77 | 2010 |
Analyzing relationships among success variables of construction partnering using structural equation modeling: a case study of Taiwan's construction industry WT Chen, TT Chen, C Sheng Lu, SS Liu Journal of Civil Engineering and Management 18 (6), 783-794, 2012 | 66 | 2012 |
Construction rescheduling based on a manufacturing rescheduling framework SS Liu, KC Shih Automation in Construction 18 (6), 715-723, 2009 | 52 | 2009 |
Relationships between social support, social status perception, social identity, work stress, and safety behavior of construction site management personnel YH Huang, CY Sung, WT Chen, SS Liu Sustainability 13 (6), 3184, 2021 | 36 | 2021 |
A decade of value engineering in construction projects WT Chen, HC Merrett, SS Liu, N Fauzia, FN Liem Advances in Civil Engineering 2022 (1), 2324277, 2022 | 34 | 2022 |
Two‐stage profit optimization model for linear scheduling problems considering cash flow SS Liu, CJ Wang Construction Management and Economics 27 (11), 1023-1037, 2009 | 34 | 2009 |
Measuring the perception of safety among Taiwan construction managers WT Chen, CS Lu, SS Liu, MS Wang Journal of civil engineering and management 19 (1), 37-48, 2013 | 30 | 2013 |
A framework of critical resource chain for project schedule analysis L Shu‐Shun, KC Shih Construction management and economics 27 (9), 857-869, 2009 | 19 | 2009 |
Resource-constrained scheduling of linear projects: A heuristic approach using tabu search heuristics SS Liu Purdue University, 1999 | 18 | 1999 |
Preventive maintenance model for national school buildings in Indonesia using a constraint programming approach SS Liu, M Faizal Ardhiansyah Arifin Sustainability 13 (4), 1874, 2021 | 15 | 2021 |
An Integrated Optimization Model for Life Cycle Pavement Maintenance Budgeting Problems SS Liu, MFA Arifin, WT Chen IEEE Access 10, 13884-13900, 2022 | 10 | 2022 |
Emergency repair scheduling model for road network integrating rescheduling feature SS Liu, MFA Arifin, WT Chen, YH Huang Applied Sciences 11 (4), 1447, 2021 | 8 | 2021 |
Lithium Metal Batteries Enabled by Synergetic Additives in Commercial Carbonate Electrolytes, ACS Energy Lett. 6(2021) 1839–1848 N Piao, S Liu, B Zhang, X Ji, X Fan, L Wang, PF Wang, T Jin, SC Liou, ... | 8 | |
Optimization model for the pavement pothole repair problem considering consumable resources SS Liu, A Budiwirawan, MFA Arifin, WT Chen, YH Huang Symmetry 13 (3), 364, 2021 | 7 | 2021 |
Discrepancies between management and labor perceptions of construction site safety WT Chen, SS Liu, SW Liou, WZ Sun Applied Mechanics and Materials 174, 2950-2956, 2012 | 7 | 2012 |
Two-stage optimization model for life cycle maintenance scheduling of bridge infrastructure SS Liu, HY Huang, N Risna Dyah Kumala Applied Sciences 10 (24), 8887, 2020 | 5 | 2020 |