Follow
Gafel Kareem Aswed
Gafel Kareem Aswed
Asst. Prof. of project management,university of kerbala
Verified email at uokerbala.edu.iq - Homepage
Title
Cited by
Cited by
Year
Application of Artificial Neural Networks in Predicting Subbase CBR Values Using Soil Indices Data
S Al-Busultan, GK Aswed, RRA Almuhanna, SE Rasheed
IOP Conference Series: Materials Science and Engineering 671 (1), 012106, 2020
352020
PRODUCTIVITY ESTIMATION MODEL FOR BRACKLAYER IN CONSTRUCTION PROJECTS USING NEURAL NETWORK
GK Aswed
Al-Qadisiyah Journal For Engineering Sciences 9 (2), 183- 199, 2016
232016
Investigating factors affecting feasibility study of construction projects in Iraq
MN Ahmed, HA Mohammed, GK Aswed, WSS Alyhya
Periodicals of Engineering and Natural Sciences (PEN) 7 (3), 1209-1217, 2019
102019
Forecasting construction time for road projects and infrastructure using the fuzzy PERT method
ZK Nemaa, GK Aswed
IOP conference series: materials science and engineering 1076 (1), 012123, 2021
92021
Modeling the water quality index and climate variables using an artificial neural network and non-linear regression
SAADMGKA Layla Ali Mohammed Saleh
International Journal of Engineering & Technology 7 (3), 1346-1350, 2018
92018
Forecasting the Final Cost of Iraqi Public School Projects Using Regression Analysis
ZSM Khaled, QJ Frayyeh, GK Aswed
72015
MODELING FINAL COSTS OF IRAQI PUBLIC SCHOOL PROJECTS USING NEURAL NETWORKS
Zeyad S. M. Khaled,Qais Jawad Frayyeh, Gafel kareem aswed
International Journal of Civil Engineering and Technology (IJCIET) http …, 2014
7*2014
Factors Affecting Safety in Construction Projects
MNA Gafel Kareem Aswed, Hussein Ali Mohammed
International Review of Civil Engineering (I.RE.C.E.) 11 (3), 135, 2020
3*2020
Modeling Contractor’s Cash-in-Flow in Public School Building Projects in Karbala
ZSM Khaled, GK Aswed
Al-Nahrain Journal for Engineering Sciences 20 (5), 1064-1070, 2017
32017
Predicting initial duration of project using linear and nonlinear regression models
MNAHAM Gafel Kareem Aswed
International Journal of Advanced Technology and Engineering Exploration 9 …, 2022
22022
Enhancing Sewage Pipeline Project Cost Estimations in Iraq through Artificial Neural Network Models
A Abbas, GK Aswed
IOP Conference Series: Earth and Environmental Science 1374 (1), 012086, 2024
12024
Developing a Sustainability Assessment System for an Educational Building in the Iraqi Environment
HA Mohammed, GK Aswed, MN Ahmed
Tikrit Journal of Engineering Sciences 31 (4), 25-33, 2024
2024
Evaluation of infrastructure quality: Telecommunication projects as a case study
MA Alwan, GK Aswed, MN Ahmed
AIP Conference Proceedings 3105 (1), 2024
2024
A study into international infrastructure standards and their impact on Iraqi projects
MAR Alwan, MN Ahmed, GK Aswed
AIP Conference Proceedings 3079 (1), 2024
2024
Decision-Making for Project Delivery System in Construction Projects Based on SWARA-TOPSIS Methods
MN Ahmed, GK Aswed, HA Mohammed
Tikrit Journal of Engineering Sciences 31 (1), 306-313, 2024
2024
FORCASTING THE NUMBER OF BIDDERS IN THE IRAQI SCHOOL PROJECTS TENDERS
HALIMMNA GAFEL KAREEM ASWED
International Journal of Civil Engineering & Technology (IJCIET) 9 (11 …, 2018
2018
Prediction Model for the Number of Work Stoppage days in Schools Projects in Provence of Baghdad بناء نموذج رياضي للتنبؤ بعدد أيام التوقف عن العمل في مشاريع المدارس في محافظة …
GKAMNAA Ghanimi
Albahir Journal 5 (No. 9 and 10), (97-110)A, 2017
2017
Modeling Cost Overrun of Public Schools Projects
G Kareem Aswed
journal of kerbala university 12 (1), 102-111, 2016
2016
Modeling Cost Overrun of Public Schools Projects
GK Aswed
Journal University of Kerbala 14 (No.3), 102-111, 2016
2016
PREDICTING FINAL COST FOR SCHOOL BUILDING PROJECTS USING ARTIFICIAL NEURAL NETWORK AND MULTI REGRESSION TECHNIQUES
GK Aswed
https://www.iqthod.org/articles/20, 2014
2014
The system can't perform the operation now. Try again later.
Articles 1–20