Follow
Asieh Varyani
Title
Cited by
Cited by
Year
Determining the optimum production quantity in three-echelon production system with stochastic demand
A Varyani, A Jalilvand-Nejad, P Fattahi
The International Journal of Advanced Manufacturing Technology 72, 119-133, 2014
162014
Optimizing Mixed-Model Synchronous Assembly Lines with Bipartite Sequence-Dependent Setup Times in Advanced Manufacturing
A Varyani, M Salehi, M Heydari Gharahcheshmeh
Energies 17 (12), 2865, 2024
32024
Determining of the optimum production quantity in supply chain with stochastic demand
A Varyani, P Fattahi
International Journal of Industrial Engineering & Production Management 24 …, 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–3