Decision support system for a heat-recovery section with equipment degradation MP Marcos, JL Pitarch, C de Prada Decision Support Systems 137, 113380, 2020 | 8 | 2020 |
Modelling and real-time optimisation of an industrial cooling-water network MP Marcos, JL Pitarch, C de Prada, C Jasch 2018 22nd International Conference on System Theory, Control and Computing …, 2018 | 8 | 2018 |
Integrated Process Re-Design with Operation in the Digital Era: Illustration through an Industrial Case Study MP Marcos, JL Pitarch, C de Prada Processes 9 (7), 1203, 2021 | 6 | 2021 |
Optimal distributed load allocation and resource utilisation in evaporation plants MP Marcos, JL Pitarch, C Jasch, C de Prada Computer Aided Chemical Engineering 46, 979-984, 2019 | 6 | 2019 |
Desarrollo e implementación de un sistema de control en una planta piloto híbrida MP Marcos, C de Prada Moraga, JLP Pérez Actas de las XXXVIII Jornadas de Automática, 479-485, 2017 | 3 | 2017 |
Modelling and real-time optimisation of a heat-exchanger network MP Marcos, JL Pitarch, C de Prada IFAC-PapersOnLine 53 (2), 11780-11785, 2020 | 1 | 2020 |
Real-time optimisation for a heat-recovery section with equipment degradation MP Marcos, JL Pitarch, C Prada XL Jornadas de Automática, 513-519, 2019 | 1 | 2019 |
2019 IEEE 4 th Colombian Conference on Automatic Control (CCAC) D Montes, P Riquelme, M Marcos, C De Prada, C González, ... | 1 | |
Advanced decision support through real-time optimization in the process industry MP Marcos Núñez | | 2022 |
Optimal distributed load allocation and resource utilisation in evaporation plants MP Marcos Núñez, JL Pitarch Pérez, C Jasch, C Prada Moraga Elsevier, 2019 | | 2019 |
D3. 4–First report on methods for distributed optimisation of plants with shared resources LS Maxeiner, S Wenzel, JL Pitarch Pérez, MP Marcos SPIRE-EU, 2018 | | 2018 |
Modelling and real-time optimisation of an industrial cooling-water network MP Marcos Núñez, JL Pitarch Pérez, C Prada Moraga, C Jasch IEEE, 2018 | | 2018 |
Modelado para operación óptima de un sistema de refrigeración industrial MP Marcos, JL Pitarch, C de Prada, C Jasch Actas de las XXXIX Jornadas de Automática, 702-709, 2018 | | 2018 |
Implementación de una planta piloto, desarrollo de su sistema de control y estudio de su operación óptima MP Marcos Universidad de Valladolid, 2017 | | 2017 |
Energy-efficient Operation of a Multi-unit Recovery Cycle in EU’s largest Viscose Fiber Plant. JL Pitarch, C Jasch, M Kalliski, YN Misz, MP Marcos, C de Prada, ... | | |