Building information modelling, lean and sustainability: An integration framework to promote performance improvements in the construction industry F Mellado, ECW Lou Sustainable cities and society 61, 102355, 2020 | 146 | 2020 |
Developing weighting system for refurbishment building assessment scheme in Malaysia through analytic hierarchy process (AHP) approach SN Kamaruzzaman, ECW Lou, PF Wong, R Wood, AI Che-Ani Energy Policy 112, 280-290, 2018 | 146 | 2018 |
Sustainability-led design: Feasibility of incorporating whole-life cycle energy assessment into BIM for refurbishment projects RE Edwards, E Lou, A Bataw, SN Kamaruzzaman, C Johnson Journal of Building Engineering 24, 100697, 2019 | 110 | 2019 |
Critical success factors for e-tendering implementation in construction collaborative environments: people and process issues ECW Lou, M Alshawi Journal of Information Technology in Construction 14, 2009 | 109 | 2009 |
Industrialized building systems: Strategic outlook for manufactured construction in Malaysia ECW Lou, KAM Kamar Journal of Architectural Engineering 18 (2), 69-74, 2012 | 78 | 2012 |
Environmental assessment schemes for non-domestic building refurbishment in the Malaysian context SN Kamaruzzaman, ECW Lou, N Zainon, NSM Zaid, PF Wong Ecological Indicators 69, 548-558, 2016 | 76 | 2016 |
What should be recycled: An integrated model for product recycling desirability AA Mohamed Sultan, E Lou, PT Mativenga Journal of Cleaner Production 154, 51-60, 2017 | 74 | 2017 |
Malaysian affordability housing policies revisited D Samad, N Zainon, FAM Rahim, E Lou Open House International 42 (1), 44-51, 2017 | 67 | 2017 |
Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement F Mellado, ECW Lou, CLC Becerra Engineering, Construction and Architectural Management 27 (2), 579-608, 2020 | 60 | 2020 |
Effects of innovation capability on radical and incremental innovations and business performance relationships EM Kamal, ECW Lou, AM Kamaruddeen Journal of Engineering and Technology Management 67, 101726, 2023 | 58 | 2023 |
Potential integration of blockchain technology into smart sustainable city (SSC) developments: a systematic review PF Wong, FC Chia, MS Kiu, ECW Lou Smart and Sustainable Built Environment 11 (3), 559-574, 2022 | 55 | 2022 |
The pervasiveness of e‐readiness in the global built environment arena ECW Lou, JS Goulding Journal of Systems and Information Technology 12 (3), 180-195, 2010 | 46 | 2010 |
Building and construction classification systems ECW Lou, JS Goulding Architectural Engineering and Design Management 4 (3-4), 206-220, 2008 | 43 | 2008 |
The impact of vertical greenery system on building thermal performance in tropical climates NDAM Shuhaimi, SM Zaid, M Esfandiari, E Lou, N Mahyuddin Journal of Building Engineering 45, 103429, 2022 | 41 | 2022 |
Digitisation of existing buildings to support building assessment schemes: Viability of automated sustainability-led design scan-to-BIM process F Mellado, PF Wong, K Amano, C Johnson, ECW Lou Architectural Engineering and Design Management 16 (2), 84-99, 2020 | 39 | 2020 |
E-readiness in construction: an incongruous paradigm of variables JS Goulding, ECW Lou Architectural Engineering and Design Management 9 (4), 265-280, 2013 | 39 | 2013 |
E-readiness: How ready are UK construction organizations to adopt IT ECW Lou Association of Researchers in Construction Management, 2010 | 39 | 2010 |
Factors affecting the ownership of low-cost housing for socio-economic development in Malaysia FA Mohd-Rahim, N Zainon, S Sulaiman, E Lou, NH Zulkifli Journal of Building Performance 10 (1), 1-16, 2019 | 37 | 2019 |
BeReal: Tools and methods for implementing benefits realisation and management K Yates, S Sapountzis, ECW Lou, M Kagioglou 5th Nordic Conference on Construction Economics and Organisation, 223-232, 2009 | 37 | 2009 |
Managing supply chain complexity: foresight for wind turbine composite waste PT Mativenga, E Lou Procedia Cirp 69, 938-943, 2018 | 34 | 2018 |