Analisis tingkat kepuasan pengguna sistem informasi perpustakaan menggunakan Pieces Framework I Indrawati, PLL Belluano, H Harlinda, FAR Tuasamu, D Lantara ILKOM Jurnal Ilmiah 11 (2), 118-128, 2019 | 158 | 2019 |
Dunia Industri: Perspektif Psikologi Tenaga Kerja D Lantara, M Nusran Nas Media Pustaka, 2019 | 139 | 2019 |
Comparison of Floyd-Warshall algorithm and greedy algorithm in determining the shortest route H Azis, D Lantara, Y Salim 2018 2nd East Indonesia conference on computer and information technology …, 2018 | 35 | 2018 |
Indonesian Islamic banks: A review of the financial state before and after the COVID-19 pandemic. Banks and Bank Systems, 17 (4), 12–24 D Lantara, J Junaidi, N Rauf, A Pawennari, RN Achmad | 33 | 2022 |
Determination of the optimal number of employees using the full time equivalent (FTE) method at pt. XYZ N Rauf Journal of Industrial Engineering Management 6 (1), 49-56, 2021 | 26 | 2021 |
Indonesian Islamic banks: A review of the financial state before and after the COVID-19 pandemic. Banks and Bank Systems, 17 (4), 12–24 D Lantara, J Junaidi, N Rauf, A Pawennari, RN Achmad | 15 | 2022 |
Analisa Penerapan Alat Pelindung Diri (APD) Terhadap Produktivitas Karyawan Dengan Pendekatan Ergonomi Parsipatori Di Percetakan N Ikasari, D Lantara, N Chairany, A Bella Journal of Industrial Engineering Management 3 (1), 271947, 2018 | 14 | 2018 |
Workload Analysis To Determine The Number Of Labor In Soap Production Using The Full Time Equivalent Method: A Case Study Of PT. XY AF Wahyulistiani, MT Safirin, T Tranggono, D Lantara Journal of Industrial Engineering Management 7 (3), 232-237, 2022 | 11 | 2022 |
Analisis Penerapan Lean Manufaktur Untuk Mengurangi Pemborosan Di Lantai Produksi PT. Eastern Pearl Flour Mills Makassar N Chairany, D Lantara, N Ikasari, A Ukkas Journal of Industrial Engineering Management 3 (1), 33-39, 2018 | 11 | 2018 |
Studi produk halal daging ayam potong dengan pendekatan rantai pasok (supply chain) di Makassar A Risyaldi, M Nusran, D Lantara International Journal Mathla’ul Anwar of Halal Issues 1 (1), 40-48, 2021 | 10 | 2021 |
Produksi akrolein dengan proses degradasi menggunakan gelombang suara D Lantara, R Kalla Journal of Chemical Process Engineering 4 (2), 97-102, 2019 | 9 | 2019 |
Indonesian Islamic banks: A review of the financial state before and after the COVID-19 pandemic D Lantara Bussiness Perspectives 17 (4), 12-24, 2022 | 8 | 2022 |
Analisis Losses pada Pemindahan Material LGSO di Front Penambangan A Habibie, S Widodo, MN Alim, EP Umar, D Lantara, A Nurwaskito, ... Jurnal Geomine 7 (3), 212-218, 2019 | 8* | 2019 |
Steganography for data hiding in digital audio data using combined least significant bit and 4-wrap length method ABW Putra, MT Jufri, D Lantara, A Assyauqi, A Wajiansyah, A Pranolo 2018 2nd East Indonesia Conference on Computer and Information Technology …, 2018 | 8 | 2018 |
Pengembangan model sistem dinamik terhadap ketersedian air bersih di Kabupaten Kutai Timur Provinsi Kalimantan Timur D Primadian, D Lantara, R Malik, T Nur J Ind Eng Manag 1 (2), 16-20, 2016 | 8 | 2016 |
Proses Produksi Pembuatan Kapal Layar Phinisi untuk Meminimalkan Waktu Produksi dengan Model PERT (Programming Evaluation dan Review Technique) D Lantara Jurnal Energi dan Manufaktur 7 (1), 1-118, 2014 | 8 | 2014 |
Pengenalan Jenis Laptop menggunakan Metode Markerless N Nasruddin, H Azis, D Lantara Prosiding SAKTI (Seminar Ilmu Komputer dan Teknologi Informasi) 3 (2), 148-151, 2018 | 7 | 2018 |
Machine maintenance planning using the Reliability Centered Maintenance (RCM) method at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency S Sulkifli, D Lantara, MF Hafid, KA Mahendra Journal of Sustainability Industrial Engineering and Management System 1 (1 …, 2022 | 6 | 2022 |
Analisis Alterasi Pada Endapan Bijih Besi Di Daerah Tanjung, Kecamatan Bontocani, Kabupaten Bone, Provinsi Sulawesi Selatan F Firdaus, TA Kandora, D Lantara, AB Thamsi, H Harwan, H Bakri Jurnal Geosapta 6 (1), 49-56, 2020 | 6 | 2020 |
Analysis of The Physical Workload of Sugarcane Harvest Workers as The Basis for Determining The Length of Rest Break at Bone Arasoe Sugar Factory IN Afiah Journal of Industrial Engineering Management 8 (1), 55-64, 2023 | 4 | 2023 |