Follow
Dirgahayu Lantara
Dirgahayu Lantara
Universitas Muslim Indonesia
Verified email at umi.ac.id - Homepage
Title
Cited by
Cited by
Year
Analisis tingkat kepuasan pengguna sistem informasi perpustakaan menggunakan Pieces Framework
I Indrawati, PLL Belluano, H Harlinda, FAR Tuasamu, D Lantara
ILKOM Jurnal Ilmiah 11 (2), 118-128, 2019
1582019
Dunia Industri: Perspektif Psikologi Tenaga Kerja
D Lantara, M Nusran
Nas Media Pustaka, 2019
1392019
Comparison of Floyd-Warshall algorithm and greedy algorithm in determining the shortest route
H Azis, D Lantara, Y Salim
2018 2nd East Indonesia conference on computer and information technology …, 2018
352018
Indonesian Islamic banks: A review of the financial state before and after the COVID-19 pandemic. Banks and Bank Systems, 17 (4), 12–24
D Lantara, J Junaidi, N Rauf, A Pawennari, RN Achmad
332022
Determination of the optimal number of employees using the full time equivalent (FTE) method at pt. XYZ
N Rauf
Journal of Industrial Engineering Management 6 (1), 49-56, 2021
262021
Indonesian Islamic banks: A review of the financial state before and after the COVID-19 pandemic. Banks and Bank Systems, 17 (4), 12–24
D Lantara, J Junaidi, N Rauf, A Pawennari, RN Achmad
152022
Analisa Penerapan Alat Pelindung Diri (APD) Terhadap Produktivitas Karyawan Dengan Pendekatan Ergonomi Parsipatori Di Percetakan
N Ikasari, D Lantara, N Chairany, A Bella
Journal of Industrial Engineering Management 3 (1), 271947, 2018
142018
Workload Analysis To Determine The Number Of Labor In Soap Production Using The Full Time Equivalent Method: A Case Study Of PT. XY
AF Wahyulistiani, MT Safirin, T Tranggono, D Lantara
Journal of Industrial Engineering Management 7 (3), 232-237, 2022
112022
Analisis Penerapan Lean Manufaktur Untuk Mengurangi Pemborosan Di Lantai Produksi PT. Eastern Pearl Flour Mills Makassar
N Chairany, D Lantara, N Ikasari, A Ukkas
Journal of Industrial Engineering Management 3 (1), 33-39, 2018
112018
Studi produk halal daging ayam potong dengan pendekatan rantai pasok (supply chain) di Makassar
A Risyaldi, M Nusran, D Lantara
International Journal Mathla’ul Anwar of Halal Issues 1 (1), 40-48, 2021
102021
Produksi akrolein dengan proses degradasi menggunakan gelombang suara
D Lantara, R Kalla
Journal of Chemical Process Engineering 4 (2), 97-102, 2019
92019
Indonesian Islamic banks: A review of the financial state before and after the COVID-19 pandemic
D Lantara
Bussiness Perspectives 17 (4), 12-24, 2022
82022
Analisis Losses pada Pemindahan Material LGSO di Front Penambangan
A Habibie, S Widodo, MN Alim, EP Umar, D Lantara, A Nurwaskito, ...
Jurnal Geomine 7 (3), 212-218, 2019
8*2019
Steganography for data hiding in digital audio data using combined least significant bit and 4-wrap length method
ABW Putra, MT Jufri, D Lantara, A Assyauqi, A Wajiansyah, A Pranolo
2018 2nd East Indonesia Conference on Computer and Information Technology …, 2018
82018
Pengembangan model sistem dinamik terhadap ketersedian air bersih di Kabupaten Kutai Timur Provinsi Kalimantan Timur
D Primadian, D Lantara, R Malik, T Nur
J Ind Eng Manag 1 (2), 16-20, 2016
82016
Proses Produksi Pembuatan Kapal Layar Phinisi untuk Meminimalkan Waktu Produksi dengan Model PERT (Programming Evaluation dan Review Technique)
D Lantara
Jurnal Energi dan Manufaktur 7 (1), 1-118, 2014
82014
Pengenalan Jenis Laptop menggunakan Metode Markerless
N Nasruddin, H Azis, D Lantara
Prosiding SAKTI (Seminar Ilmu Komputer dan Teknologi Informasi) 3 (2), 148-151, 2018
72018
Machine maintenance planning using the Reliability Centered Maintenance (RCM) method at PT Perkebunan Nusantara XIV Camming Sugar Factory in Bone Regency
S Sulkifli, D Lantara, MF Hafid, KA Mahendra
Journal of Sustainability Industrial Engineering and Management System 1 (1 …, 2022
62022
Analisis Alterasi Pada Endapan Bijih Besi Di Daerah Tanjung, Kecamatan Bontocani, Kabupaten Bone, Provinsi Sulawesi Selatan
F Firdaus, TA Kandora, D Lantara, AB Thamsi, H Harwan, H Bakri
Jurnal Geosapta 6 (1), 49-56, 2020
62020
Analysis of The Physical Workload of Sugarcane Harvest Workers as The Basis for Determining The Length of Rest Break at Bone Arasoe Sugar Factory
IN Afiah
Journal of Industrial Engineering Management 8 (1), 55-64, 2023
42023
The system can't perform the operation now. Try again later.
Articles 1–20