Cost and time control of construction projects: inhibiting factors and mitigating measures in practice YA Olawale, M Sun Construction management and economics 28 (5), 509-526, 2010 | 900 | 2010 |
Taxonomy for change causes and effects in construction projects M Sun, X Meng International journal of project management 27 (6), 560-572, 2009 | 510 | 2009 |
Maturity model for supply chain relationships in construction X Meng, M Sun, M Jones Journal of management in engineering 27 (2), 97-105, 2011 | 241 | 2011 |
Whole life costing in construction: a state of the art review. M Kishk, A Al-Hajj, R Pollock, G Aouad, N Bakis, M Sun Royal Institution of Chartered Surveyors (RICS), 2003 | 213 | 2003 |
Construction project control in the UK: Current practice, existing problems and recommendations for future improvement Y Olawale, M Sun International journal of project management 33 (3), 623-637, 2015 | 154 | 2015 |
Understanding IT in construction M Sun, R Howard Routledge, 2004 | 118 | 2004 |
A change management toolkit for construction projects M Sun, A Fleming, S Senaratne, I Motawa, ML Yeoh Architectural Engineering and Design Management 2 (4), 261-271, 2006 | 109 | 2006 |
Identification of key performance indicators for measuring the performance of value management studies in construction G Lin, GQ Shen, M Sun, J Kelly Journal of Construction Engineering and Management 137 (9), 698-706, 2011 | 103 | 2011 |
Critical parameters influencing value for money variations in PFI projects in the healthcare and transport sectors C Henjewele, M Sun, P Fewings Construction Management and Economics 29 (8), 825-839, 2011 | 92 | 2011 |
PCIM: Project control and inhibiting-factors management model Y Olawale, M Sun Journal of management in engineering 29 (1), 60-70, 2013 | 76 | 2013 |
The quality and value of higher education facilities: a comparative study C Vidalakis, M Sun, A Papa Facilities 31 (11/12), 489-504, 2013 | 67 | 2013 |
Comparative performance of healthcare and transport PFI projects: Empirical study on the influence of key factors C Henjewele, M Sun, P Fewings International Journal of Project Management 32 (1), 77-87, 2014 | 59 | 2014 |
Complexity for megaprojects in the energy sector E Kian Manesh Rad, M Sun, F Bosché Journal of Management in Engineering 33 (4), 04017009, 2017 | 55 | 2017 |
Planning for scanning using building information models: A novel approach with occlusion handling HK Biswas, F Bosché, M Sun 32nd International Symposium on Automation and Robotics in Construction and …, 2015 | 55 | 2015 |
A change management maturity model for construction projects M Sun, C Vidalakis, T Oza Proceedings 25th Annual ARCOM Conference, 7-9, 2009 | 52 | 2009 |
Improving the business process of reactive maintenance projects K Nita Ali, M Sun, G Petley, P Barrett Facilities 20 (7/8), 251-261, 2002 | 52 | 2002 |
Integrating value management into sustainable construction projects in Hong Kong ATW Yu, AA Javed, TI Lam, GQ Shen, M Sun Engineering, Construction and Architectural Management 25 (11), 1475-1500, 2018 | 50 | 2018 |
Spatial-temporal event-driven modeling for occupant behavior studies using immersive virtual environments S Saeidi, C Chokwitthaya, Y Zhu, M Sun Automation in Construction 94, 371-382, 2018 | 50 | 2018 |
Integration technologies to support organisational changes in the construction industry M Sun, G Aouad Advances in Concurrent Engineering, 596-603, 2023 | 45 | 2023 |
Managing changes in construction projects M Sun, M Sexton, G Aouad, A Fleming, S Senaratne, C Anumba, P Chung, ... EPSRC Industrial Report, 185-190, 2004 | 38 | 2004 |