Follow
Duc Hoc Tran
Duc Hoc Tran
Associate Professor, Ho Chi Minh City University of Technology. 268 Ly Thuong Kiet Street, District
Verified email at hcmut.edu.vn - Homepage
Title
Cited by
Cited by
Year
A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time–cost–labor utilization tradeoff problem
DH Tran, MY Cheng, D Prayogo
Knowledge-Based Systems 94, 132-145, 2016
1662016
Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution
DL Luong, DH Tran, PT Nguyen
International Journal of Construction Management 21 (3), 271-283, 2021
1532021
Optimizing multiple-resources leveling in multiple projects using discrete symbiotic organisms search
MY Cheng, D Prayogo, DH Tran
Journal of Computing in Civil Engineering 30 (3), 04015036, 2016
1342016
Hybrid multiple objective artificial bee colony with differential evolution for the time–cost–quality tradeoff problem
DH Tran, MY Cheng, MT Cao
Knowledge-Based Systems 74, 176-186, 2015
1222015
Nature-inspired metaheuristic ensemble model for forecasting energy consumption in residential buildings
DH Tran, DL Luong, JS Chou
Energy, 116552, 2019
1112019
Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
MY Cheng, DH Tran, YW Wu
Automation in Construction 37, 88-97, 2014
992014
Combining machine learning models via adaptive ensemble weighting for prediction of shear capacity of reinforced-concrete deep beams
D Prayogo, MY Cheng, YW Wu, DH Tran
Engineering with Computers 36 (3), 1135-1153, 2020
832020
Two-phase differential evolution for the multiobjective optimization of time–cost tradeoffs in resource-constrained construction projects
MY Cheng, DH Tran
IEEE Transactions on Engineering Management 61 (3), 450-461, 2014
752014
Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects
DH Tran, L Luong-Duc, MT Duong, TN Le, AD Pham
Journal of Computational Design and Engineering 5 (2), 160-172, 2018
662018
Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution
DH Tran, LD Long
Engineering, Construction and Architectural Management 25 (5), 623-638, 2018
592018
Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm
DT Nguyen, L Le-Hoai, PB Tarigan, DH Tran
Alexandria Engineering Journal 61 (2), 1499-1518, 2022
502022
Optimization model for construction project resource leveling using a novel modified symbiotic organisms search
D Prayogo, MY Cheng, FT Wong, D Tjandra, DH Tran
Asian Journal of Civil Engineering 19, 625-638, 2018
482018
Optimizing time–cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods
DH Tran
Engineering, Construction and Architectural Management, 2020
452020
Opposition-based multiple-objective differential evolution to solve the time–cost–environment impact trade-off problem in construction projects
MY Cheng, DH Tran
Journal of Computing in Civil Engineering 29 (5), 04014074, 2015
402015
Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem
LD Long, DH Tran, PT Nguyen
International Journal of Computer Applications in Technology 60 (3), 203-214, 2019
372019
A hybrid fuzzy inference model based on RBFNN and artificial bee colony for predicting the uplift capacity of suction caissons
MY Cheng, MT Cao, DH Tran
Automation in construction 41, 60-69, 2014
372014
Multi-objective symbiotic organisms optimization for making time-cost tradeoffs in repetitive project scheduling problem
DH Tran, JS Chou, DL Luong
Journal of Civil Engineering and Management 25 (4), 322-339, 2019
352019
Fuzzy clustering chaotic-based differential evolution for resource leveling in construction projects
MY Cheng, DH Tran, ND Hoang
Journal of civil engineering and management 23 (1), 113-124, 2017
352017
Solving resource-constrained project scheduling problems using hybrid artificial bee colony with differential evolution
DH Tran, MY Cheng, MT Cao
Journal of Computing in Civil Engineering 30 (4), 04015065, 2016
322016
Integrating a novel multiple-objective FBI with BIM to determine tradeoff among resources in project scheduling
DT Nguyen, JS Chou, DH Tran
Knowledge-Based Systems 235, 107640, 2022
312022
The system can't perform the operation now. Try again later.
Articles 1–20