Follow
Mohsen Shahandashti, Ph.D., P.E.
Title
Cited by
Cited by
Year
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
PH Chen, SM Shahandashti
Automation in Construction 18 (4), 434-443, 2009
2072009
Forecasting Engineering News-Record Construction Cost Index Using Multivariate Time Series Models
SM Shahandashti, B Ashuri
Journal of Construction Engineering and Management 139 (9), 1237-1243, 2013
1192013
Sensing and field data capture for construction and facility operations
S Taneja, B Akinci, JH Garrett, L Soibelman, E Ergen, A Pradhan, P Tang, ...
Journal of construction engineering and management 137 (10), 870-881, 2011
942011
Highway construction cost forecasting using vector error correction models
SM Shahandashti, B Ashuri
Journal of management in engineering 32 (2), 04015040, 2016
892016
Empirical tests for identifying leading indicators of ENR construction cost index
B Ashuri, SM Shahandashti, J Lu
Construction Management and Economics 30 (11), 917-927, 2012
772012
Data-fusion approaches and applications for construction engineering
SM Shahandashti, SN Razavi, L Soibelman, M Berges, CH Caldas, ...
Journal of construction engineering and management 137 (10), 863-869, 2011
762011
Improving accuracy in predicting city-level construction cost indices by combining linear ARIMA and nonlinear ANNs
S Kim, CY Choi, M Shahandashti, KR Ryu
Journal of Management in Engineering 38 (2), 04021093, 2022
412022
Investment valuation model for renewable energy systems in buildings
H Kashani, B Ashuri, SM Shahandashti, J Lu
Journal of Construction Engineering and Management 141 (2), 04014074, 2015
382015
Pipeline construction cost forecasting using multivariate time series methods
S Kim, B Abediniangerabi, M Shahandashti
Journal of Pipeline Systems Engineering and Practice 12 (3), 04021026, 2021
332021
Proactive seismic rehabilitation decision-making for water pipe networks using simulated annealing
SM Shahandashti, B Pudasaini
Natural Hazards Review 20 (2), 04019003, 2019
332019
Building energy performance analysis of ultra-high-performance fiber-reinforced concrete (UHP-FRC) façade systems
B Abediniangerabi, SM Shahandashti, B Bell, SH Chao, A Makhmalbaf
Energy and Buildings 174, 262-275, 2018
332018
Identification of critical pipes for proactive resource-constrained seismic rehabilitation of water pipe networks
B Pudasaini, SM Shahandashti
Journal of Infrastructure Systems 24 (4), 04018024, 2018
322018
Predicting city-level construction cost index using linear forecasting models
CY Choi, KR Ryu, M Shahandashti
Journal of construction engineering and management 147 (2), 04020158, 2021
312021
A data-driven framework for energy-conscious design of building facade systems
B Abediniangerabi, SM Shahandashti, A Makhmalbaf
Journal of Building Engineering 29, 101172, 2020
312020
A data envelopment analysis (DEA) model for building energy benchmarking
B Ashuri, J Wang, M Shahandashti, M Baek
Journal of Engineering, Design and Technology 17 (4), 747-768, 2019
312019
Lifecycle benefit-cost analysis of underground freight transportation systems
SE Zahed, SM Shahandashti, M Najafi
Journal of Pipeline Systems Engineering and Practice 9 (2), 04018003, 2018
282018
Empirical investigation of temporal association between architecture billings index and construction spending using time-series methods
B Abediniangerabi, SM Shahandashti, N Ahmadi, B Ashuri
Journal of Construction Engineering and Management 143 (10), 04017080, 2017
282017
Integrating underground freight transportation into existing intermodal systems
M Najafi, S Ardekani, SM Shahandashti
282016
Comparative empirical analysis of temporal relationships between construction investment and economic growth in the United States
N Ahmadi, M Shahandashti
Construction Economics and Building 17 (3), 85-108, 2017
262017
Topological surrogates for computationally efficient seismic robustness optimization of water pipe networks
B Pudasaini, M Shahandashti
Computer‐Aided Civil and Infrastructure Engineering 35 (10), 1101-1114, 2020
252020
The system can't perform the operation now. Try again later.
Articles 1–20