Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries S Banihashemi, MR Hosseini, H Golizadeh, S Sankaran International journal of project management 35 (6), 1103-1119, 2017 | 569 | 2017 |
Sustainable delivery of megaprojects in Iran: Integrated model of contextual factors MR Hosseini, S Banihashemi, I Martek, H Golizadeh, F Ghodoosi Journal of Management in Engineering 34 (2), 05017011, 2018 | 87 | 2018 |
Barriers to adoption of RPAs on construction projects: a task–technology fit perspective H Golizadeh, MR Hosseini, DJ Edwards, S Abrishami, N Taghavi, ... Construction Innovation 19 (2), 149-169, 2019 | 71 | 2019 |
Digital engineering potential in addressing causes of construction accidents H Golizadeh, CKH Hon, R Drogemuller, MR Hosseini Automation in Construction 95, 284-295, 2018 | 61 | 2018 |
Sustainability by Information and Communication Technology: A paradigm shift for construction projects in Iran MR Hosseini, S Banihashemi, R Rameezdeen, H Golizadeh, ... Journal of Cleaner Production 168, 1-13, 2017 | 50 | 2017 |
Climatic, parametric and non-parametric analysis of energy performance of double-glazed windows in different climates S Banihashemi, H Golizadeh, MR Hosseini, M Shakouri International Journal of Sustainable Built Environment 4 (2), 307-322, 2015 | 48 | 2015 |
Scientometric analysis of research on “remotely piloted aircraft” A research agenda for the construction industry H Golizadeh, MR Hosseini, I Martek, D Edwards, M Gheisari, ... Engineering, Construction and Architectural Management 27 (3), 634-657, 2020 | 34 | 2020 |
A review of customer relationship (CRM) implications: benefits and challenges in construction organizations C Preece, HY Chong, H Golizadeh, J Rogers Deakin University, 2015 | 32 | 2015 |
Building and construction quality: systematic literature review, thematic and gap analysis J Yarnold, S Banihashemi, C Lemckert, H Golizadeh International Journal of Building Pathology and Adaptation 41 (5), 942-964, 2023 | 29 | 2023 |
Automated tool for predicting duration of construction activities in tropical countries H Golizadeh, AN Sadeghifam, H Aadal, MZ Abd Majid KSCE Journal of Civil Engineering 20 (1), 12-22, 2016 | 29 | 2016 |
Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches J Zhang, H Li, H Golizadeh, C Zhao, S Lyu, R Jin Engineering, Construction and Architectural Management 27 (5), 997-1038, 2020 | 21 | 2020 |
An integrated model of BIM return on investment for Australian small-and medium-sized enterprises (SMEs) A Sompolgrunk, S Banihashemi, MR Hosseini, H Golzad, A Hajirasouli Engineering, Construction and Architectural Management 30 (5), 2048-2074, 2023 | 20 | 2023 |
Mental Health Causation in the Construction Industry: A Systematic Review Employing a Psychological Safety Climate Model H Golzad, A Teimoory, SJ Mousavi, A Bayramova, DJ Edwards Buildings 13 (10), 2442, 2023 | 17 | 2023 |
Automated estimation of completion time for dam projects H Golizadeh, S Banihashemi, AN Sadeghifam, C Preece International Journal of Construction Management 17 (3), 197-209, 2017 | 14 | 2017 |
Data-driven BIM for energy efficient building design S Banihashemi, H Golizadeh, FP Rahimian Routledge, 2022 | 11 | 2022 |
Predicting Significant Characteristics of Concrete Containing Palm Oil Fuel Ash H Golizadeh, S BANIHASHEMI Journal of Construction in Developing Countries 20 (1), 85-98, 2015 | 11 | 2015 |
Heritage building information modeling (HBIM) for heritage conservation: Framework of challenges, gaps, and existing limitations of HBIM T Penjor, S Banihashemi, A Hajirasouli, H Golzad Digital Applications in Archaeology and Cultural Heritage 35, e00366, 2024 | 10 | 2024 |
Adoption to online collaboration in the construction sites of developing countries H Golizadeh, MAM Alfareh, SSM Ata, MI Mohamad Journal of Basic and Applied Scientific Research 4 (5), 29-35, 2014 | 4 | 2014 |
BIM and Construction Health and Safety: Uncovering, Adoption and Implementation H Golzad, S Banihashemi, C Hon, R Drogemuller Routledge, 2023 | 2 | 2023 |
Strategic alignment of BIM and big data through systematic analysis and model development A Sompolgrunk, S Banihashemi, H Golzad, K Le Nguyen Automation in Construction 168, 105801, 2024 | 1 | 2024 |