Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach AE Abu El-Maaty, AM El-Kholy, AY Akal Engineering, Construction and Architectural Management 24 (5), 809-827, 2017 | 53 | 2017 |
Management of highway projects in Egypt through identifying factors influencing quality performance A Ebrahim Abu El-Maaty, AY Akal, S El-Hamrawy Journal of Construction Engineering 2016 (1), 4823630, 2016 | 33 | 2016 |
Determining the stationary financial cause of contracting firms failure A El-Kholy, AY Akal International Journal of Construction Management 21 (8), 818-833, 2019 | 29 | 2019 |
Assessing and Allocating the Financial Viability Risk Factors in Public-Private Partnership Wastewater Treatment Plant Projects A El-Kholy, AY Akal Engineering, Construction and Architectural Management 28 (10), 3014-3040, 2020 | 20 | 2020 |
Mapping the Causes of Time, Cost Overruns and Quality Shortfall in Egyptian Public Highway Projects AY Akal, AE Abu-Maaty, S El-Hamrawy European Business & Management 3 (6), 120-126, 2017 | 17 | 2017 |
Success Factors of Highway Construction Projects in Egypt: AHP Approach AE Abu-Maaty, S El-Hamrawy, AY Akal KICEM Journal of Construction Engineering and Project Management 6 (4), 7-14, 2016 | 17* | 2016 |
Proposed Sustainability Composite Index of Highway Infrastructure Projects and Its Practical Implications A El-Kholy, AY Akal Arabian Journal for Science and Engineering 45, 3635-3655, 2019 | 15 | 2019 |
A circular framework for evaluating highway construction projects success: AHP approach AY Akal, AE Abu-Maaty, SAK El-Hamrawy Civil Engineering Journal 2 (7), 324-333, 2016 | 15 | 2016 |
A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners AY Akal, AF Kineber, SR Mohandes Buildings 12 (11), 2022 | 13 | 2022 |
Proposed models to measure the quality of highway projects: regression analysis vs statistical–fuzzy approach SAK El-Hamrawy, AE Abu El-Maaty, AY Akal Engineering, Construction and Architectural Management 24 (6), 988-1003, 2017 | 13 | 2017 |
What are the readability issues in sub-contracting’s tender documents? AY Akal Buildings 12 (6), 839, 2022 | 7 | 2022 |
The Iron Triangle of Projects Management: Quality, Schedule and Cost of Road Infrastructure Projects in Egypt A Abu-Maaty, AY Akal, S El-Hamrawy International Congress and Exhibition" Sustainable Civil Infrastructures …, 2017 | 7 | 2017 |
Exploring the Critical Frequent Factors of Rework and Assigning Strategies to Mitigate their Occurrence in the Egyptian Construction Projects AY Akal, AM El-Kholy Journal of King Saud University-Engineering Sciences, 2021 | 6 | 2021 |
Mechanistic-empirical study of sensitivity of truck tire pressure to asphalt pavement thickness in Egypt AE Behiry, AY Beltagy Int. J. of Eng. Res. and Apps 3 (5), 1760-1771, 2013 | 6 | 2013 |
Fuzzy Assessment of Factors Influencing Quality Level of Highway Projects AY Akal, AE Abu-Maaty International Journal of Management and Fuzzy Systems 2 (2), 6-14, 2016 | 4 | 2016 |
Inflation and Reinforced Concrete Materials: An Investigation of Economic and Environmental Effects AY Akal Sustainability 15 (9), 7687, 2023 | 3 | 2023 |
Enhancing the Construction Projects Safety Performance Level to Confront the Civil Engineering Trades-Related Hazards AY Akal, A El-Kholy Journal of Advances in Management Research 18 (3), 468-501, 2020 | 3 | 2020 |
Financial Risks Contributing to Delay of Oil and Gas Projects in Egypt AYBA Akal International Journal of Accounting, Finance and Risk Management 1 (1), 19-24, 2016 | 3 | 2016 |
Quality Index and Contractor Adjustment Factor of Highway Projects in Egypt S El-Hamrawy, AEA El-Maaty, AYAY Akal Nova Journal of Engineering and Applied Sciences 4 (2), 1-12, 2015 | 3 | 2015 |
Determining the Stationary Cause of Construction Delay in Highway Projects AY Akal Journal of Integrated Engineering and Technology 1 (1), 18-39, 2024 | | 2024 |