Life cycle cost analysis for electric vs diesel bus transit in an Indian scenario A Sheth, D Sarkar Life 10 (1), 2019 | 58 | 2019 |
Critical chain project management for a highway construction project with a focus on theory of constraints D Sarkar, KN Jha, S Patel International Journal of Construction Management 21 (2), 194-207, 2021 | 55 | 2021 |
A framework of project risk management for the underground corridor construction of metro rail D Sarkar, G Dutta International Journal of Construction Project Management 4 (1), 21-38, 2011 | 49 | 2011 |
Efficacy and safety of topical nadifloxacin and benzoyl peroxide versus clindamycin and benzoyl peroxide in acne vulgaris: A randomized controlled trial S Choudhury, S Chatterjee, DK Sarkar, RN Dutta Indian Journal of Pharmacology 43 (6), 628-631, 2011 | 43 | 2011 |
Development of integrated cloud-based Internet of Things (IoT) platform for asset management of elevated metro rail projects D Sarkar, H Patel, B Dave International Journal of Construction Management 22 (10), 1993-2002, 2022 | 41 | 2022 |
Role of key performance indicators for evaluating the usage of BIM as tool for facility management of construction projects D Sarkar, HB Raghavendra, M Ruparelia International Journal of Civil & Structural Engineering 5 (4), 370-378, 2015 | 38 | 2015 |
Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India D Sarkar, M Singh International Journal of Construction Management 22 (10), 1818-1829, 2022 | 37 | 2022 |
Application of integrated fuzzy FCM-BIM-IoT for sustainable material selection and energy management of metro rail station box project in western India H Bapat, D Sarkar, R Gujar Innovative Infrastructure Solutions 6, 1-18, 2021 | 34 | 2021 |
Seismic structure of Sri Lanka using receiver function analysis: A comparison with other high-grade Gondwana terrains A Pathak, MR Kumar, D Sarkar Gondwana Research 10 (1-2), 198-202, 2006 | 32 | 2006 |
Application of fuzzy TOPSIS method for risk evaluation in development and implementation of solar park in India N Ranganath, D Sarkar, P Patel, S Patel International Journal of Construction Management 22 (14), 2764-2774, 2022 | 30 | 2022 |
Development of risk index for mass rapid transit system project in Western India through application of fuzzy analytical hierarchy process (FAHP) D Sarkar, M Singh International Journal of Construction Management 21 (5), 439-451, 2021 | 28 | 2021 |
Integrated interpretive structural modeling and fuzzy approach for project risk management of ports. D Sarkar, S Panchal International Journal of Construction Project Management 7 (1), 2015 | 25 | 2015 |
Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation … H Bapat, D Sarkar, R Gujar International Journal of Construction Management 23 (12), 2077-2086, 2023 | 21 | 2023 |
Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling N Bhatt, D Sarkar International Journal of Construction Management 20 (6), 653-665, 2020 | 20 | 2020 |
Social benefit cost and life cycle cost analysis of sustainable biodiesel bus transport in India A Sheth, D Sarkar, I Mukhopadhyay International Journal of Sustainable Engineering 14 (2), 123-136, 2021 | 19 | 2021 |
DEVELOPMENT OF LEAN INTEGRATED PROJECT DELIVERY MODEL FOR HIGHWAY PROJECTS. D Sarkar, M Mangrola International Journal of Construction Project Management 8 (1), 2016 | 19 | 2016 |
Decision tree analysis for project risk mitigation options for underground metro rail project D Sarkar International Journal of Decision Sciences, Risk and Management 4 (1-2), 25-37, 2012 | 19 | 2012 |
Evaluation of key performance indicators of integrated project delivery and BIM model for infrastructure transportation project in ahmedabad, India through decision-making approach H Bapat, D Sarkar, R Gujar Journal of The Institution of Engineers (India): Series A 102 (4), 995-1011, 2021 | 18 | 2021 |
Design and application of risk adjusted cumulative sum for strength monitoring of ready mixed concrete D Sarkar, G Dutta Journal of Construction Engineering and Management 136 (6), 623-631, 2010 | 18 | 2010 |
Automation in monitoring of construction projects through BIM-IoT-blockchain model D Sarkar, D Dhaneshwar, P Raval Journal of The Institution of Engineers (India): Series A 104 (2), 317-333, 2023 | 17 | 2023 |