Follow
Pardis Pishdad-Bozorgi
Title
Cited by
Cited by
Year
A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends
S Tang, DR Shelden, CM Eastman, P Pishdad-Bozorgi, X Gao
Automation in construction 101, 127-139, 2019
9482019
BIM-enabled facilities operation and maintenance: A review
XinghuaGao, PardisPishdad-Bozorgi
Advanced Engineering Informatics 39, 2019
4102019
Planning and developing facility management-enabled building information model (FM-enabled BIM)
P Pishdad-Bozorgi, X Gao, C Eastman, AP Self
Automation in construction 87, 22-38, 2018
3692018
BIM assisted Building Automation System information exchange using BACnet and IFC
S Tang, DR Shelden, CM Eastman, P Pishdad-Bozorgi, X Gao
Automation in Construction 110, 103049, 2020
1462020
Symbiotic relationships between integrated project delivery (IPD) and trust
P Pishdad-Bozorgi, YJ Beliveau
International Journal of Construction Education and Research 12 (3), 179-192, 2016
1062016
State-of-the-art review of blockchain-enabled construction supply chain
JH Yoon, P Pishdad-Bozorgi
Journal of construction engineering and management 148 (2), 03121008, 2022
752022
Internet of things enabled data acquisition framework for smart building applications
X Gao, P Pishdad-Bozorgi, DR Shelden, S Tang
Journal of Construction Engineering and Management 147 (2), 04020169, 2021
672021
Identifying and prioritizing best practices to achieve flash track projects
RB Austin, P Pishdad-Bozorgi, JM de la Garza
Journal of construction engineering and management 142 (2), 04015077, 2016
582016
Advancing target price and target value design process in IPD using BIM and risk-sharing approaches
P Pishdad-Bozorgi, EH Moghaddam, Y Karasulu
Proceedings of the 49th ASC Annual International Conference Proceedings, San …, 2013
542013
Future smart facilities: State-of-the-art BIM-enabled facility management
P Pishdad-Bozorgi
Journal of Construction Engineering and Management 143 (9), 02517006, 2017
472017
ICT implementation of small-and medium-sized construction enterprises: organizational characteristics, driving forces, and value perceptions
H Lu, P Pishdad-Bozorgi, G Wang, Y Xue, D Tan
Sustainability 11 (12), 3441, 2019
442019
Developing a framework of metrics to assess collaboration in integrated project delivery
H Abdirad, P Pishdad-Bozorgi
Proceedings of the 50th Annual International Conference of the Associated …, 2014
442014
Understanding behavioral logic of information and communication technology adoption in small-and medium-sized construction enterprises: Empirical study from China
G Wang, H Lu, W Hu, X Gao, P Pishdad-Bozorgi
Journal of Management in Engineering 36 (6), 05020013, 2020
432020
Case studies on the role of integrated project delivery (IPD) approach on the establishment and promotion of trust
P Pishdad-Bozorgi
International Journal of Construction Education and Research 13 (2), 102-124, 2017
422017
A case study to examine environmental benefits of lean construction
S Ghosh, S Bhattacharjee, P Pishdad-Bozorgi, R Ganapathy
Proceedings of the 22nd Conference of the International Group of Lean …, 2014
412014
Assessment of integrated project delivery (IPD) risk and reward sharing strategies from the standpoint of collaboration: A game theory approach
P Pishdad-Bozorgi, D Srivastava
Construction Research Congress 2018, 196-206, 2018
402018
Comparative analysis of design-bid-build and design-build from the standpoint of claims
P Pishdad-Bozorgi, JM de la Garza
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
402012
Trends of assessing BIM implementation in construction research
H Abdirad, P Pishdad-Bozorgi
Computing in civil and building engineering (2014), 496-503, 2014
382014
A schema of trust building attributes and their corresponding integrated project delivery traits
P Pishdad-Bozorgi, YJ Beliveau
International journal of construction education and research 12 (2), 142-160, 2016
372016
A framework of developing machine learning models for facility life-cycle cost analysis
X Gao, P Pishdad-Bozorgi
Building Research & Information 48 (5), 501-525, 2020
332020
The system can't perform the operation now. Try again later.
Articles 1–20