Follow
Jafar Khademi Hamidi
Title
Cited by
Cited by
Year
Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system
JK Hamidi, K Shahriar, B Rezai, J Rostami
Tunnelling and Underground Space Technology 25 (4), 333-345, 2010
3212010
Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions
K Shahriar, M Sharifzadeh, JK Hamidi
Tunnelling and Underground Space Technology 23 (3), 318-325, 2008
1442008
Application of fuzzy set theory to rock engineering classification systems: an illustration of the rock mass excavability index
J Khademi Hamidi, K Shahriar, B Rezai, H Bejari
Rock mechanics and rock engineering 43, 335-350, 2010
1202010
Simultaneous effects of joint spacing and orientation on TBM cutting efficiency in jointed rock masses
H Bejari, J Khademi Hamidi
Rock mechanics and rock engineering 46, 897-907, 2013
1092013
Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
J Khademi Hamidi, K Shahriar, B Rezai, J Rostami, H Bejari
Bulletin of engineering geology and the environment 69, 523-532, 2010
972010
A case study on TBM tunnelling in fault zones and lessons learned from ground improvement
M Bayati, JK Hamidi
Tunnelling and Underground Space Technology 63, 162-170, 2017
932017
Optimization of flyrock and rock fragmentation in the Tajareh limestone mine using metaheuristics method of firefly algorithm
PF Asl, M Monjezi, JK Hamidi, DJ Armaghani
Engineering with Computers 34, 241-251, 2018
922018
The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)
S Foroughi, JK Hamidi, M Monjezi, M Nehring
Resources Policy 63, 101408, 2019
482019
A closer look into chip shape/size and efficiency of rock cutting with a simple chisel pick: a laboratory scale investigation
M Mohammadi, J Khademi Hamidi, J Rostami, K Goshtasbi
Rock Mechanics and Rock Engineering 53, 1375-1392, 2020
462020
An investigation of the relationship between muck geometry, TBM performance, and operational parameters: A case study in Golab II water transfer tunnel
S Heydari, JK Hamidi, M Monjezi, A Eftekhari
Tunnelling and Underground Space Technology 88, 73-86, 2019
462019
A discrepancy between observed and predicted NATM tunnel behaviors and updating: a case study of the Sabzkuh tunnel
M Taromi, A Eftekhari, JK Hamidi, A Aalianvari
Bulletin of Engineering Geology and the Environment 76, 713-729, 2017
382017
An estimation of the penetration rate of rotary drills using the Specific Rock Mass Drillability index
A Cheniany, KS Hasan, K Shahriar, JK Hamidi
International Journal of Mining Science and Technology 22 (2), 187-193, 2012
382012
An integrated GIS-based approach for geohazards risk assessment in coal mines
V Vaziri, J Khademi Hamidi, AR Sayadi
Environmental earth sciences 77, 1-18, 2018
272018
A comparison of artificial neural network and multiple regression analysis in TBM performance prediction
M Gholami, K Shahriar, M Sharifzadeh, JK Hamidi
ISRM International Symposium-Asian Rock Mechanics Symposium, ISRM-ARMS7-2012-115, 2012
262012
TBM tunneling and analysis of high gas emission accident in Zagros long tunnel
K Shahriar, J Rostami, J KhademiHamidi
Proceedings of the ITA-AITES World Tunnel Congress, 2009
182009
Assessment of ground squeezing and ground pressure imposed on TBM shield
JK Hamidi, H Bejari, K Shahriar, B Rezai
Proceedings of the 12th International Conference of International …, 2008
152008
Use of rock microscale properties for introducing a cuttability index in rock cutting with a chisel pick
K Rostami, JK Hamidi, HR Nejati
Arabian Journal of Geosciences 13 (18), 960, 2020
142020
Application of decision tree to selection of MTBM for adverse geological conditions
A Jafarimoghaddam, JK Hamidi, M Najafi
International Journal of Mining Science and Technology 23 (4), 503-511, 2013
102013
An experimental study of water saturation effect on chipping efficiency of a chisel pick in cutting some low-and medium-strength rocks
H Bejari, JK Hamidi
Rock Mechanics and Rock Engineering 56 (6), 4507-4533, 2023
92023
A preliminary cost estimation for short tunnels construction using parametric method
AR Sayadi, JK Hamidi, M Monjezi, M Najafzadeh
Engineering Geology for Society and Territory-Volume 1: Climate Change and …, 2014
92014
The system can't perform the operation now. Try again later.
Articles 1–20