Follow
Rui Jiang
Rui Jiang
Shenzhen Institute of Advanced Technology, Chinese Academy of Sciences
Verified email at siat.ac.cn
Title
Cited by
Cited by
Year
A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation
R Jiang, C Mao, L Hou, C Wu, J Tan
Journal of cleaner production 173, 225-234, 2018
2362018
Critical review of data-driven decision-making in bridge operation and maintenance
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Structure and infrastructure engineering 18 (1), 47-70, 2021
1722021
Estimation of environmental impacts of roads through life cycle assessment: A critical review and future directions
R Jiang, P Wu
Transportation Research Part D: Transport and Environment 77, 148-163, 2019
1112019
Ontological knowledge base for concrete bridge rehabilitation project management
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Automation in construction 121, 103428, 2021
1062021
Government efforts and roadmaps for building information modeling implementation: Lessons from Singapore, the UK and the US
R Jiang, C Wu, X Lei, A Shemery, KD Hampson, P Wu
Engineering, Construction and Architectural Management 29 (2), 782-818, 2022
712022
Transformer-based deep learning model and video dataset for unsafe action identification in construction projects
M Yang, C Wu, Y Guo, R Jiang, F Zhou, J Zhang, Z Yang
Automation in Construction 146, 104703, 2023
512023
Data-driven fire safety management at building construction sites: Leveraging CNN
Y Su, C Mao, R Jiang, G Liu, J Wang
Journal of management in engineering 37 (2), 04020108, 2021
462021
Hybrid deep learning model for automating constraint modelling in advanced working packaging
C Wu, X Wang, P Wu, J Wang, R Jiang, M Chen, M Swapan
Automation in Construction 127, 103733, 2021
422021
Graph‐based deep learning model for knowledge base completion in constraint management of construction projects
C Wu, X Li, R Jiang, Y Guo, J Wang, Z Yang
Computer‐Aided Civil and Infrastructure Engineering 38 (6), 702-719, 2023
412023
Estimating carbon emissions from road use, maintenance and rehabilitation through a hybrid life cycle assessment approach–A case study
R Jiang, C Wu, Y Song, P Wu
Journal of Cleaner Production 277, 123276, 2020
332020
Factors influencing the adoption of renewable energy in the US residential sector: An optimal parameters-based geographical detector approach
R Jiang, P Wu, Y Song, C Wu, P Wang, Y Zhong
Renewable Energy 201, 450-461, 2022
282022
Developing a hybrid approach to extract constraints related information for constraint management
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Automation in Construction 124, 103563, 2021
282021
Ecosystem visualization and analysis of Chinese prefabricated housing industry
R Jiang, C Wu, C Mao, A Shrestha
Procedia Engineering 145, 436-443, 2016
282016
Understanding laborers’ behavioral diversities in multinational construction projects using integrated simulation approach
C Wu, C Chen, R Jiang, P Wu, B Xu, J Wang
Engineering, Construction and Architectural Management 26 (9), 2120-2146, 2019
232019
Driving factors behind energy-related carbon emissions in the US road transport sector: A decomposition analysis
R Jiang, P Wu, C Wu
International journal of environmental research and public health 19 (4), 2321, 2022
222022
Knowledge graph-enabled adaptive work packaging approach in modular construction
X Li, C Wu, Z Yang, Y Guo, R Jiang
Knowledge-Based Systems 260, 110115, 2023
212023
Selecting the optimal network-level pavement maintenance budget scenario based on sustainable considerations
R Jiang, P Wu, C Wu
Transportation Research Part D: Transport and Environment 97, 102919, 2021
162021
Techno-economic analysis of residential building heating strategies for cost-effective upgrades in European cities
F Yu, W Feng, M Luo, K You, M Ma, R Jiang, J Leng, L Sun
Iscience 26 (9), 2023
102023
A teacher–student deep learning strategy for extreme low resolution unsafe action recognition in construction projects
M Yang, C Wu, Y Guo, Y He, R Jiang, J Jiang, Z Yang
Advanced Engineering Informatics 59, 102294, 2024
72024
Integration of BIM and computer simulations in modular construction, A case study
C Wu, R Jiang, X Li
Modular and Offsite Construction (MOC) Summit Proceedings, 2016
72016
The system can't perform the operation now. Try again later.
Articles 1–20