Data driven production modeling and simulation of complex automobile general assembly plant J Wang, Q Chang, G Xiao, N Wang, S Li Computers in industry 62 (7), 765-775, 2011 | 179 | 2011 |
Maintenance opportunity planning system Q Chang, J Ni, P Bandyopadhyay, S Biller, G Xiao | 119 | 2007 |
On-line optimization for internal plunge grinding G Xiao, S Malkin CIRP annals 45 (1), 287-292, 1996 | 111 | 1996 |
Energy saving opportunity analysis of automotive serial production systems (March 2012) Q Chang, G Xiao, S Biller, L Li IEEE Transactions on Automation Science and Engineering 10 (2), 334-342, 2012 | 101 | 2012 |
Transient analysis of downtimes and bottleneck dynamics in serial manufacturing systems Q Chang, S Biller, G Xiao | 101 | 2010 |
Characterization of weld attributes in ultrasonic welding of short carbon fiber reinforced thermoplastic composites K Wang, D Shriver, Y Li, M Banu, SJ Hu, G Xiao, J Arinez, HT Fan Journal of Manufacturing Processes 29, 124-132, 2017 | 92 | 2017 |
The costs of downtime incidents in serial multistage manufacturing systems J Liu, Q Chang, G Xiao, S Biller | 91 | 2012 |
Supervisory factory control based on real-time production feedback Q Chang, J Ni, P Bandyopadhyay, S Biller, G Xiao | 90 | 2007 |
Performance analysis for serial production lines with Bernoulli machines and real-time WIP-based machine switch-on/off control Z Jia, L Zhang, J Arinez, G Xiao International Journal of Production Research 54 (21), 6285-6301, 2016 | 82 | 2016 |
Energy efficiency management of an integrated serial production line and HVAC system MP Brundage, Q Chang, Y Li, G Xiao, J Arinez IEEE transactions on automation science and engineering 11 (3), 789-797, 2013 | 80 | 2013 |
Bottleneck detection of manufacturing systems using data driven method L Li, Q Chang, J Ni, G Xiao, S Biller 2007 IEEE international symposium on assembly and manufacturing, 76-81, 2007 | 76 | 2007 |
A heat transfer model based on finite difference method for grinding B Shen, AJ Shih, G Xiao | 75 | 2011 |
Transient performance analysis of serial production lines with geometric machines G Chen, C Wang, L Zhang, J Arinez, G Xiao IEEE Transactions on Automatic Control 61 (4), 877-891, 2015 | 74 | 2015 |
Assembly strategies for remanufacturing systems with variable quality returns X Jin, SJ Hu, J Ni, G Xiao IEEE Transactions on Automation Science and Engineering 10 (1), 76-85, 2012 | 74 | 2012 |
System and method for selection of prediction tools LG Barajas, P Bandyopadhyay, G Xiao US Patent 7,558,771, 2009 | 71 | 2009 |
Dynamic production system diagnosis and prognosis using model-based data-driven method J Zou, Q Chang, J Arinez, G Xiao, Y Lei Expert Systems with Applications 80, 200-209, 2017 | 68 | 2017 |
Data-driven modeling and real-time distributed control for energy efficient manufacturing systems J Zou, Q Chang, J Arinez, G Xiao Energy 127, 247-257, 2017 | 68 | 2017 |
Throughput bottleneck prediction of manufacturing systems using time series analysis L Li, Q Chang, G Xiao, S Ambani | 67 | 2011 |
Thermocouple fixation method for grinding temperature measurement B Shen, G Xiao, C Guo, S Malkin, AJ Shih | 64 | 2008 |
Finite production run-based serial lines with Bernoulli machines: Performance analysis, bottleneck, and case study Z Jia, L Zhang, J Arinez, G Xiao IEEE Transactions on Automation Science and Engineering 13 (1), 134-148, 2015 | 61 | 2015 |