Bayesian inference with Markov chain Monte Carlo–based numerical approach for input model updating L Wu, W Ji, SM AbouRizk Journal of Computing in Civil Engineering 34 (1), 04019043, 2020 | 43 | 2020 |
Intelligent data-driven approach for enhancing preliminary resource planning in industrial construction L Wu, W Ji, B Feng, U Hermannd, SM AbouRizk Automation in Construction 130, 103846, 2021 | 37 | 2021 |
Distributed Simulation–Based Analytics Approach for Enhancing Safety Management Systems in Industrial Construction E Pereira, M Ali, L Wu, S Abourizk Journal of Construction Engineering and Management 146 (1), 04019091, 2020 | 22 | 2020 |
Automating Common Data Integration for Improved Data-Driven Decision-Support System in Industrial Construction L Wu, Z Li, S AbouRizk Journal of Computing in Civil Engineering 36 (2), 04021037, 2022 | 15 | 2022 |
Numerical-Based Approach for Updating Simulation Input in Real-Time L Wu, S AbouRizk Journal of Computing in Civil Engineering 35 (2), 04020067, 2021 | 12 | 2021 |
Towards construction’s digital future: A roadmap for enhancing data value L Wu, S AbouRizk Canadian Society of Civil Engineering Annual Conference, 225-238, 2021 | 9 | 2021 |
Automation in Extraction and Sharing Information Between BIM And Project Management Database L Wu, L Zuofu, S AbouRizk 2020 International Conference on Construction and Real Estate Management …, 2020 | 7 | 2020 |
A Generic Simulation Model for Selecting Fleet Size in Snow Plowing Operations Y Li, S Xu, L Wu, S AbouRizk, T K, Z Lei 2019 Winter Simulation Conference (WSC), 2966-2977, 2019 | 7 | 2019 |
Analyzing scaffolding needs for industrial construction sites using historical data L Wu, Y Mohamed, H Taghaddos, R Hermann Construction Research Congress 2014, 1596-1605, 2014 | 7 | 2014 |
Machine Learning–Based Bayesian Framework for Interval Estimate of Unsafe-Event Prediction in Construction L Wu, E Mohamed, P Jafari, S AbouRizk Journal of Construction Engineering and Management 149 (11), 04023118, 2023 | 5 | 2023 |
XiaomoLing/Detect3DRelation: first release of the detect 3D relation function (version v1.0.0), L Wu, S AbouRizk https://doi.org/10.5281/zenodo.4058576, 2020 | 4 | 2020 |
System Dynamics Modeling of the Construction Supply Chain in Industrial Modularized Construction Projects L Wu, S AbouRizk, K Li 2022 Winter Simulation Conference (WSC), 2409-2420, 2022 | 3 | 2022 |
A generic framework for simulation-based optimization using high-level architecture M Ali, E Mohamed, L Wu, S AbouRizk Proceedings of the Proceedings of the 21st International Conference on …, 2022 | 3 | 2022 |
XiaomoLing/LongestCommonSubString: First Release of Longest Common SubString R Library (Version v1.0.0) Z Li, L Wu, S AbouRizk https://doi.org/10.5281/zenodo.4057067, 2019 | 3 | 2019 |
Exploring the Potential of Reinforcement Learning in Pipe Spool Scheduling in Industrial Projects M ElMenshawy, L Wu, B Gue, S AbouRizk ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2024 | 2 | 2024 |
Enhancing Data-driven Applications in Construction L Wu | 1 | 2021 |
Disparities in Electric Vehicle Charging Infrastructure Distribution: A Socio-Spatial Clustering Study in King County, Washington S Ding, L Wu Washington, 2024 | | 2024 |
Construction Supply Chain Analysis on Forecasting the Demand for Small Equipment, Tools, and Consumables for Industrial Construction Projects E Jafari, L Wu, B Gue, M El Hattab, S AbouRizk Canadian Society of Civil Engineering Annual Conference, 13-26, 2023 | | 2023 |
Monte Carlo-Enabled Dynamic Multiple-Criteria Decision Analysis for Selecting Sustainable Construction Methods: A Wind Farm Case Study K Li, L Wu Canadian Society of Civil Engineering Annual Conference, 233-246, 2023 | | 2023 |
Job Labour-Hours Forecasting for a Pipe Spool Fabrication Shop Using Data Mining MR Karim, B Gue, L Wu, Y Mohamed Canadian Society of Civil Engineering Annual Conference, 437-449, 2023 | | 2023 |