Perancangan Sistem Kerja dan Ergonomi Industri B Suhardi Jakarta: Direktorat Pembinaan Sekolah Menengah Kejuruan, 2008 | 176 | 2008 |
Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach B Suhardi, E Juwita, RD Astuti Cogent Engineering 6 (1), 1597412, 2019 | 125 | 2019 |
Minimizing waste using lean manufacturing and ECRS principle in Indonesian furniture industry B Suhardi, N Anisa, PW Laksono Cogent engineering 6 (1), 1567019, 2019 | 112 | 2019 |
Analisis Postur Kerja dengan Metode REBA untuk Mengurangi Resiko Cedera pada Operator Mesin Binding di PT. Solo Murni Boyolali AD Joanda, B Suhardi Seminar dan Konferensi Nasional IDEC 2017, 2017 | 60 | 2017 |
Implementation of value stream mapping to reduce waste in a textile products industry B Suhardi, M Hermas Putri KS, WA Jauhari Cogent Engineering 7 (1), 1842148, 2020 | 42 | 2020 |
Analysis of the potential hazard identification and risk assessment (HIRA) and hazard operability study (HAZOP): case study B Suhardi, PW Laksono, JM Rohani, TS Ching International Journal of Engineering & Technology 7 (3.24), 1-7, 2018 | 41 | 2018 |
Analisis Postur kerja manual material handling menggunakan metode OWAS (ovako work postur analysis system) RD Astuti, B Suhardi Jurnal Gema Teknik 10 (1), 67-75, 2007 | 37 | 2007 |
Evaluasi Keselamatan Dan Kesehatan Kerja Pada Praktikum Perancangan Teknik Industri Ii Menggunakan Metode Job Safety Analysis R Sulistiyowati, B Suhardi, E Pujiyanto J@ ti Undip: Jurnal Teknik Industri 14 (1), 11-20, 2019 | 27 | 2019 |
Perbaikan proses produksi dengan standar cara produksi pangan yang baik (CPPB) dan work improvement in small enterprise (WISE) pada industri kerupuk Sala B Suhardi, M Kadita, PW Laksono Simetris: Jurnal Teknik Mesin, Elektro dan Ilmu Komputer 9 (1), 579-586, 2018 | 23 | 2018 |
Perbaikan Proses Produksi Ikm Xyz Berdasarkan Kriteria Cppb-Irt, Wise, Dan Sjh Lppom Mui B Suhardi, SV Wardani, WA Jauhari J@ ti Undip: Jurnal Teknik Industri 14 (2), 93-102, 2019 | 22 | 2019 |
Perbaikan waktu set up dengan menggunakan metode SMED B Suhardi, D Satwikaningrum Universitas Muhammadiyah Surakarta, 2015 | 20 | 2015 |
Perancangan Sistem Kerja dan Ergonomi Industri Jilid 2 untuk SMK B Suhardi Jakarta: Departemen Pendidikan Nasional, 2008 | 20 | 2008 |
Analysis of potential work accidents using hazard identification, risk assessment and risk control (HIRARC) method B Suhardi, AAV Estianto, PW Laksono 2016 2nd International Conference of Industrial, Mechanical, Electrical, and …, 2016 | 19 | 2016 |
Implementation of standardization work to improve productivity in indonesian furniture industry B Suhardi, AP Sari, PW Laksono Journal of Engineering and Applied Sciences 11 (12), 2602-2606, 2016 | 17 | 2016 |
Ergonomi Partisipatori Implementasi Bidang Kesehatan Dan Keselamatan Kerja IB Suhardi, ST Agustina Citrawati, IRD Astuti Deepublish, 2021 | 16 | 2021 |
Integrasi Supply Chain dan Dampaknya Terhadap Performa Perusahaan: Survei Pada Perusahaan Penyedia Jasa Makanan di Surakarta AI Setiawan, B Suhardi Benefit: Jurnal Manajemen dan Bisnis (Jurnal ini Sudah Migrasi) 9 (1), 1-20, 2006 | 16 | 2006 |
Water level control sistem otomatis sederhana pada tandon air di kawasan perumahan AS Aviv, A Wardayanti, E Budiningsih, AK Fimani, B Suhardi Performa: Media Ilmiah Teknik Industri 15 (2), 2016 | 15 | 2016 |
Penilaian Postur Kerja Menggunakan Metode Quick Exposure Checklist (QEC) di IKM Tahu Sari Murni D Pambayung, B Suhardi, RD Astuti PERFORMA: Media Ilmiah Teknik Industri 17 (1), 2018 | 14 | 2018 |
Design of polishing tools for improving work posture in furniture industry B Suhardi, RD Astuti, AT Widodo Proceedings of the Joint International Conference on Electric Vehicular …, 2015 | 13 | 2015 |
Redesain Shelter Bus Trans Jogja dengan Pendekatan Anthropometri dan Aksesibilitas B Suhardi, PW Laksono, YT Minarto Universitas Muhammadiyah Surakarta, 2013 | 13 | 2013 |