Follow
Winston Shakantu
Winston Shakantu
Nelson Mandela University
Verified email at mandela.ac.za - Homepage
Title
Cited by
Cited by
Year
The need for technical auditing in the Zambian construction industry
B Sichombo, M Muya, W Shakantu, C Kaliba
International Journal of Project Management 27 (8), 821-832, 2009
992009
Cost escalation, schedule overruns and quality shortfalls on construction projects: The case of Zambia
M Muya, C Kaliba, B Sichombo, W Shakantu
International Journal of Construction Management 13 (1), 53-68, 2013
862013
The hidden cost of transportation of construction materials: an overview
W Shakantu, JE Tookey, PA Bowen
Journal of Engineering, Design and Technology 1 (1), 103-118, 2003
772003
Corruption in the construction industry: forms, susceptibility and possible solutions issues
W Shakantu
Civil Engineering= Siviele Ingenieurswese 2006 (7), 43-47, 2006
762006
The health and environmental impact of plastic waste disposal in South African Townships: A review
AA Adeniran, W Shakantu
International Journal of Environmental Research and Public Health 19 (2), 779, 2022
742022
Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa
W Shakantu, M Muya, J Tookey, P Bowen
Engineering, Construction and Architectural Management 15 (5), 423-439, 2008
622008
The contributions of construction material waste to project cost overruns in Abuja, Nigeria
I Saidu, W Shakantu
Acta Structilia: Journal for the Physical and Development Sciences 23 (1 …, 2016
552016
A systems thinking approach to eliminate delays on building construction projects in South Africa
A Aiyetan, J Smallwood, W Shakantu
Acta Structilia 18 (2), 19-39, 2011
532011
Exploring challenges to ICT utilisation in construction site management
AOU Ozumba, W Shakantu
Construction innovation 18 (3), 321-349, 2018
442018
Diffusion of innovations: an assessment of building information modelling uptake trends in South Africa
T Froise, W Shakantu
Journal of Construction Project Management and Innovation 4 (2), 895-911, 2014
432014
An investigation into cost overruns for ongoing building projects in Abuja, Nigeria
I Saidu, W Shakantu
Acta Structilia 24 (1), 53-72, 2017
422017
On-campus university student housing facility services prioritisation framework
F Simpeh, W Shakantu
Facilities 38 (1/2), 20-38, 2020
412020
Construction health and safety in South Africa: Status and recommendations
J Smallwood, T Haupt, W Shakantu
CIDB report, 2008
392008
Stakeholder perceptions in the factors constraining the development and implementation of public private partnerships in the Ugandan electricity sector
E Akampurira, D Root, W Shakantu
Journal of Energy in Southern Africa 20 (2), 2-9, 2009
372009
The BIM revolution: a literature review on rethinking the business of construction
C Allen, W Shakantu
WIT Transactions on Ecology and the Environment 204, 919-930, 2016
312016
The effect of poor materials management in the construction industry: A case study of Abuja, Nigeria
I Albert, W Shakantu, S Ibrahim
Acta Structilia 28 (1), 142-167, 2021
292021
ASTUDY OFTHE RELATIONSHIPBETWEEN MATERIAL WASTE AND COST OVERRUN IN THE CONSTRUCTION INDUSTRY
I Saidu, S Winston
9th cidb Postgraduate Conference, 2016
282016
Beyond Egan's supply chain management: advancing the role of logistics in the South African construction industry
W Shakantu, J Tookey, M Muya, P Bowen
Acta Structilia: Journal for the Physical and Development Sciences 14 (1 …, 2007
282007
An on-campus university student accommodation model
F Simpeh, W Shakantu
Journal of Facilities Management 18 (3), 213-229, 2020
252020
Influences on construction project delivery time performance
OA Aiyetan, JJ Smallwood, W Shakantu
the proceeding of Third Built Environment conference, Cape Town, South Africa, 2008
252008
The system can't perform the operation now. Try again later.
Articles 1–20