Seguir
Carl Haas
Carl Haas
Professor of Engineering, University of Waterloo
Dirección de correo verificada de uwaterloo.ca - Página principal
Título
Citado por
Citado por
Año
The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components
F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas
Automation in Construction 49, 201-213, 2015
5802015
Measuring the impact of rework on construction cost performance
BG Hwang, SR Thomas, CT Haas, CH Caldas
Journal of construction engineering and management 135 (3), 187-198, 2009
5072009
Automated progress tracking using 4D schedule and 3D sensing technologies
Y Turkan, F Bosche, CT Haas, R Haas
Automation in construction 22, 414-421, 2012
4732012
State of research in automatic as-built modelling
V Pătrăucean, I Armeni, M Nahangi, J Yeung, I Brilakis, C Haas
Advanced Engineering Informatics 29 (2), 162-171, 2015
4112015
US construction labor productivity trends, 1970–1998
E Allmon, CT Haas, JD Borcherding, PM Goodrum
Journal of construction engineering and management 126 (2), 97-104, 2000
3932000
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
J Song, CT Haas, C Caldas, E Ergen, B Akinci
Automation in construction 15 (2), 166-177, 2006
3622006
Automated retrieval of 3D CAD model objects in construction range images
F Bosche, CT Haas
Automation in Construction 17 (4), 499-512, 2008
3402008
Tracking the location of materials on construction job sites
J Song, CT Haas, CH Caldas
Journal of construction engineering and management 132 (9), 911-918, 2006
3112006
Tool to design for construction worker safety
JA Gambatese, JW Hinze, CT Haas
Journal of Architectural Engineering 3 (1), 32-41, 1997
3041997
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas
Journal of computing in civil engineering 28 (4), 05014004, 2014
2582014
Assignment and allocation optimization of partially multiskilled workforce
JE Gomar, CT Haas, DP Morton
Journal of construction Engineering and Management 128 (2), 103-109, 2002
2492002
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
J Teizer, CH Caldas, CT Haas
Journal of Construction Engineering and Management 133 (11), 880-888, 2007
2382007
Supplier selection process in an integrated construction materials management model
M Safa, A Shahi, CT Haas, KW Hipel
Automation in construction 48, 64-73, 2014
2112014
US construction labor productivity trends, 1970–1998
P Teicholz, PM Goodrum, CT Haas
Journal of Construction Engineering and Management 127 (5), 427-429, 2001
1952001
Assessing the impact of materials tracking technologies on construction craft productivity
D Grau, CH Caldas, CT Haas, PM Goodrum, J Gong
Automation in construction 18 (7), 903-911, 2009
1912009
A novel selective disassembly sequence planning method for adaptive reuse of buildings
B Sanchez, C Haas
Journal of Cleaner Production 183, 998-1010, 2018
1822018
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
F Bosche, CT Haas, B Akinci
Journal of Computing in Civil Engineering 23 (6), 311-318, 2009
1782009
A proximity-based method for locating RFID tagged objects
J Song, CT Haas, CH Caldas
Advanced Engineering Informatics 21 (4), 367-376, 2007
1692007
Activity analysis for direct-work rate improvement in construction
MC Gouett, CT Haas, PM Goodrum, CH Caldas
Journal of Construction Engineering and Management 137 (12), 1117-1124, 2011
1662011
Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems
R Rehan, MA Knight, CT Haas, AJA Unger
Water research 45 (16), 4737-4750, 2011
1652011
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20