Follow
Isnaini Putri Laili Nur Alimah
Isnaini Putri Laili Nur Alimah
Universitas Sebelas Maret Surakarta
Verified email at student.uns.ac.id
Title
Cited by
Cited by
Year
Cooling passive safety features of Reaktor Daya Eksperimental
T Setiadipura, S Bakhri, GR Sunaryo, DS Wisnusubroto
AIP Conference Proceedings 1984 (1), 2018
462018
Multi-criteria decision making for nuclear power plant selection using fuzzy AHP: Evidence from Indonesia
AG Abdullah, MA Shafii, S Pramuditya, T Setiadipura, K Anzhar
Energy and AI 14, 100263, 2023
422023
Preliminary neutronic design of high burnup OTTO cycle pebble bed reactor
T Setiadipura, D Irwanto, Z Zuhair
Atom Indonesia 41 (1), 7-15, 2015
382015
Preliminary study on mass flow rate in passive cooling experimental simulation during transient using NC-queen apparatus
M Juarsa, JH Purba, HM Kusuma, T Setiadipura, S Widodo
National Nuclear Energy Agency of Indonesia, 2014
302014
Development of Monte Carlo-based pebble bed reactor fuel management code
T Setiadipura, T Obara
Annals of Nuclear Energy 71, 313-321, 2014
252014
HABC: Hybrid artificial bee colony for generating variable t-way test sets
AK Alazzawi, HM Rais, S Basri
J. Eng. Sci. Technol 15 (2), 746-767, 2020
242020
The effects of applying silicon carbide coating on core reactivity of pebble-bed HTR in water ingress accident
Zuhair, Suwoto, T Setiadipura, Z Su’ud
Kerntechnik 82 (1), 92-97, 2017
242017
Dynamics modeling and stability analysis of a fluidized bed nuclear reactor
D Lathouwers, A Agung, T Van Der Hagen, H Van Dam, CC Pain, ...
Progress in Nuclear Energy 43 (1-4), 437-443, 2003
222003
Design study of a straight tube bundle steam generator for Reaktor Daya Eksperimental
M Pancoko, A Nugroho, D Priambodo, T Setiadipura
International Journal of Mechanical Engineering and Technology (IJMET) 9 (5 …, 2018
202018
Validation of PARCS/RELAP5 coupled codes against a load rejection transient at the Ringhals-3 NPP
A Agung, J Bánáti, M Stålek, C Demazière
Nuclear Engineering and Design 257, 31-44, 2013
202013
Developing a Multi-Criteria Decision-Making model for nuclear power plant location selection using Fuzzy Analytic Hierarchy Process and Fuzzy VIKOR methods focused on socio …
RSN Mahmudah, DI Putri, AG Abdullah, MA Shafii, DL Hakim, ...
Cleaner Engineering and Technology 19, 100737, 2024
192024
Study on characteristic of temperature coefficient of reactivity for plutonium core of pebbled bed reactor
T Setiadipura, S Bakhri, GR Sunaryo
Journal of Physics: Conference Series 962 (1), 012058, 2018
192018
Study on the Characteristics of Effective Delayed Neutron Fraction (βeff) for Pebble-Bed Reactor with Plutonium Fuel
Zuhair, Suwoto, T Setiadipura, JC Kuijper
Iranian Journal of Science and Technology, Transactions A: Science 43 (6 …, 2019
182019
Pengolahan Sampah Plastik Memakai Teknologi Pirolisis Untuk Pembelajaran dan Konservasi Lingkungan di Pondok Pesantren Al-Anwar Sarang Rembang, Jawa Tengah
F Kasim, MK Ridwan, MYA Putra
Jurnal Bakti Saintek: Jurnal Pengabdian Masyarakat Bidang Sains Dan …, 2018
182018
Conceptual core design study for Indonesian Space Reactor (ISR)
MF Khandaq, AW Harto, A Agung
Progress in Nuclear Energy 118, 103109, 2020
172020
The implication of thorium fraction on neutronic parameters of pebble bed reactor
Z Zuhair, RAP Dwijayanto, T Setiadipura
Kuwait Journal of Science 48 (3), 2021
162021
Study on MCNP6 model in the calculation of kinetic parameters for pebble bed reactor
T Setiadipura, Z Su'ud
České vysoké učení technické v Praze, 2020
162020
The effects of fuel type on control rod reactivity of pebble-bed reactor
T Setiadipura, JC Kuijper
Nukleonika 64 (4), 131-138, 2019
162019
On an improved design of a fluidized bed nuclear reactor-I: Design modifications and steady-state features
A Agung, D Lathouwers, THJJ van der Hagen, H van Dam, CC Pain, ...
Nuclear technology 153 (2), 117-131, 2006
152006
Neutronic analysis of fuel assembly design in Small-PWR using uranium mononitride fully ceramic micro-encapsulated fuel using SCALE and Serpent codes
AR Hakim, AW Harto, A Agung
Nuclear Engineering and Technology 51 (1), 1-12, 2019
142019
The system can't perform the operation now. Try again later.
Articles 1–20